CN205224589U - Mode structure is hung in shutoff of floor hole - Google Patents

Mode structure is hung in shutoff of floor hole Download PDF

Info

Publication number
CN205224589U
CN205224589U CN201521012821.3U CN201521012821U CN205224589U CN 205224589 U CN205224589 U CN 205224589U CN 201521012821 U CN201521012821 U CN 201521012821U CN 205224589 U CN205224589 U CN 205224589U
Authority
CN
China
Prior art keywords
hole
template
shutoff
floor
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201521012821.3U
Other languages
Chinese (zh)
Inventor
谭云泉
周奕君
周在辉
邱生
金煜
甘文彬
俞国华
秦庆春
朱庆玲
王铁峰
李娴
张俊恒
张劲松
赵永城
雍忠孟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN201521012821.3U priority Critical patent/CN205224589U/en
Application granted granted Critical
Publication of CN205224589U publication Critical patent/CN205224589U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a mode structure is hung in shutoff of floor hole, the hole has on the flooring of floor, hanging the mould and including the template, template settings is in the hole below, hanging the mould and still including the dovetail, the rubber cluster is hung piece and hang spring, the dovetail sets up at template surface, and the rubber cluster inlays to be established in the dovetail, rubber cluster protrusion just can set up between flooring and template in template surface, is hung a setting and in the hole, is hung and connect through the hang spring between piece and the template, be equipped with the watering layer in the hole of template top. The utility model discloses a mode structure is hung in shutoff of floor hole can install fast, produce to leak the thick liquid when preventing to pour into a mould, and the shutoff is closely knit, has avoided the later stage to cause leaking, the infiltration problem, and simultaneously, template repeatedly usable improves the rate of utilization of template.

Description

Floor hole shutoff hanging mould structure
Technical field
The utility model relates to a kind of floor hole plugging structure of building, particularly a kind of floor hole shutoff hanging mould structure.
Background technology
At present, need to carry out floor hole, hole waterproof shutoff process in interior decoration engineering, in existing construction technology, usually there is following problem: 1, large from lower layer support mold materials consumption, recruitment is many and affect lower floor's work progress, the hang spring taking same layer to hang mould mode exposes, and produces lasting corrosion and forms hole; 2, have living space between template and former floor placing of concrete time unavoidable spillage cause shutoff after there is leaking in leakiness, the even concrete that seeps water has the problems such as loose or dislocation.
Utility model content
The utility model in order to solve the problem of prior art, provide a kind of can Fast Installation, dismounting hanging mould structure, simultaneously can prevent the problems such as floor hole leaks, infiltration.
Concrete technical scheme is as follows: a kind of floor hole shutoff hanging mould structure; the flooring of described floor has hole; the described mould that hangs comprises template; template-setup is below hole; the described mould that hangs also comprises dovetail groove; rubber string; by hanging piece and hang spring; described dovetail groove is arranged on template surface; rubber string is embedded in described dovetail groove, and described rubber string protrudes from template surface and can be arranged between flooring and template, is describedly arranged in hole by hanging piece; connected by hang spring by between hanging piece and template, in the hole above described template, be provided with pouring layer.
Preferably, described template is provided with lifting hole(eyelet), and described hang spring can be arranged in lifting hole(eyelet), and described dovetail groove is arranged around lifting hole(eyelet).
Preferably, described in hang mould and also comprise fixture, fixture is arranged on template bottom surface, and hang spring one end is separable with fixture or be connected.
Preferably, described fixture is screw, described hang spring one end can winding on screw.
Preferably, the sidewall of described hole offers multiple inclined hole, and inclined hole is communicated with hole.
Preferably, the described end by hanging piece is inserted in inclined hole.
Preferably, described pouring layer covers the described end by hanging piece.
Preferably, described is reinforcing bar by hanging piece.
Technique effect of the present utility model: floor hole shutoff hanging mould structure of the present utility model can Fast Installation, prevent from producing spillage during cast, shutoff is closely knit, avoid the later stage cause leak, seepage problem; Meanwhile, template is reusable, improves the utilization rate of template.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the utility model embodiment floor hole shutoff hanging mould structure.
Fig. 2 is another schematic diagram of the utility model embodiment floor hole shutoff hanging mould structure.
Fig. 3 is the schematic diagram of the utility model embodiment template.
Fig. 4 is the schematic diagram of the utility model embodiment dovetail groove.
Fig. 5 is the schematic diagram of the utility model embodiment rubber string.
Fig. 6 is the sectional view of the utility model embodiment template.
Fig. 7 is another schematic diagram of the utility model embodiment template.
Fig. 8 is the sectional view of the utility model embodiment flooring.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further.
As depicted in figs. 1 and 2, floor hole shutoff hanging mould structure of the present utility model, the flooring 1 of described floor has hole 11, the described mould that hangs comprises template 2, template 2 is arranged on below hole 11, the described mould that hangs also comprises dovetail groove 3, rubber string 4, by hanging piece 5 and hang spring 6, described dovetail groove 3 is arranged on template 2 surface, rubber string 4 is embedded in described dovetail groove 3, described rubber string 4 protrudes from template 2 surface and can be arranged between flooring 1 and template 2, when template 2 is arranged on below flooring 1, rubber string 4 can be close to flooring 1 soffit, by hole 11 shutoff, rubber string 4 can prevent from, during pouring, spillage occurs.The described hanging piece 5 that is subject to is arranged in hole 11, is connected by hang spring 6 by between hanging piece 5 and template 2, is provided with pouring layer 7 in the hole 11 above described template 2, and pouring 7 can be formed, for shutoff hole 11 by cement mortar pouring.The floor hole shutoff hanging mould structure of technique scheme can Fast Installation, and prevent from producing spillage during cast, shutoff is closely knit, avoid the later stage cause leak, seepage problem.
As shown in Figures 3 to 8, further, described template 2 is provided with lifting hole(eyelet) 21, and described hang spring 6 can be arranged in (as shown in Figure 1) in lifting hole(eyelet) 21, and lifting hole(eyelet) 21 is for penetrating the through hole of template 2, and described dovetail groove 3 is arranged around lifting hole(eyelet) 21.The described mould that hangs also comprises fixture 8, and fixture 8 is arranged on bottom template 2, and hang spring 6 one end is connected with fixture 8.One end of hang spring 6, through after lifting hole(eyelet) 21, is connected with fixture 8, makes hang spring 6 can hold template 2.In the present embodiment, described fixture 8 is screw, and its nail is bottom template 2, and an end of described hang spring 6 can be looped around on screw, is convenient to connect and release.Described flooring 1 offers multiple inclined hole 12, and inclined hole 12 is communicated with hole 11, and described inclined hole 12 is formed by the hole wall in electric hammer drill Durchgangshohle hole 11, thus forms the Eight characters hole of Eight characters shape.The described end by hanging piece 5 is inserted in inclined hole 12, template 2 more firmly can must be hung and be located at below flooring 1.Described pouring layer 7 covers the described end by hanging piece 5, thus prevents pouring layer 7 from producing loose or dislocation.In the present embodiment, described is reinforcing bar by hanging piece 5, and steel-bar arrangement is in hole 11, and two ends are inserted in inclined hole 12, and one end of described hang spring 6 is connected with in the middle part of reinforcing bar.As shown in Figure 5, described rubber string 4 is in " returning " font, and hole 11 is relative with perforate in the middle part of rubber string 4, makes rubber string 4 can gap between Sealing formboard 2 and flooring 1.
The floor hole shutoff hanging mould structure of the present embodiment in use, to insert in inclined hole 12 by hanging piece 5 two ends, strain hang spring 6 by an end of hang spring 6 through the lifting hole(eyelet) 21 in template 2 and push template 2 bottom surface, an end of described hang spring 6 is looped around on template 2 bottom surface fixture 8.Unclamp hang spring 6 and the connecting end portion of fixture 8 after pouring layer 7 solidifies, template 2 can be separated with fixture 8, thus template 2 can be disassembled, make template 2 reusable.The floor hole shutoff hanging mould structure of the present embodiment can improve demoulding work efficiency processed, and not spillage during placing of concrete, reaches the shutoff of hole waterproof without hidden danger.
It is to be noted; above-mentioned preferred embodiment is only and technical conceive of the present utility model and feature is described; its object is to person skilled in the art can be understood content of the present utility model and implement according to this, protection domain of the present utility model can not be limited with this.All equivalences done according to the utility model Spirit Essence change or modify, and all should be encompassed within protection domain of the present utility model.

Claims (8)

1. a floor hole shutoff hanging mould structure; the flooring of described floor has hole; the described mould that hangs comprises template; template-setup is below hole; it is characterized in that: described in hang mould and also comprise dovetail groove; rubber string; by hanging piece and hang spring; described dovetail groove is arranged on template surface; rubber string is embedded in described dovetail groove, and described rubber string protrudes from template surface and can be arranged between flooring and template, is describedly arranged in hole by hanging piece; connected by hang spring by between hanging piece and template, in the hole above described template, be provided with pouring layer.
2. floor hole shutoff hanging mould structure as claimed in claim 1, it is characterized in that: described template is provided with lifting hole(eyelet), described hang spring can be arranged in lifting hole(eyelet), and described dovetail groove is arranged around lifting hole(eyelet).
3. floor hole shutoff hanging mould structure as claimed in claim 2, is characterized in that: described in hang mould and also comprise fixture, fixture is arranged on template bottom surface, and hang spring one end is separable with fixture or be connected.
4. floor hole shutoff hanging mould structure as claimed in claim 3, is characterized in that: described fixture is screw, described hang spring one end can winding on screw.
5. the floor hole shutoff hanging mould structure as described in claim arbitrary in Claims 1-4, is characterized in that: the sidewall of described hole offers multiple inclined hole, and inclined hole is communicated with hole.
6. floor hole shutoff hanging mould structure as claimed in claim 5, is characterized in that: the described end by hanging piece is inserted in inclined hole.
7. floor hole shutoff hanging mould structure as claimed in claim 6, is characterized in that: described pouring layer covers the described end by hanging piece.
8. floor hole shutoff hanging mould structure as claimed in claim 7, is characterized in that: described is reinforcing bar by hanging piece.
CN201521012821.3U 2015-12-09 2015-12-09 Mode structure is hung in shutoff of floor hole Withdrawn - After Issue CN205224589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521012821.3U CN205224589U (en) 2015-12-09 2015-12-09 Mode structure is hung in shutoff of floor hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521012821.3U CN205224589U (en) 2015-12-09 2015-12-09 Mode structure is hung in shutoff of floor hole

Publications (1)

Publication Number Publication Date
CN205224589U true CN205224589U (en) 2016-05-11

Family

ID=55899664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521012821.3U Withdrawn - After Issue CN205224589U (en) 2015-12-09 2015-12-09 Mode structure is hung in shutoff of floor hole

Country Status (1)

Country Link
CN (1) CN205224589U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401718A (en) * 2015-12-09 2016-03-16 苏州金螳螂建筑装饰股份有限公司 Floor hole blockage lifting mold structure
CN110934077A (en) * 2019-12-19 2020-03-31 巨星农牧股份有限公司 Pig house

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401718A (en) * 2015-12-09 2016-03-16 苏州金螳螂建筑装饰股份有限公司 Floor hole blockage lifting mold structure
CN110934077A (en) * 2019-12-19 2020-03-31 巨星农牧股份有限公司 Pig house

Similar Documents

Publication Publication Date Title
CN202450559U (en) Waterproof structure of basement
CN103276916B (en) A kind of building method of sealing light weight concrete construction board wall wall hole and filling plate
CN205224589U (en) Mode structure is hung in shutoff of floor hole
CN103556819B (en) A kind of construction method of reserved constructional column hole on beam slab
CN104612289A (en) Method for constructing external walls
CN103628575A (en) Large-altitude-difference variable-section concrete structure construction joint and construction method thereof
CN204199695U (en) A kind of plug of shear-wall big steel-moulds crab bolt hole
CN205653902U (en) Floor entrance to a cave block structure
CN208576020U (en) A kind of prefabricated board being embedded with fastener
CN105401718A (en) Floor hole blockage lifting mold structure
CN212176569U (en) Floor preformed hole plugging device
CN204510487U (en) Shear wall construction hole hermetically-sealed construction
CN204800838U (en) A built -up plate for parapet production
CN205276631U (en) A waterproof cushion that is used for hanging in control room mould height
CN204357097U (en) A kind of building scaffold improving working security reinforces base
CN205100554U (en) Tube hole hangs mould device
CN203867143U (en) Ground tile and connecting structure thereof
CN206829618U (en) A kind of quick service sleeve part
CN204010717U (en) The hanging apparatus of canyon protective cover plate
CN203782986U (en) Reinforcement protective cover limiting device
CN105064682A (en) Pipe hole formwork-suspending device
CN207714372U (en) Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail
CN205840329U (en) A kind of novel pipeline reserves sleeve pipe
CN204202616U (en) Concrete structure settlement monitoring mark
CN104047375A (en) Structure for brickwork connection and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160511

Effective date of abandoning: 20171128

AV01 Patent right actively abandoned

Granted publication date: 20160511

Effective date of abandoning: 20171128

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned