CN205135680U - A dual anchor head that builds in of crossing multiple spot for rock mass tunnel is strutted - Google Patents

A dual anchor head that builds in of crossing multiple spot for rock mass tunnel is strutted Download PDF

Info

Publication number
CN205135680U
CN205135680U CN201520850685.9U CN201520850685U CN205135680U CN 205135680 U CN205135680 U CN 205135680U CN 201520850685 U CN201520850685 U CN 201520850685U CN 205135680 U CN205135680 U CN 205135680U
Authority
CN
China
Prior art keywords
rod
bridging
multiple spot
steel
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520850685.9U
Other languages
Chinese (zh)
Inventor
胡力绳
王建秀
邹宝平
蒋浩然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Second Bureau Construction Co ltd
China Railway No 2 Engineering Group Co Ltd
Shenzhen China Railway Second Bureau Engineering Co Ltd
Original Assignee
China Railway No 2 Engineering Group Co Ltd
Shenzhen China Railway Second Bureau Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 2 Engineering Group Co Ltd, Shenzhen China Railway Second Bureau Engineering Co Ltd filed Critical China Railway No 2 Engineering Group Co Ltd
Priority to CN201520850685.9U priority Critical patent/CN205135680U/en
Application granted granted Critical
Publication of CN205135680U publication Critical patent/CN205135680U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a dual anchor head that builds in of crossing multiple spot for rock mass tunnel is strutted, including stretching into the body of rod to the tunnel anchor eye in, the front end of the body of rod is provided with cone, its characterized in that: be provided with the steel axle on the body of rod, radial extension along the body of rod, the steel axle is outwardly directed by body of rod both sides, and each the articulated a set of main scissors of steel axle that is located body of rod both sides props, and each is organized main scissors and props and all include two coaxial articulated parallelogram steel sheets, still be provided with on the body of rod and be arranged in promoting respectively to organize main scissors and prop two parallelogram steel sheets and prop drive arrangement around steel axle pivoted owner scissors, when strutting the beginning, drive the parallelogram steel sheet that main scissors propped through drive arrangement and open in the embedding pore wall, form crossing multiple spot anchor mode, such multiple spot anchor just, it possesses easy and simple to handlely, and the atress is even, waits beneficial effect more greatly to the scope of strutting of rock mass.

Description

The dual build-in anchor head of a kind of staggered form multiple spot for Rock Tunnel supporting
Technical field
The utility model belongs to geotechnical engineering support technology field, especially relates to the dual build-in anchor head of a kind of staggered form multiple spot for Rock Tunnel supporting.
Background technology
Anchor pole is the member system structure that Rock And Soil is reinforced, also be a kind of important form of the surrounding rock supportings such as tunnels and underground engineering, the concentrated anchoring fixing rock mass with the fastener of the anchor device of rock bolt head and afterbody is a kind of common anchoring support mode, overcome the shortcoming of rock mass resistance to tension well below anti-pressure ability, but, existing anchor pole has the following disadvantages: the usual anchor point of anchor head is single, anchoring property is not strong, easy generation anchoring interfacial failure destroys, and cannot realize the multi-faceted dual fail-safe anchoring of multiple spot.Therefore, how to guarantee the high strength anchoring of anchor head, the pulling test strength improving anchor pole is the technical problem that this area needs solution for a long time badly.
Utility model content
Goal of the invention of the present utility model is: for prior art Problems existing, a kind of anchor head multi-point-anchoring is provided, uniform force, large to rock mass support scope, and avoid producing to anchor bar body the dual build-in anchor head of the staggered form multiple spot for Rock Tunnel supporting that stress concentrates.
To achieve these goals, the technical solution adopted in the utility model is:
The dual build-in anchor head of a kind of staggered form multiple spot for Rock Tunnel supporting, comprise the body of rod that can stretch in tunnel anchor hole, the front end of the described body of rod is provided with cone, the described body of rod is provided with steel axle, the described radial direction along the body of rod extends, described steel axle is protruding by body of rod both sides, be positioned at each hinged one group of main bridging of steel axle of body of rod both sides, each group of main bridging includes two coaxial hinged parallelogram steel discs, the described body of rod is also provided with for promoting the main bridging drive unit that in each group of main bridging, two parallelogram steel discs rotate around steel axle.
Preferably, the top margin of described parallelogram steel disc and base can turn to the hole wall of tunnel anchor hole bonded to each other.Adopt such structure, under anchoring status, parallelogram steel disc fully contacts with hole wall, and anchoring effect is better.
Preferably, the top margin of described parallelogram steel disc and base are provided with sawtooth.Adopt such structure, winner's bridging can be made to contact tightr with tunnel anchor hole under anchoring status.
Preferably, the described body of rod is arranged with movable steel loop, described movable steel loop can slide axially along the body of rod, the both sides of described movable steel loop are respectively provided with the rivet of an outwardly convex, each rivet is all hinged with one group of secondary bridging, each group of secondary bridging includes two coaxial hinged parallelogram steel discs, the described body of rod is also provided with for promoting the secondary bridging drive unit that in each group of secondary bridging, two parallelogram steel discs rotate around steel axle.Adopt such structure, form because secondary bridging has certain thickness parallelogram steel disc by two groups, four, be distributed in movable steel loop both sides between two and linked by rivet, build-in has the intensive sawtooth of same thickness in the termination of hole wall with steel disc, initially open minimum angles and be greater than 30 °, only have when secondary bridging drive unit rotates, when single, double head round platform nut all contacts with steel disc, secondary bridging steel disc just can open.
Preferably, described secondary bridging drive unit comprises single head round platform nut.
Preferably, described main bridging drive unit is double end round platform nut, and described double end round platform nut is arranged between main bridging and secondary bridging.
Double end round platform nut is the assembly of two round platforms and a cylinder, head end is used for initiatively promoting opening and fixing of main bridging, end is for coordinating single head round platform nut, passively push opening and fixing of secondary bridging open, when rock mass support anchoring, the body of rod with build-in anchor head is put into pre-drilled hole, by double end round platform nut rotation, main bridging is driven to open until build-in is in hole wall, secondary bridging is placed on the body of rod, single head round platform nut rotation, final and double end round platform nut one works, by secondary bridging build-in in hole wall.
Preferably, the afterbody of described cone is provided with inverted cone shape and spirals tooth, and described inverted cone shape spirals between tooth and the body of rod and is provided with Anchor Agent.Adopt such structure, because the cone afterbody of lever front end to spiral tooth with inverted cone shape, in bullet-nose conical column structure, the action effect of anchoring end and Anchor Agent can be improved.
In sum, owing to have employed technique scheme, the beneficial effects of the utility model are: when supporting starts, the parallelogram steel disc of main bridging is driven to open until embed in hole wall by drive unit, form the multi-point-anchoring mode of staggered form, multi-point-anchoring so just, it possesses easy and simple to handle, uniform force, waits beneficial effect to the supporting scope of rock mass is larger.
Accompanying drawing explanation
Fig. 1 is that the main bridging of staggered form multiple spot of the present utility model dual build-in anchor head closes elevation;
Fig. 2 is that the secondary bridging of the dual build-in anchor head of staggered form multiple spot of the present utility model closes elevation;
Fig. 3 is that staggered form multiple spot of the present utility model dual build-in anchor head bridging opens elevation completely;
Fig. 4 is that staggered form multiple spot of the present utility model dual build-in anchor head bridging opens top view completely;
Fig. 5 is that staggered form multiple spot of the present utility model dual build-in anchor head bridging opens 1-1 sectional drawing completely;
Fig. 6 is that staggered form multiple spot of the present utility model dual build-in anchor head bridging opens 2-2 sectional drawing completely;
Fig. 7 is the elevation of main bridging;
Fig. 8 is the elevation of secondary bridging.
Mark in figure: cone-1, main bridging-2, steel axle-3, sawtooth-4, double end round platform nut-5, rivet-7, movable steel loop-8, secondary bridging-9, single head round platform nut-10.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail.
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figures 1 to 8, the present embodiment is used for the dual build-in anchor head of staggered form multiple spot of Rock Tunnel supporting, comprise the body of rod that can stretch in tunnel anchor hole, the front end of the body of rod is provided with cone 1, the body of rod is provided with steel axle 3, radial direction along the body of rod extends, steel axle 3 is protruding by body of rod both sides, be positioned at each hinged one group of main bridging 2 of steel axle 3 of body of rod both sides, each group of main bridging 2 includes two coaxial hinged parallelogram steel discs, the body of rod is also provided with for promoting main bridging 2 drive unit that in each group of main bridging 2, two parallelogram steel discs rotate around steel axle 3, the top margin of parallelogram steel disc and base can turn to the hole wall of tunnel anchor hole bonded to each other, under anchoring status, parallelogram steel disc fully contacts with hole wall, anchoring effect is better, the top margin of parallelogram steel disc and base are provided with sawtooth 4, winner's bridging 2 can be made to contact tightr with tunnel anchor hole under anchoring status, the afterbody of cone 1 is provided with inverted cone shape and spirals tooth, inverted cone shape spirals between tooth and the body of rod and is provided with Anchor Agent, because cone 1 afterbody of lever front end to spiral tooth with inverted cone shape, in bullet-nose conical column structure, the action effect of anchoring end and Anchor Agent can be improved.
In the present embodiment, the body of rod is arranged with movable steel loop 8, movable steel loop 8 can slide axially along the body of rod, the both sides of movable steel loop 8 are respectively provided with the rivet 7 of an outwardly convex, each rivet 7 is all hinged with one group of secondary bridging 9, each group of secondary bridging 9 includes two coaxial hinged parallelogram steel discs, the body of rod is also provided with for promoting secondary bridging 9 drive unit that in each group of secondary bridging 9, two parallelogram steel discs rotate around steel axle 3.Adopt such structure, form because secondary bridging 9 has certain thickness parallelogram steel disc by two groups, four, be distributed in movable steel loop 8 both sides between two and linked by rivet 7, build-in has the intensive sawtooth 4 of same thickness in the termination of hole wall with steel disc, initially open minimum angles and be greater than 30 °, only have when secondary bridging 9 drive unit rotates, when single, double head round platform nut 5 all contacts with steel disc, secondary bridging 9 steel disc just can open.
Concrete, secondary bridging 9 drive unit comprises single head round platform nut 10, main bridging 2 drive unit is double end round platform nut 5, double end round platform nut 5 is arranged between main bridging 2 and secondary bridging 9, wherein, double end round platform nut 5 is the assembly of two round platforms and a cylinder, head end is used for initiatively promoting opening and fixing of main bridging 2, end is for coordinating single head round platform nut 10, passively push opening and fixing of secondary bridging 9 open, when rock mass support anchoring, the body of rod with build-in anchor head is put into pre-drilled hole, rotated by double end round platform nut 5, main bridging 2 is driven to open until build-in is in hole wall, secondary bridging 9 is placed on the body of rod, single head round platform nut 10 rotates, final and double end round platform nut 5 one works, by secondary bridging 9 build-in in hole wall.
Adopt such structure, when supporting starts, the parallelogram steel disc of main bridging 2 is driven to open until embed in hole wall by drive unit, form the multi-point-anchoring mode of staggered form, multi-point-anchoring so just, it possesses easy and simple to handle, uniform force, waits beneficial effect to the supporting scope of rock mass is larger.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection domain of the present utility model.

Claims (7)

1. the dual build-in anchor head of the staggered form multiple spot for Rock Tunnel supporting, comprise the body of rod that can stretch in tunnel anchor hole, the front end of the described body of rod is provided with cone, it is characterized in that: the described body of rod is provided with steel axle, radial direction along the described body of rod extends, described steel axle is protruding by body of rod both sides, be positioned at each hinged one group of main bridging of steel axle of body of rod both sides, each group of main bridging includes two coaxial hinged parallelogram steel discs, the described body of rod is also provided with for promoting the main bridging drive unit that in each group of main bridging, two parallelogram steel discs rotate around steel axle.
2. the dual build-in anchor head of the staggered form multiple spot for Rock Tunnel supporting according to claim 1, is characterized in that: top margin and the base of described parallelogram steel disc can turn to the hole wall of tunnel anchor hole bonded to each other.
3. the dual build-in anchor head of the staggered form multiple spot for Rock Tunnel supporting according to claim 1, is characterized in that: top margin and the base of described parallelogram steel disc are provided with sawtooth.
4. according to the described dual build-in anchor head of the staggered form multiple spot for Rock Tunnel supporting arbitrary in claims 1 to 3, it is characterized in that: the described body of rod is arranged with movable steel loop, described movable steel loop can slide axially along the body of rod, the both sides of described movable steel loop are respectively provided with the rivet of an outwardly convex, each rivet is all hinged with one group of secondary bridging, each group of secondary bridging includes two coaxial hinged parallelogram steel discs, the described body of rod is also provided with for promoting the secondary bridging drive unit that in each group of secondary bridging, two parallelogram steel discs rotate around steel axle.
5. the dual build-in anchor head of the staggered form multiple spot for Rock Tunnel supporting according to claim 4, is characterized in that: described secondary bridging drive unit comprises single head round platform nut.
6. the dual build-in anchor head of the staggered form multiple spot for Rock Tunnel supporting according to claim 5, it is characterized in that: described main bridging drive unit is double end round platform nut, described double end round platform nut is arranged between main bridging and secondary bridging.
7. the dual build-in anchor head of the staggered form multiple spot for Rock Tunnel supporting according to claim 6, is characterized in that: the afterbody of described cone is provided with inverted cone shape and spirals tooth, and described inverted cone shape spirals between tooth and the body of rod and is provided with Anchor Agent.
CN201520850685.9U 2015-10-29 2015-10-29 A dual anchor head that builds in of crossing multiple spot for rock mass tunnel is strutted Expired - Fee Related CN205135680U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520850685.9U CN205135680U (en) 2015-10-29 2015-10-29 A dual anchor head that builds in of crossing multiple spot for rock mass tunnel is strutted

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520850685.9U CN205135680U (en) 2015-10-29 2015-10-29 A dual anchor head that builds in of crossing multiple spot for rock mass tunnel is strutted

Publications (1)

Publication Number Publication Date
CN205135680U true CN205135680U (en) 2016-04-06

Family

ID=55621485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520850685.9U Expired - Fee Related CN205135680U (en) 2015-10-29 2015-10-29 A dual anchor head that builds in of crossing multiple spot for rock mass tunnel is strutted

Country Status (1)

Country Link
CN (1) CN205135680U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107356450A (en) * 2017-07-12 2017-11-17 浙江科技学院 The intelligent apparatus of Multi-working-surface fly-cutting field protolith structural plane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107356450A (en) * 2017-07-12 2017-11-17 浙江科技学院 The intelligent apparatus of Multi-working-surface fly-cutting field protolith structural plane

Similar Documents

Publication Publication Date Title
US11268383B2 (en) Type of energy-absorbing rock bolt device with umbrella-shaped structure
CN207331688U (en) A kind of resistance to plucking expansion anchor rod
CN205714237U (en) A kind of anchor pole combination allows pressure device
CN104165799B (en) A kind of anchoring counterforce device for grinding coagulation soil in-situ anti-shear test
CN104956031B (en) Rock-bolt
WO2018205702A1 (en) Variable-diameter reinforcing cage for anchor rod or pile foundation
CN102286975A (en) Constant-resistance energy-absorbing anchor rod for strengthening large-deformation rock body
CN205329688U (en) Resistance -increasing slip casting stock
CN205135680U (en) A dual anchor head that builds in of crossing multiple spot for rock mass tunnel is strutted
CN203188207U (en) Anchor rod with end portions capable of being expanded
CN103741687A (en) Reaming pressure dispersion type anchor rod
CN110925001B (en) Buffer protection device for preventing anchor cable from being ejected due to failure
CN206521873U (en) A kind of reducing steel reinforcement cage and its enlarging anchor rod or pile foundation
CN105781598B (en) A kind of Extendable anchor rod
CN107142934A (en) A kind of expanding enlarged footing anchor bolt support
CN105040693A (en) End expanding type anti-floating anchor rod
CN203879522U (en) Expansion shell type anchor rod
CN204113316U (en) A kind of interval screw rod body formula large deformation anchor rod
CN205296150U (en) Novel barb stock
CN202325581U (en) Prestress anchor bolt support system suitable for dynamic loads
CN203808065U (en) Omega-shaped structure for lapping round anti-skid pile and anchor cables
CN204703158U (en) End expanding type anti-float anchor rod
CN105002904B (en) The construction method of installation of end expanding type anti-float anchor rod
CN203741837U (en) Ground anchor
CN207862941U (en) A kind of variable diameters steel reinforcement cage and anchor pole or pile foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Co-patentee after: SHENZHEN ZHONGTIEERJU ENGINEERING Co.,Ltd.

Patentee after: China Railway Second Bureau Construction Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Co-patentee before: SHENZHEN ZHONGTIEERJU ENGINEERING Co.,Ltd.

Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190801

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Co-patentee after: SHENZHEN ZHONGTIEERJU ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Co-patentee before: SHENZHEN ZHONGTIEERJU ENGINEERING Co.,Ltd.

Patentee before: China Railway Second Bureau Construction Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406