CN205241111U - Arm gear train structure is received to jib loading boom - Google Patents

Arm gear train structure is received to jib loading boom Download PDF

Info

Publication number
CN205241111U
CN205241111U CN201520864371.4U CN201520864371U CN205241111U CN 205241111 U CN205241111 U CN 205241111U CN 201520864371 U CN201520864371 U CN 201520864371U CN 205241111 U CN205241111 U CN 205241111U
Authority
CN
China
Prior art keywords
pulley
arm
tower
crane arm
assembly pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520864371.4U
Other languages
Chinese (zh)
Inventor
王建军
米成宏
周雪丰
郑怀鹏
李岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Construction Machinery Group Co Ltd XCMG
Original Assignee
Xuzhou Construction Machinery Group Co Ltd XCMG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Construction Machinery Group Co Ltd XCMG filed Critical Xuzhou Construction Machinery Group Co Ltd XCMG
Priority to CN201520864371.4U priority Critical patent/CN205241111U/en
Application granted granted Critical
Publication of CN205241111U publication Critical patent/CN205241111U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses an arm gear train structure is received to jib loading boom, including assembly pulley II (8) of installing at the top of the tower, install assembly pulley I (2) at jib loading boom (6) tip, rise to rise wire rope (3), draw in rod (7) and outside link (5), it rises the cylinder around going out from two respectively to play to rise wire rope, get into behind the quartic diversion and receive in the arm change times train, a pulley via the top of the tower assembly pulley II in, wear a pulley to the I of jib loading boom outermost head sheave group in, another pulley among the re -entering time top of the tower assembly pulley II, another pulley to the I of jib loading boom outermost head sheave group in again, last fag end is fixed on the top of the tower otic placode. The utility model discloses it makes the operation reliably steady more to increase receipts arm pulley increase multiplying power, wire rope can prolong body of the tower symmetrical arrangement, and the body of the tower is more stable, hoisting mechanism can arrange subaerial, has reduced the aerial work risk, has improved customer's satisfaction.

Description

A kind of crane arm is received arm wheel train structure
Technical field
The utility model relates to a kind of crane arm and receives arm wheel train structure, belongs to derrick crane technical field.
Background technology
At present, the top of derrick crane is made up of a crane arm and a counter-jib conventionally, and crane arm uses push-and-pull rod armJoint can not be gone up receipts. As shown in Figure 1, existing crane arm is received arm train and is adopted two multiplying powers to receive arm, but in actual mechanical processThere are the following problems: rope system wears around cumbersome, and its speed while receiving arm, receives stationarity and the poor stability of arm; ShouldTrain operating mode applicatory is relatively fixing, cannot realize the upper receipts function of crane arm joint, is not suitable for special operation condition.
Summary of the invention
The problem existing for above-mentioned prior art, the utility model provides a kind of crane arm to receive arm wheel train structure, can realizeThe upper receipts function of weighing arm joint, is suitable for special operation condition, can reduce high-altitude application control and eminence and fall risk, the receipts arm mistake of crane armCheng Pingwen, safe and reliable, can improve client's satisfaction.
To achieve these goals, tower body and jacking apparatus are introduced in a kind of bottom that the utility model adopts, and comprise and are arranged on tower topAssembly pulley II, be arranged on the assembly pulley I of crane arm end, hoist rope, draw-in bar and outside link, described in the steel wire that hoistsRope lays out from two cylinders that hoist respectively, enters and receive in arm zoom train, via one in tower top assembly pulley II after four break-insIndividual pulley, wears to a pulley in crane arm outermost end assembly pulley I, then returns to another pulley in tower top assembly pulley II, more extremelyAnother pulley in crane arm outermost end assembly pulley I, last fag end is fixed on tower top otic placode; Described draw-in bar and outside linkBe arranged symmetrically in respectively between the crane arm and tower top of both sides.
Described hoist rope is the steel wire rope that many group wirerope-windings form together.
The end of described draw-in bar and outside link all has connecting hole, and is connected with crane arm or tower top by bolt.
Described draw-in bar and outside link are expansion link.
Compared with prior art, the utility model, by improving wheel train structure, changes them into four multiplying power structures by two multiplying powers, treats steelAfter silk rope is put on, operation lifting mechanism, makes both sides hoist rope obtain pretension. Guarantee after bilateral hoist rope pretension, thenOperation lifting mechanism, allows both sides crane arm synchronously shake slowly around root twisted point. Connect with the collision block of tower top when crane arm middle partWhile touching, crane arm is separately fixed on tower top, has realized the receipts arm of crane arm, be applicable to special operation condition. Increase and receive arm pulleyIncreasing multiplying power makes operation more steadily reliable; Steel wire rope can prolong tower body and be arranged symmetrically with, and makes tower body more stable; Lifting mechanism energy clothPut on the ground, reduced high-rise working risk, improved client's satisfaction.
Brief description of the drawings
Fig. 1 is the structural representation that existing jib for tower crane is received arm train;
Fig. 2 is the structural representation that the utility model is received arm train;
Fig. 3 is use view of the present utility model;
Fig. 4 is that crane arm is received the structural representation after arm.
In figure: 1, tower top otic placode, 2, assembly pulley I, 3, hoist rope, 4, the cylinder that hoists, 5, outside link, 6, liftingArm, 7, draw-in bar, 8, assembly pulley II.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figures 2 to 4, a kind of crane arm is received arm wheel train structure, comprises the assembly pulley II8 that is arranged on tower top, has been arranged onThe assembly pulley I2 of weighing arm 6 ends, hoist rope 3, draw-in bar 7 and outside link 5, described hoist rope 3 is respectively from twoThe individual cylinder that hoists lays out, and enters and receive in arm zoom train after four break-ins, via a pulley in tower top assembly pulley II8, wearsTo a pulley in crane arm outermost end assembly pulley I2, then return to another pulley in tower top assembly pulley II8, then to crane armAnother pulley in the assembly pulley I2 of outer end, last fag end is fixed on tower top otic placode 1; 5 points of described draw-in bar 7 and outside linksBe not arranged symmetrically between the crane arm 6 and tower top of both sides.
When use, first hoist rope 3 is laid out from two cylinders 4 that hoist respectively, after four break-ins, enter and receive arm zoom wheelIn system, via a pulley in tower top assembly pulley II8, wear to a pulley in crane arm outermost end assembly pulley I2, then returnReturn another pulley in tower top assembly pulley II8, then to another pulley in crane arm outermost end assembly pulley I2, last fag end is fixedOn tower top otic placode 1. After steel wire rope is put on, operation lifting mechanism, makes both sides hoist rope obtain pretension. Guarantee that bilateral risesRise after steel wire rope pretension, the lifting mechanism that reruns, allows both sides crane arm synchronously shake slowly around root twisted point. Work as crane armWhen middle part contacts with the collision block of tower top, crane arm is separately fixed on tower top, has realized the receipts arm of crane arm.
The steel wire rope that described hoist rope 3 forms for many group wirerope-windings together.
The end of described draw-in bar 7 and outside link 5 all has connecting hole, and is connected with crane arm 6 or tower top by bolt,Be convenient to remove and install.
Preferably, described draw-in bar 7 and outside link 5 are expansion link, under special circumstances also can by adjust draw-in bar 7 withAnd the flexible situation of outside link 5 realizes the folding and unfolding of crane arm.
From said structure, the utility model, by improving wheel train structure, changes them into four multiplying power structures by two multiplying powers, treats steelAfter silk rope is put on, operation lifting mechanism, makes both sides hoist rope obtain pretension. Guarantee after bilateral hoist rope pretension, thenOperation lifting mechanism, allows both sides crane arm synchronously shake slowly around root twisted point. Connect with the collision block of tower top when crane arm middle partWhile touching, crane arm is separately fixed on tower top, has realized the receipts arm of crane arm, be applicable to special operation condition. Increase and receive arm pulleyIncreasing multiplying power makes operation more steadily reliable; Steel wire rope can prolong tower body and be arranged symmetrically with, and makes tower body more stable; Lifting mechanism energy clothPut on the ground, reduced high-rise working risk, improved client's satisfaction.

Claims (4)

1. crane arm is received an arm wheel train structure, it is characterized in that, comprises the assembly pulley II (8) that is arranged on tower top, has been arranged onThe assembly pulley I (2) of weighing arm (6) end, hoist rope (3), draw-in bar (7) and outside link (5), describedRise steel wire rope (3) and lay out from two cylinders that hoist respectively, after four break-ins, enter and receive in arm zoom train, via tower top pulleyA pulley in group II (8), wears to a pulley in crane arm outermost end assembly pulley I (2), then returns to tower top assembly pulleyAnother pulley in II (8), then to another pulley in crane arm outermost end assembly pulley I (2), last fag end is fixed on tower topOn otic placode (1); The crane arm (6) that described draw-in bar (7) and outside link (5) are arranged symmetrically in respectively both sides and tower top itBetween.
2. a kind of crane arm according to claim 1 is received arm wheel train structure, it is characterized in that described hoist rope (3)The steel wire rope together forming for many group wirerope-windings.
3. a kind of crane arm according to claim 2 is received arm wheel train structure, it is characterized in that, described draw-in bar (7) withAnd the end of outside link (5) all has connecting hole, and be connected with crane arm (6) or tower top by bolt.
4. a kind of crane arm according to claim 2 is received arm wheel train structure, it is characterized in that, described draw-in bar (7) withAnd outside link (5) is expansion link.
CN201520864371.4U 2015-10-30 2015-10-30 Arm gear train structure is received to jib loading boom Active CN205241111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520864371.4U CN205241111U (en) 2015-10-30 2015-10-30 Arm gear train structure is received to jib loading boom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520864371.4U CN205241111U (en) 2015-10-30 2015-10-30 Arm gear train structure is received to jib loading boom

Publications (1)

Publication Number Publication Date
CN205241111U true CN205241111U (en) 2016-05-18

Family

ID=55940190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520864371.4U Active CN205241111U (en) 2015-10-30 2015-10-30 Arm gear train structure is received to jib loading boom

Country Status (1)

Country Link
CN (1) CN205241111U (en)

Similar Documents

Publication Publication Date Title
US9725285B2 (en) Method of raising a crane boom
CN103058056B (en) Container lifting mechanism with balance anti-swinging function and eight-rope lifting three-point balancing method using container lifting mechanism
CN203382420U (en) Crane and fixed jib luffing device for same
CN205241111U (en) Arm gear train structure is received to jib loading boom
CN203486792U (en) Crane and pre-tensioning system of super-lift device
CN202880719U (en) Olecranon-shaped arm head of hoisting multiplying power winding rope of movable arm tower-type crane
CN202744226U (en) Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane
CN212315380U (en) Tower crane mast lifting device
CN204823892U (en) High stability hoist
CN205500626U (en) Climbing mechanism in tower crane
CN206188249U (en) Novel swift mounting structure of pull rod
CN204752021U (en) Symmetrical train of two jib loading boom towers machine
CN203728449U (en) Automatically-controlled parallel telescopic counterweightconnecting arm type crane device
CN203321336U (en) Device for adopting drilling line to realize lifting of oil rig self-elevating derrick
CN203284098U (en) Disassembled and assembled part self-lifting device for tower crane
CN207738303U (en) A kind of generator unit stator lifting steering
CN205555924U (en) A system's device for high altitude dismantlement tower crane
CN202379643U (en) Large tonnage crane and lifting mechanism thereof
CN205023767U (en) Armful arm structure of both arms formula tower machine
CN201128657Y (en) Crane winding device for lifting wire cable
CN204675620U (en) A kind of swing crane Suspension hook structure
CN205151579U (en) Two horizontal arm hoists
CN210710488U (en) Special lifting appliance for maintenance of hydraulic station of wind generating set
CN211688028U (en) Landing stage approach hoisting accessory
CN111960297B (en) Liftable mast device of tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant