CN205195872U - Mining pit shaft monitored control system - Google Patents
Mining pit shaft monitored control system Download PDFInfo
- Publication number
- CN205195872U CN205195872U CN201520980767.5U CN201520980767U CN205195872U CN 205195872 U CN205195872 U CN 205195872U CN 201520980767 U CN201520980767 U CN 201520980767U CN 205195872 U CN205195872 U CN 205195872U
- Authority
- CN
- China
- Prior art keywords
- cage
- module
- wireless transport
- transport module
- pit shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a mining pit shaft monitored control system. Among the control section, video presentation module and audio input module link to each other with the computer through the circuit respectively, and the computer is connected with wireless transmission module I, detection portion includes that two are installed in the sound video monitoring module at cage top, two sound video monitoring modules of installing respectively on the upper and lower two -layer roof of cage to reaching two and establishing two -layer audio playback equipment about the cage respectively, cage top installation wireless transmission module II, each sound video monitoring module and audio playback equipment link to each other with wireless transmission module II respectively. The utility model discloses the wall of a well condition of breaking can be discover early, the emergence of calamity is effectively avoided, can coordinate to handle problems the warning of to propaganda directed to communicate that overloads of discovery personnel between workman in the cage and the administrator, send out the not good staff of standing state, can prior notice inspection personnel. Make current dispatch system more perfect, reduced production and administrative cost, improved productivity and level of control.
Description
Technical field
The utility model relates to a kind of supervisory control system, and specifically a kind of mining pit shaft supervisory control system, belongs to mining communication technical field.
Background technology
Coal is the main energy sources of China, and China's coal-mine about 95% is well industrial and mineral, and along with depth of excavation increase, in the face of complicated geological conditions and severe operational environment, security incident happens occasionally.
In China East China, Central China and the Northeast, existing more than 100 shaft of vertical well creates shaft rupture due to ground settlement so far.Shaft wall fracture has a strong impact on mine safety production, and brings great economic loss.To the pit shaft that these shaft wall fracture have occurred and shaft wall fracture likely occurs, the borehole wall deformation monitoring system of Erecting and improving, to grasp sidewall safety situation, to adopt an effective measure in time, becomes necessary; The state of mind of coal miner multipair workman before going into the well checks, and during gug, mostly there is no similar inspection, before going into the well, the employee of ill health may take the means of hoodwinking to escape inspection, because personnel are many in gug process, the reason such as crowded is difficult to check whether manned cage overloads, bring very large potential safety hazard, indirectly improve management and production cost, therefore set up and the supervisory control system of scene monitoring in cage is necessary very much.
Summary of the invention
For above-mentioned prior art Problems existing, the purpose of this utility model is to provide a kind of mining pit shaft supervisory control system, cage inner case in the borehole wall of pit shaft and pit shaft can be monitored in real time, ensure work safety under ore deposit, reduce production and administration cost, bursting problem can be solved in time, improve safety in production level.
For achieving the above object, the technical solution adopted in the utility model is: a kind of mining pit shaft supervisory control system, comprise control section and monitoring part, control section comprises video display module, Audio Input Modules, computer and wireless transport module I, video display module is connected with computer respectively by circuit with Audio Input Modules, and computer is connected with wireless transport module I; Monitoring part comprises audio frequency and video monitoring modular, two the audio frequency and video monitoring modulars be arranged on respectively on the upper and lower 2-ply upper board of cage that two are arranged on cage top, and two are located at the bilevel audio-frequence player device of cage respectively, wireless transport module II is installed at cage top, each audio frequency and video monitoring modular and audio-frequence player device are powered by power module, and are connected with wireless transport module II respectively.
Preferably, in order to ensure monitoring effect and use safety, audio frequency and video monitoring modular is Mine-used I. S infrared acoustic frequency video camera.
Preferably, wireless transport module I and wireless transport module II are double antenna wireless switch, and take bridge mode to mate connection.
Preferably, power module is mine explosion-suppression and intrinsic safety type D.C. regulated power supply, ensure that the fail safe of ore deposit underground work.
The utility model can find shaft wall fracture situation early, effectively avoids the generation of shaft rupture; The other keeper of workman in cage and computer can converse Coordination Treatment problem each other, and discovery personnel overload can be propagandaed directed to communicate tank under prompting personnel by Audio Input Modules; Find that there is the employee of ill health, can the upper and lower well head inspection personnel of prior notice, require related personnel's gug or arrange special messenger to escort to go home.Perfect existing dispatching patcher, to guaranteeing safe production, reducing production and administration cost, raising labour productivity and managerial skills, strengthen enterprise's competitiveness in the market significant.
Accompanying drawing explanation
Fig. 1 is connection diagram of the present utility model;
Fig. 2 is schematic diagram of the present utility model;
In figure, 11. video display modules, 12. Audio Input Modules, 13. computers, 14. wireless transport module I, 21. audio frequency and video monitoring modulars, 22. audio-frequence player devices, 23. wireless transport module II, 24. power modules, 30. pit shafts, 31. derricks, 32. cages.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Mining pit shaft supervisory control system as illustrated in fig. 1 and 2, comprise control section and monitoring part, control section comprises video display module 11, Audio Input Modules 12, computer 13 and wireless transport module I 14, video display module 11 is connected with computer 13 respectively by circuit with Audio Input Modules 12, wireless transport module I 14 is located at below derrick 31, and computer 13 is connected with wireless transport module I 14; Monitoring part comprises audio frequency and video monitoring modular 21, two audio frequency and video monitoring modulars 21 be arranged on respectively on cage about 32 2-ply upper board that two are arranged on cage 32 top, and two are located at the bilevel audio-frequence player device 22 of cage 32 respectively, wireless transport module II 23 is installed at cage 32 top, each audio frequency and video monitoring modular 21 and audio-frequence player device 22 are powered by power module 24, and are connected with wireless transport module II 23 respectively.
Preferably, in order to ensure monitoring effect and use safety, audio frequency and video monitoring modular 21 is Mine-used I. S infrared acoustic frequency video camera.
Preferably, wireless transport module I 14 and wireless transport module II 23 are double antenna wireless switch, and take bridge mode to mate connection.
Preferably, power module 24 is mine explosion-suppression and intrinsic safety type D.C. regulated power supply, ensure that the fail safe of ore deposit underground work.
During use, image in the comprehensive Real-time Collection pit shaft 30 of two audio frequency and video monitoring modulars 21 at cage 32 top and sound, on audio frequency and video monitoring modular 21 Real-time Collection cage 32 on cage about 32 2-ply upper board, the image of lower interior part and sound, the image that audio frequency and video monitoring modular 21 collects reaches wireless transport module I 14 through wireless transport module II 23, image and sound are transferred to computer 13 by wireless transport module I 14, sound plays back by computer 13, the video display module 11 be simultaneously attached thereto shows image, realize equipment in pit shaft 30, the real-time monitoring of personnel and pit shaft 30 borehole wall.Audio Input Modules 12 enter instruction can be passed through when there is urgent or accident, instruction is reached wireless transport module II 23 by wireless transport module I 14 by computer 13, information is reached the bilevel audio-frequence player device 22 of cage 32 by wireless transport module II 23, plays back through audio-frequence player device 22.Shaft wall fracture situation can be found early, effectively avoid the generation of shaft rupture, the other keeper of workman in cage 32 and computer 13 can converse Coordination Treatment problem each other, and discovery personnel overload can be propagandaed directed to communicate tank under prompting personnel by Audio Input Modules 12; Find that there is the employee of ill health, can the upper and lower well head inspection personnel of prior notice, require related personnel's gug or arrange special messenger to escort to go home.
Claims (4)
1. a mining pit shaft supervisory control system, it is characterized in that, comprise control section and monitoring part, described control section comprises video display module (11), Audio Input Modules (12), computer (13) and wireless transport module I (14), video display module (11) is connected with computer (13) respectively by circuit with Audio Input Modules (12), and computer (13) is connected with wireless transport module I (14); Described monitoring part comprises audio frequency and video monitoring modular (21), two the audio frequency and video monitoring modulars (21) be arranged on respectively on the upper and lower 2-ply upper board of cage (32) that two are arranged on cage (32) top, and two be located at respectively cage (32) two-layer up and down in audio-frequence player device (22), wireless transport module II (23) is installed at cage (32) top, each audio frequency and video monitoring modular (21) and audio-frequence player device (22) are powered by power module (24), and are connected with wireless transport module II (23) respectively.
2. mining pit shaft supervisory control system according to claim 1, is characterized in that, described audio frequency and video monitoring modular (21) is Mine-used I. S infrared acoustic frequency video camera.
3. mining pit shaft supervisory control system according to claim 1, is characterized in that, described wireless transport module I (14) and wireless transport module II (23) are double antenna wireless switch, and takes bridge mode to mate connection.
4. mining pit shaft supervisory control system according to claim 1, is characterized in that, described power module (24) is mine explosion-suppression and intrinsic safety type D.C. regulated power supply.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520980767.5U CN205195872U (en) | 2015-12-01 | 2015-12-01 | Mining pit shaft monitored control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520980767.5U CN205195872U (en) | 2015-12-01 | 2015-12-01 | Mining pit shaft monitored control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205195872U true CN205195872U (en) | 2016-04-27 |
Family
ID=55788807
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520980767.5U Expired - Fee Related CN205195872U (en) | 2015-12-01 | 2015-12-01 | Mining pit shaft monitored control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205195872U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106014402A (en) * | 2016-07-25 | 2016-10-12 | 西南石油大学 | Packing medium measuring instrument for well wall deformation detection |
CN112950919A (en) * | 2021-03-10 | 2021-06-11 | 洛阳源创电气有限公司 | Mine promotes unmanned on duty's cage wireless signal device |
-
2015
- 2015-12-01 CN CN201520980767.5U patent/CN205195872U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106014402A (en) * | 2016-07-25 | 2016-10-12 | 西南石油大学 | Packing medium measuring instrument for well wall deformation detection |
CN106014402B (en) * | 2016-07-25 | 2019-12-17 | 西南石油大学 | Filling medium measuring instrument for borehole wall deformation detection |
CN112950919A (en) * | 2021-03-10 | 2021-06-11 | 洛阳源创电气有限公司 | Mine promotes unmanned on duty's cage wireless signal device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202694116U (en) | Intelligent digital unmanned working face complete equipment for fully mechanized mining | |
CN103916638A (en) | Coal mine safety comprehensive monitoring platform | |
CN103848184B (en) | A kind of belt transportation system wireless alarming communication control unit | |
CN205195872U (en) | Mining pit shaft monitored control system | |
CN107165427A (en) | A kind of intelligent overhanging unloading platform | |
CN110500134A (en) | A kind of erosion control region limit person's management system | |
CN106325244A (en) | Mine ore drawing process comprehensive monitoring system | |
CN206437554U (en) | A kind of tape machine underground of coal mine intelligence control system | |
CN202866897U (en) | Monitoring and controlling system of mine | |
CN110191318A (en) | A kind of mine hoisting equipment wireless telecommunications video surveillance security early warning system | |
CN102182515B (en) | Method for magnetically monitoring and forecasting deep surrounding rock burst losslessly in real time | |
CN201372811Y (en) | Staff autonomous call for help and gas concentration dynamic monitoring system under coal mine | |
CN204883348U (en) | Cement produced with dry method production line safety monitoring system | |
CN202707132U (en) | PLC-controlled long distance inclined gallery transportation safety device | |
CN103939131A (en) | Coal mine communication detection rescuing system | |
CN105759755A (en) | Mine safety monitoring system | |
CN202815534U (en) | SDH-based coal mine IOT (Internet of Things) integrated automation information system | |
CN204496268U (en) | A kind of digital integration remote training fault diagnosis system of production system | |
CN208200228U (en) | Underground coal mine drawing hoist with function of wireless remote control | |
CN104269035B (en) | A kind of circuit working face based on radio communication monitoring method | |
CN108466885A (en) | A kind of elevator long distance control analysis and management system | |
CN202766121U (en) | Remote control urgent halt device of dry quenching hoist | |
CN206162155U (en) | Remote monitoring system of coal cutter | |
CN104699052B (en) | A kind of remote training of production system, fault diagnosis system and its implementation | |
CN205160689U (en) | Underground mine long -range supervision platform of going into well of taking personal charge of shift |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160427 Termination date: 20171201 |