CN205159924U - 树障修剪辅助导线遮蔽罩 - Google Patents
树障修剪辅助导线遮蔽罩 Download PDFInfo
- Publication number
- CN205159924U CN205159924U CN201521004414.8U CN201521004414U CN205159924U CN 205159924 U CN205159924 U CN 205159924U CN 201521004414 U CN201521004414 U CN 201521004414U CN 205159924 U CN205159924 U CN 205159924U
- Authority
- CN
- China
- Prior art keywords
- cover body
- pole
- wire
- trees
- fixed pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004020 conductor Substances 0.000 title abstract description 5
- 244000141353 Prunus domestica Species 0.000 claims description 13
- 230000001105 regulatory effect Effects 0.000 claims description 9
- 239000000203 mixture Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 2
- 238000013138 pruning Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Catching Or Destruction (AREA)
Abstract
本申请涉及一种电力线路用高空树障修剪辅助导线遮蔽罩,包括罩体,所述罩体分为依次活络相连的上、中、下罩体,所述上、中、下罩体组成一圆弧形罩体,在中罩体中心处旋接有定杆,在定杆外端旋接有锁定螺帽,在定杆内端设置有导线挂体,在所述导线挂体上、下两侧活络相连有上、下调节杆,所述上、下调节杆外端分别由上、下罩体处的螺孔旋出,外端旋接有调节螺帽。由于实施上述技术方案,本申请通过在梯头横梁处装设电机,电机带动拉线拉动闭锁杆开启,打开进线口,导线即可与挂钩脱离,无需作业人员在高空对闭锁杆进行启闭操作,降低了高空作业的风险。本申请结构简单,结构可靠,对原设备更改较少,且应用广泛可在单导线和垂直双分裂导线上使用。
Description
技术领域
本申请涉及一种电力线路用高空树障修剪辅助导线遮蔽罩。
背景技术
在架设线路进行树枝修剪时,因树枝有时会将导线遮蔽而导致修剪时较为不便,现今通常是一人手持绝缘杆将树枝拨到一边,另一人进行修剪,但当树枝较为茂盛时,单人无法将树枝完全拨离,导致修剪人员需极为小心进行修剪,这时只有多人配合才能提高修剪效率。
发明内容
本申请的目的在于提出一种提高修剪效率的电力线路用高空树障修剪辅助导线遮蔽罩。
本申请的目的是这样实现的:电力线路用高空树障修剪辅助导线遮蔽罩,包括罩体,所述罩体分为依次活络相连的上、中、下罩体,所述上、中、下罩体组成一圆弧形罩体,在中罩体中心处旋接有定杆,在定杆外端旋接有锁定螺帽,在定杆内端设置有导线挂体,在所述导线挂体上、下两侧活络相连有上、下调节杆,所述上、下调节杆外端分别由上、下罩体处的螺孔旋出,外端旋接有调节螺帽。
由于实施上述技术方案,本申请通过在梯头横梁处装设电机,电机带动拉线拉动闭锁杆开启,打开进线口,导线即可与挂钩脱离,无需作业人员在高空对闭锁杆进行启闭操作,降低了高空作业的风险。本申请结构简单,结构可靠,对原设备更改较少,且应用广泛可在单导线和垂直双分裂导线上使用。
附图说明:本申请的具体结构由以下的附图和实施例给出:
图1是电力线路用高空树障修剪辅助导线遮蔽罩结构示意图。
图例:1、上罩体,2、上调节杆,3、中罩体,4、定杆,5、下调节杆,6、下罩体,7、手持杆,8、导线挂体。
具体实施方式:
本申请不受下述实施例的限制,可根据本申请的技术方案与实际情况来确定具体的实施方式。
实施例:如图1所示,电力线路用高空树障修剪辅助导线遮蔽罩包括罩体,所述罩体分为依次活络相连的上、中、下罩体1、3、6,所述上、中、下罩体1、3、6组成一圆弧形罩体,在中罩体3中心处旋接有定杆4,在定杆4外端旋接有锁定螺帽,在定杆4内端设置有导线挂体8,在所述导线挂体8上、下两侧活络相连有上、下调节杆2、5,所述上、下调节杆2、5外端分别由上、下罩体1、6处的螺孔旋出,外端旋接有调节螺帽。
所述定杆4设置在中罩体3至罩体圆心的连线上,且定杆4与导线挂体8的长度之和不大于罩体半径。
所述上、下调节杆2、5均由两段活络相连的杆体组成。
所述定杆4内端与导线挂体8活络相连。
在罩体下部连接有手持杆7。
使用时,通过调节螺帽的松紧调节上、下罩体2、6的张合,同时通过调节上、下调节杆2、5的弯曲程度,以及通过调节定杆4的伸缩调节导线挂体8在罩体内的所处水平位置,可改变导线挂体8的角度。随后即可将导线挂体8与导线挂接,罩体将树枝等杂物挡于导线外,即可快速对树枝进行修剪。
在使用时,当其余调节螺帽和定位螺帽固定后,可松动下调节杆5上的调节螺帽,通过摆动手持杆7,当手持杆7向外摆动时,带动下罩体6转动向外张开,将遮蔽范围扩大。
以上技术特征构成了本申请的最佳实施例,其具有较强的适应性和最佳实施效果,可根据实际需要增减非必要技术特征,来满足不同情况的需要。
Claims (5)
1.一种电力线路用高空树障修剪辅助导线遮蔽罩,包括罩体,其特征在于:所述罩体分为依次活络相连的上、中、下罩体,所述上、中、下罩体组成一圆弧形罩体,在中罩体中心处旋接有定杆,在定杆外端旋接有锁定螺帽,在定杆内端设置有导线挂体,在所述导线挂体上、下两侧活络相连有上、下调节杆,所述上、下调节杆外端分别由上、下罩体处的螺孔旋出,外端旋接有调节螺帽。
2.如权利要求1所述的电力线路用高空树障修剪辅助导线遮蔽罩,其特征在于:所述定杆设置在中罩体至罩体圆心的连线上,且定杆与导线挂体的长度之和不大于罩体半径。
3.如权利要求1所述的电力线路用高空树障修剪辅助导线遮蔽罩,其特征在于:所述上、下调节杆均由两段活络相连的杆体组成。
4.如权利要求1所述的电力线路用高空树障修剪辅助导线遮蔽罩,其特征在于:所述定杆内端与导线挂体活络相连。
5.如权利要求1所述的电力线路用高空树障修剪辅助导线遮蔽罩,其特征在于:在罩体下部连接有手持杆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521004414.8U CN205159924U (zh) | 2015-12-08 | 2015-12-08 | 树障修剪辅助导线遮蔽罩 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521004414.8U CN205159924U (zh) | 2015-12-08 | 2015-12-08 | 树障修剪辅助导线遮蔽罩 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205159924U true CN205159924U (zh) | 2016-04-13 |
Family
ID=55695576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521004414.8U Active CN205159924U (zh) | 2015-12-08 | 2015-12-08 | 树障修剪辅助导线遮蔽罩 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205159924U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105356372A (zh) * | 2015-12-08 | 2016-02-24 | 国网新疆电力公司吐鲁番供电公司 | 树障修剪辅助导线遮蔽罩 |
CN112952652A (zh) * | 2021-04-02 | 2021-06-11 | 国家电网有限公司 | 一种供电线路清障装置 |
-
2015
- 2015-12-08 CN CN201521004414.8U patent/CN205159924U/zh active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105356372A (zh) * | 2015-12-08 | 2016-02-24 | 国网新疆电力公司吐鲁番供电公司 | 树障修剪辅助导线遮蔽罩 |
CN112952652A (zh) * | 2021-04-02 | 2021-06-11 | 国家电网有限公司 | 一种供电线路清障装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205159924U (zh) | 树障修剪辅助导线遮蔽罩 | |
CN206309110U (zh) | 电杆正杆器 | |
CN204691371U (zh) | 一种110kV电缆双回线路终端塔 | |
CN205489270U (zh) | 微调式地线提升装置 | |
CN105375391B (zh) | 自动升降式绝缘临时横担 | |
CN110265915A (zh) | 一种绑树装置 | |
CN205489271U (zh) | 输电线路架空地线提升器 | |
CN107100414B (zh) | 一种电杆拉线用防植物攀爬装置 | |
CN206118641U (zh) | 一种便携式导向辅助绳捆绑工具 | |
CN205124571U (zh) | 一种用于砍树的定向辅助保护工具 | |
CN105356372A (zh) | 树障修剪辅助导线遮蔽罩 | |
CN205141610U (zh) | 一种收放式避雷带 | |
CN210184324U (zh) | 驱鸟装置 | |
CN204156488U (zh) | 避雷器安装总成 | |
CN205489269U (zh) | 高压输电线路用架空地线提升装置 | |
CN103972836A (zh) | 一种输电线路钻越方法 | |
CN212064991U (zh) | 一种用于电力线路拉线的防藤蔓装置 | |
CN210184323U (zh) | 驱鸟装置 | |
CN208401261U (zh) | 一种可调节角度的避雷针 | |
CN208142530U (zh) | 一种伸缩式避雷装置 | |
CN203589426U (zh) | 用于安装接地线挂钩的升降装置 | |
CN212011602U (zh) | 一种建筑设备防雷击保护网 | |
CN206934639U (zh) | 一种大荷载电杆爬梯 | |
CN205713389U (zh) | 一种可避雷的电杆 | |
CN215343350U (zh) | 一种防雷装置及机井控制柜 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |