CN205134391U CN201520600786.0U CN201520600786U CN205134391U CN 205134391 U CN205134391 U CN 205134391U CN 201520600786 U CN201520600786 U CN 201520600786U CN 205134391 U CN205134391 U CN 205134391U
Authority
CN
China
Prior art keywords
pressure
preformed pile
bearing platform
platform
drawing mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520600786.0U
Other languages
Chinese (zh)
Inventor
周兆弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520600786.0U priority Critical patent/CN205134391U/en
Application granted granted Critical
Publication of CN205134391U publication Critical patent/CN205134391U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the technical field of the building, a tensile detection device of precast pile is related to. The problem of the prior art structure complicated, implement inconvenient technique is solved. Including the tension mechanism who sets up the precast pile top in buryying the soil layer, precast pile top be equipped with a pressure -bearing platform, tension mechanism is located the pressure -bearing bench, last pressures of tension mechanism is equipped with a tensile platform, sets up a plurality of perforation at the pressure -bearing bench, pass behind the axial owner's muscle inside the reinforcing bar fixed connection precast pile of stretching the pressure -bearing bench the perforation and with tensile platform fixed connection. The utility model has the advantages of simple structure, convenient operation, easy to carry out.

Description

The tension checkout gear of preformed pile
Technical field
The utility model belongs to technical field of buildings, relates to a kind of tension checkout gear of preformed pile.
Background technology
In traditional pile tube pullout tests, the common method that stake is connected with test beam inserts in pile tube by the reinforcing bar of some, then waters microdilatancy wadding weft variation, treats that pouring concrete strength reaches designing requirement, can carry out pullout tests; Conventional method is long in time limit, the deficiency of complicated construction technique, test operation difficulty has been that those skilled in the art are known.
Chinese patent literature discloses a kind of pile tube resistance to plucking single pole power transmission experimental rig [application number: 201410208782.8] and comprising: base, upper plate, dowel bar, centre-hole jack and girder; Described girder is arranged on ground by buttress, described base to be positioned at below described girder and for connecting pile tube sample top, described upper plate is positioned at above described girder, described centre-hole jack to be placed on described girder and to withstand bottom described upper plate, described dowel bar lower end connects described base, and described dowel bar upper end is connected with described upper plate through described centre-hole jack.
The force pulling that such scheme overcomes many dowel bars to be provided is difficult to realize consistent problem, thus decreases the main unfavorable factor causing testing force pulling bias, is conducive to the accuracy improving result of the test; And the force pulling avoiding many dowel bars detects, contrasts and adjustment work, thus improve test efficiency.And by follow-up improvement, further increase the installation convenience of pile tube resistance to plucking single pole power transmission experimental rig.But the program is implemented complicated, is not suitable for the quick detection of the preformed pile on building site.
Utility model content
The purpose of this utility model is for the problems referred to above, provides a kind of structure simple, tension checkout gear easy to detect.
For achieving the above object, the utility model have employed following technical proposal: a kind of tension checkout gear of preformed pile, comprise the drawing mechanism above the preformed pile that is arranged on and is embedded in soil layer, a pressure-bearing platform is provided with above described preformed pile, drawing mechanism is positioned on pressure-bearing platform, drawing mechanism is installed with a tension platform, pressure-bearing platform has offered some perforation, passed the perforation on pressure-bearing platform after stretching reinforcing bar is fixedly connected with the main muscle of axis of preformed pile inside and be fixedly connected with tension platform.
In the tension checkout gear of above-mentioned preformed pile, the quantity of the perforation on described pressure-bearing platform is not less than the quantity of axially main muscle on preformed pile, described stretching reinforcing bar and axial main muscle one_to_one corresponding form cage construction after also boring a hole, and it is inner that described drawing mechanism is positioned at the cage construction formed by stretching reinforcing bar.
In the tension checkout gear of above-mentioned preformed pile, described drawing mechanism is oil cylinder or jack.
In the tension checkout gear of above-mentioned preformed pile, the axial line of described drawing mechanism and the axial line of preformed pile are located along the same line.
In the tension checkout gear of above-mentioned preformed pile, there is bottom described pressure-bearing platform some pressure-bearing posts of being fixedly connected with pressure-bearing platform thus make to form operating space below pressure-bearing platform.
Compared with prior art, the utility model has the advantage of: structure is simple, easy to operate, easy to implement.
Accompanying drawing explanation
Fig. 1 is the structural representation that the utility model provides.
In figure: preformed pile 1, pressure-bearing platform 2, drawing mechanism 3, tension platform 4, stretching reinforcing bar 5, axially main muscle 6, layer of concrete 7, breach 8, transverse reinforcement 9, pressure-bearing post 10, operating space 11.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in more detail.
As shown in Figure 1, a kind of tension checkout gear of preformed pile, comprise the drawing mechanism 3 above the preformed pile 1 that is arranged on and is embedded in soil layer, a pressure-bearing platform 2 is provided with above described preformed pile 1, drawing mechanism 3 is positioned on pressure-bearing platform 2, drawing mechanism 3 is installed with a tension platform 4, pressure-bearing platform 2 has offered some perforation, passed the perforation on pressure-bearing platform 2 after stretching reinforcing bar 5 is fixedly connected with the main muscle 6 of axis of preformed pile 1 inside and be fixedly connected with tension platform 4.Drawing mechanism 3 is oil cylinder or jack.Oil cylinder or jack carry pressure meter, can read force value or value of thrust, and this is common practise, repeats no more herein.Stretching reinforcing bar 5 can weld with axial main muscle 6 or be fixedly connected with fixtures such as bolt pairs.Pressure-bearing platform 2 and tension platform 4 can make with concrete structure or cylinder iron, bloom etc.If when tension platform 4 is for mixed clay structure, can be embedded in tension platform 4 with attaching nut, make stretching reinforcing bar 5 and attaching nut be spirally connected fixing or be welded and fixed, if tension platform 4 is ironwork, stretching reinforcing bar 5 directly can be welded with tension platform 4.
The quantity of the perforation on pressure-bearing platform 2 is not less than the quantity of axially main muscle 6 on preformed pile 1, bore a hole according to the axially topological shape setting of main muscle 6 on preformed pile 1, as axially main muscle 6 is arranged ringwise, then bore a hole and be also preferably annular, as axial main muscle 6 is square setting, then boring a hole, it is square to be also preferably set to, by that analogy, described stretching reinforcing bar 5 and axial main muscle 6 one_to_one corresponding form cage construction after also boring a hole, and it is inner that described drawing mechanism 3 is positioned at the cage construction formed by stretching reinforcing bar 5.
The axial line of drawing mechanism 3 and the axial line of preformed pile 1 are located along the same line thus make tension platform 4 uniform force, and preferably, the axial line of drawing mechanism 3, preformed pile 1 and tension platform 4 all on the same line.Have some pressure-bearing posts 10 of being fixedly connected with pressure-bearing platform 2 bottom pressure-bearing platform 2 thus make to form operating space 11 below pressure-bearing platform 2, convenient operation is constructed.
Operating principle of the present utility model is: according to the position of preformed pile 1 in underground, cut out the soil layer at preformed pile 1 top until expose preformed pile 1, a pressure-bearing platform 2 is set up above preformed pile 1, drawing mechanism 3 to be placed on pressure-bearing platform 2 and the axial line of the axial line of drawing mechanism 3 and preformed pile 1 on the same line, drawing mechanism 3 is installed with a tension platform 4, pressure-bearing platform 2 offers some perforation, pass the perforation on pressure-bearing platform 2 after stretching reinforcing bar 5 is fixedly connected with the main muscle 6 of axis of preformed pile 1 inside and be fixedly connected with tension platform 4, starting drawing mechanism 3 stops drawing mechanism 3 to boost when the force value of drawing mechanism 3 arrives the tension standard value of preformed pile 1, now as rising does not appear in preformed pile 1, show that the tensile value of preformed pile 1 is qualified, then show that the tensile value of preformed pile 1 is defective as rising appears in preformed pile 1.Drawing mechanism 3 is oil cylinder or jack.
The quantity of the perforation on pressure-bearing platform 2 is not less than the quantity of axially main muscle 6 on preformed pile 1, described stretching reinforcing bar 5 and axial main muscle 6 one_to_one corresponding form cage construction after also boring a hole, and it is inner that described drawing mechanism 3 is positioned at the cage construction formed by stretching reinforcing bar 5.
When preformed pile 1 is positioned at below layer of concrete 7, excavate layer of concrete 7 and form breach 8, the shape of breach 8 does not limit, as long as preformed pile 1 can be exposed, the inwall of breach 8 cuts a hole into rough structure, interrupts the transverse reinforcement 9 in layer of concrete 7 and makes to be extended outside breach 8 inwall by the end of the transverse reinforcement 9 interrupted.When later stage rehabilitating concrete layer 7, the transverse reinforcement 9 interrupted can be welded one to one with other reinforcing bars, and the inwall of breach 8 is cut a hole into rough structure and is convenient to be formed with the concrete newly inserted be engaged, and recovers the structure of original layer of concrete 7 as much as possible.
When cut out the soil layer at preformed pile 1 top and the top of the water level of underground water higher than preformed pile 1 time, borehole thus make the top of preformed pile 1 be exposed to soil layer outside again after preformed pile 1 over top pours into cement or cement paste makes the soil layer at preformed pile 1 top solidify.
Specific embodiment described herein is only to the explanation for example of the utility model spirit.The utility model person of ordinary skill in the field can make various amendment or supplements or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present utility model or surmount the scope that appended claims defines.
Although more employ the term such as preformed pile 1, pressure-bearing platform 2, drawing mechanism 3, tension platform 4, stretching reinforcing bar 5, axially main muscle 6, layer of concrete 7, breach 8, transverse reinforcement 9, pressure-bearing post 10, operating space 11 herein, do not get rid of the possibility using other term.These terms are used to be only used to describe and explain essence of the present utility model more easily; The restriction that they are construed to any one additional is all contrary with the utility model spirit.

Claims (5)

1. the tension checkout gear of a preformed pile, comprise the drawing mechanism (3) being arranged on preformed pile (1) top be embedded in soil layer, it is characterized in that, described preformed pile (1) top is provided with a pressure-bearing platform (2), drawing mechanism (3) is positioned on pressure-bearing platform (2), drawing mechanism (3) is installed with a tension platform (4), pressure-bearing platform (2) offers some perforation, stretching reinforcing bar (5) is fixedly connected with the inner main muscle of axis (6) of preformed pile (1) and passes the perforation on pressure-bearing platform (2) afterwards and be fixedly connected with tension platform (4).
2. the tension checkout gear of preformed pile according to claim 1, it is characterized in that, the quantity of the perforation on described pressure-bearing platform (2) is not less than the quantity of the upper axially main muscle (6) of preformed pile (1), described stretching reinforcing bar (5) and axial main muscle (6) one_to_one corresponding form cage construction after also boring a hole, and it is inner that described drawing mechanism (3) is positioned at the cage construction formed by stretching reinforcing bar (5).
3. the tension checkout gear of preformed pile according to claim 1 and 2, is characterized in that, described drawing mechanism (3) is oil cylinder or jack.
4. the tension checkout gear of preformed pile according to claim 1 and 2, is characterized in that, the axial line of described drawing mechanism (3) and the axial line of preformed pile (1) are located along the same line.
5. the tension checkout gear of preformed pile according to claim 1 and 2, it is characterized in that, described pressure-bearing platform (2) bottom has some pressure-bearing posts (10) of being fixedly connected with pressure-bearing platform (2) thus makes pressure-bearing platform (2) below form operating space (11).
CN201520600786.0U 2015-08-11 2015-08-11 Tensile detection device of precast pile Active CN205134391U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520600786.0U CN205134391U (en) 2015-08-11 2015-08-11 Tensile detection device of precast pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520600786.0U CN205134391U (en) 2015-08-11 2015-08-11 Tensile detection device of precast pile

Publications (1)

Publication Number Publication Date
CN205134391U true CN205134391U (en) 2016-04-06

Family

ID=55620198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520600786.0U Active CN205134391U (en) 2015-08-11 2015-08-11 Tensile detection device of precast pile

Country Status (1)

Country Link
CN (1) CN205134391U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064422A (en) * 2015-08-11 2015-11-18 周兆弟 Tensile detecting device and tensile detecting method of prefabricated pile
CN107142976A (en) * 2017-06-15 2017-09-08 钟利芬 One kind is used for prefabricated pile compressive resistance detection device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064422A (en) * 2015-08-11 2015-11-18 周兆弟 Tensile detecting device and tensile detecting method of prefabricated pile
CN107142976A (en) * 2017-06-15 2017-09-08 钟利芬 One kind is used for prefabricated pile compressive resistance detection device
CN107142976B (en) * 2017-06-15 2019-07-09 海南正达建设工程质量检测有限公司 A kind of equipment for the detection of prefabricated pile compressive resistance

Similar Documents

Publication Publication Date Title
CN105350584B (en) A kind of construction method of anti-float anchor rod
CN104131560A (en) Anti-floating anchor and construction method thereof
CN105421445A (en) Construction method for non-prestressed centrifugal high-strength concrete pile planted pile
CN201512810U (en) Retaining wall
CN202689009U (en) Steel sheet pile and tubular pile combined foundation pit supporting structure
CN205134391U (en) Tensile detection device of precast pile
CN102345292B (en) A kind of composite prestressed uplift pile with enlarged footing
CN201943069U (en) Precast compacting-enlarging pile
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN207582471U (en) A kind of Retaining Structure with Double-row Piles equipped with deep layer prestress anchorage cable
CN203530974U (en) Anti-floating anchor rod
CN110397059A (en) A kind of compound tree root pile constructing process of preexisting hole stiffness
CN210263075U (en) Arrange bars formula tubular pile post back slip casting internal anchor outer stagnant water support system
CN104563111A (en) Construction method for rock embedding of inclined pile
CN201474703U (en) Bearing structure of consolidated ring of hydraulic tunnel
CN203626866U (en) Layout structure for anchoring density degree nondestructive testing of bending anchor rods or anchor piles
CN105064422B (en) The tension detection means and tension detection method of prefabricated pile
CN208701693U (en) The concrete-steel strand cage of deep basal pit pre-stressing force cantilever support pile
CN205668323U (en) It is applied to the anchor plate that pile for prestressed pipe is installed
CN205501989U (en) Strengthen drilling secant pile
CN209194512U (en) Composite screw pilework
CN208618399U (en) A kind of pretensioned prestressed concrete pipe pile Quick Connect Kit
CN106759302A (en) One kind expansion uplift pile and its construction machinery and construction technology
CN201943071U (en) Implantable steel tube anchor rod with stabs
CN102155015A (en) Barbed implanted steel pipe anchor rod

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant