CN205138552U - 一种特高压工程组塔抱杆拉线受力测控与报警系统 - Google Patents
一种特高压工程组塔抱杆拉线受力测控与报警系统 Download PDFInfo
- Publication number
- CN205138552U CN205138552U CN201520959861.2U CN201520959861U CN205138552U CN 205138552 U CN205138552 U CN 205138552U CN 201520959861 U CN201520959861 U CN 201520959861U CN 205138552 U CN205138552 U CN 205138552U
- Authority
- CN
- China
- Prior art keywords
- wireless
- extra
- high voltage
- pole
- temperature sensor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005540 biological transmission Effects 0.000 abstract description 4
- 238000010276 construction Methods 0.000 description 11
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520959861.2U CN205138552U (zh) | 2015-11-27 | 2015-11-27 | 一种特高压工程组塔抱杆拉线受力测控与报警系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520959861.2U CN205138552U (zh) | 2015-11-27 | 2015-11-27 | 一种特高压工程组塔抱杆拉线受力测控与报警系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205138552U true CN205138552U (zh) | 2016-04-06 |
Family
ID=55624338
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520959861.2U Expired - Fee Related CN205138552U (zh) | 2015-11-27 | 2015-11-27 | 一种特高压工程组塔抱杆拉线受力测控与报警系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205138552U (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106504113A (zh) * | 2016-09-28 | 2017-03-15 | 中国电力科学研究院 | 一种组塔施工装备的远程集中监测系统和方法 |
CN107155091A (zh) * | 2017-06-05 | 2017-09-12 | 国家电网公司 | 一种抱杆组立无线视频监控系统及方法 |
CN107188056A (zh) * | 2017-06-05 | 2017-09-22 | 国家电网公司 | 一种安全自控装置 |
CN107328711A (zh) * | 2017-07-19 | 2017-11-07 | 鹤山倍狮科技有限公司 | 端子连接线拉力测试机 |
CN109357803A (zh) * | 2018-11-12 | 2019-02-19 | 封海波 | 一种用于电力抱杆施工的无线应力检测装置 |
CN109377079A (zh) * | 2018-11-12 | 2019-02-22 | 封海波 | 一种用于电力抱杆施工的安全监控系统 |
CN109799022A (zh) * | 2019-03-13 | 2019-05-24 | 福州大学 | 一种铁塔施工抱杆地锚拉线的拉力检测系统及方法 |
-
2015
- 2015-11-27 CN CN201520959861.2U patent/CN205138552U/zh not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106504113A (zh) * | 2016-09-28 | 2017-03-15 | 中国电力科学研究院 | 一种组塔施工装备的远程集中监测系统和方法 |
CN107155091A (zh) * | 2017-06-05 | 2017-09-12 | 国家电网公司 | 一种抱杆组立无线视频监控系统及方法 |
CN107188056A (zh) * | 2017-06-05 | 2017-09-22 | 国家电网公司 | 一种安全自控装置 |
CN107188056B (zh) * | 2017-06-05 | 2018-11-09 | 国家电网公司 | 一种安全自控装置 |
CN107328711A (zh) * | 2017-07-19 | 2017-11-07 | 鹤山倍狮科技有限公司 | 端子连接线拉力测试机 |
CN109357803A (zh) * | 2018-11-12 | 2019-02-19 | 封海波 | 一种用于电力抱杆施工的无线应力检测装置 |
CN109377079A (zh) * | 2018-11-12 | 2019-02-22 | 封海波 | 一种用于电力抱杆施工的安全监控系统 |
CN109377079B (zh) * | 2018-11-12 | 2022-04-15 | 封海波 | 一种用于电力抱杆施工的安全监控系统 |
CN109799022A (zh) * | 2019-03-13 | 2019-05-24 | 福州大学 | 一种铁塔施工抱杆地锚拉线的拉力检测系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205138552U (zh) | 一种特高压工程组塔抱杆拉线受力测控与报警系统 | |
CN202330626U (zh) | 带电作业工具耐压试验平台 | |
CN103389408A (zh) | 一种高压单芯电缆护层接地电流在线监测装置及控制方法 | |
CN106249039A (zh) | 一种用于配电网的过电压在线监测装置 | |
CN203284128U (zh) | 闸刀主体机构吊装工具 | |
CN203455440U (zh) | 一种高压单芯电缆护层接地在线监测装置 | |
CN202471271U (zh) | 高压开关柜在线测温系统 | |
CN204832854U (zh) | 一种基于ZigBee通信的楼宇母线槽温湿度监控系统 | |
CN204205712U (zh) | 一种变电站直流电源近、远程无线监控系统 | |
CN204028119U (zh) | 可调节高度的高压试验引线绝缘支撑架 | |
CN203849431U (zh) | 架空电缆监测报装置 | |
CN103332608A (zh) | Gw6刀闸瓷柱更换专用杆吊 | |
CN205681185U (zh) | 一种监测电力调度自动化设备的监测装置 | |
CN204333859U (zh) | 一种高压输电杆塔线缆防坠器 | |
CN209327859U (zh) | 用于轴力伺服系统的低压现场总控系统 | |
CN203479948U (zh) | 变电站临时地线挂接状态传感器 | |
CN206135433U (zh) | 一种基于交流架空输电线路绝缘地线的取电装置 | |
CN204706830U (zh) | 高压带电断、接引线装置 | |
CN104360216A (zh) | 接地检测装置及接地检测方法 | |
CN205300583U (zh) | 电气距离在线监测系统 | |
CN104330706A (zh) | 一种雷击检测装置 | |
CN204823817U (zh) | 一种变频防爆起重机 | |
CN203582344U (zh) | 一种起吊装置 | |
CN104678200A (zh) | 一种区域电能质量监测装置 | |
CN201322781Y (zh) | 变电站检修设备接地状态实时监控系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A force measurement and control and alarm system for holding pole stay wire of UHV Engineering Group Tower Effective date of registration: 20210818 Granted publication date: 20160406 Pledgee: Prudential Bank Ji'nan branch of Limited by Share Ltd. Pledgor: SHANDONG DE LUTAI INFORMATION TECHNOLOGY Co.,Ltd. Registration number: Y2021370000099 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220906 Granted publication date: 20160406 Pledgee: Prudential Bank Ji'nan branch of Limited by Share Ltd. Pledgor: SHANDONG DE LUTAI INFORMATION TECHNOLOGY Co.,Ltd. Registration number: Y2021370000099 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160406 |