CN205132929U - Wire rope core conveyer belt production line wire rope spindle lifting device - Google Patents
Wire rope core conveyer belt production line wire rope spindle lifting device Download PDFInfo
- Publication number
- CN205132929U CN205132929U CN201520962249.0U CN201520962249U CN205132929U CN 205132929 U CN205132929 U CN 205132929U CN 201520962249 U CN201520962249 U CN 201520962249U CN 205132929 U CN205132929 U CN 205132929U
- Authority
- CN
- China
- Prior art keywords
- spindle
- wire rope
- production line
- rope core
- walking track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Rehabilitation Tools (AREA)
Abstract
The utility model discloses a wire rope core conveyer belt production line wire rope spindle lifting device, including hoisting device, hoisting device is including walking frame, hoisting frame, balladeur train and loading fork, the walking was put up rolling mechanism and was located on the spindle installation walking track, spindle installation walking track passes through rolling mechanism and installs on spindle delivery walking track, the hoisting frame passes through the rotation mechanism hoist and mount on the walking frame, the balladeur train passes through hoist mechanism and installs on the hoisting frame with slip or roll mode, load the fork setting on the balladeur train, spindle installation walking track is horizontal in wire rope core conveyer belt production line simplex position, spindle delivery walking track is vertically installed on the entablature of wire rope core conveyer belt production line simplex position. The utility model discloses can load the spindle on both sides, can reduce manufacturing cost by a wide margin, the spindle loads realizes wireless remote control, and the spindle loads convenient operation, and stability is reliable, the security is good.
Description
Technical field
The utility model relates to lifting facility, is specially a kind of production line of steel wire rope core wire rope spindle hanging device.
Background technology
Load-transfer device is produced front spindle and will is lifted on spindle shelf in advance, and spindle suspension is placed on the spindle axis on spindle shelf, and in production process, steel rope is derived from spindle.
Spindle conventional mounting mode has two kinds, and one relies on manual operation, and 2 ~ 4 people directly solely hand lift on the spindle axis that spindle is placed on spindle shelf, and another kind is installed by easy hoisting mechanism.
There is following defect in the first manual mode of operation:
1, rely on manual operation, spindle is directly installed very difficult.
2, need two people or many people operation, installation effectiveness is low.
3, because spindle quantity is more, consume physical efficiency during installation greatly, there is potential safety hazard.
There is following defect in another kind of installation with easy hoisting mechanism:
1, structure is simple, inconvenient operation.
2, operation stability is not high.
3, hoisting mechanism malfunction, needs before lifting manually to locate spindle, consumes physical efficiency.
Utility model content
For the deficiencies in the prior art, technical problem to be solved in the utility model proposes a kind of production line of steel wire rope core wire rope spindle hanging device facilitating spindle to install.
The production line of steel wire rope core wire rope spindle hanging device that can solve the problems of the technologies described above, its technical scheme comprises bont, difference is that described bont comprises walker, raising legs, balladeur train and loading pallet fork, described walker is located at spindle by rolling mechanism and is installed on walking track, described spindle is installed walking track and is installed on spindle delivery walking track by rolling mechanism, described raising legs is lifted on walker by swing type mechanism, described balladeur train is installed on raising legs by lift system with slip or roll mode, described loading pallet fork is arranged on balladeur train, described spindle installs walking track horizontal (front and rear direction) in production line of steel wire rope core list station, and described spindle delivery walking track longitudinally (left and right direction) is arranged on the entablatrance of production line of steel wire rope core list station.
A kind of structure of described swing type mechanism comprises the fixing outer ring and revolution inner ring of being installed by bearing, and described fixing outer ring is connected with walker, and described raising legs is installed with revolution inner ring and is connected.
On this basis, the structure that described lift system adopts comprises the lifting reducing motor of chain and folding and unfolding chain, and described lifting reducing motor is located on revolution inner ring, and described chain connects balladeur train.
The conventional structure of described rolling mechanism comprises the walking reducing motor of road wheel and ground-engaging wheel rotation.
The operation of wireless remotely-controlled Qi Yaokongge mechanism can be adopted, to alleviate the labour intensity of operator.
The beneficial effects of the utility model:
1, the utility model production line of steel wire rope core wire rope spindle hanging device is that be designed to by bont can longitudinal left and right walking, laterally can forward and backwardly walk, loading pallet fork can upper and lower free motion, conveniently can adapt to the spindle lifting of various weight and height.
2, be designed to can 360 degree of rotations for loading pallet fork of the present utility model, and spindle can arbitrarily angledly be placed in unit platforms, and spindle lifting easily.
3, the utility model uses wireless remotely-controlled technology, and operating position is unrestricted, and spindle ride operation is convenient, and it is accurate that the spindle axis on spindle and spindle shelf installs centering.
4, electric control operation stability of the present utility model is high, and safety is good, labour intensity is low.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of embodiment of the utility model on production line of steel wire rope core.
Fig. 2 is the lateral plan of Fig. 1.
Fig. 3 is the structural representation of Fig. 1 embodiment on production line of steel wire rope core list station.
Fig. 4 is the lateral plan of Fig. 3.
Figure number identifies: 1, walker; 2, fixing outer ring; 3, raising legs; 4, balladeur train; 5, pallet fork is loaded; 6, walking track installed by spindle; 7, spindle delivery walking track; 8, entablatrance; 9, road wheel; 10, walking reducing motor; 11, chain; 12, reducing motor is promoted; 13, wireless remotely-controlled device; 14, inner ring is turned round; 15, production line of steel wire rope core list station; 16, spindle shelf; 17, spindle axis; 18, spindle.
Detailed description of the invention
Below in conjunction with accompanying drawing illustrated embodiment, the technical solution of the utility model is described further.
The utility model production line of steel wire rope core wire rope spindle hanging device applies in production line of steel wire rope core list station 15, on front row, lower on rear row, lower four production line of steel wire rope core list stations 15 form the total manufacturing line of steel cable core conveying belt, in described production line of steel wire rope core list station 15, front side spindle shelf 16 is provided with, lower two rows are left, the spindle axis 17 of right direction, rear side spindle shelf 16 is provided with equally, lower two rows are left, the spindle axis 17 of right direction, spindle 18 corresponding to each spindle axis 17 is positioned on the platform of unit, the extraction spindle 18 respectively that act as of the present utility model is installed on corresponding spindle axis 17, as Fig. 1, shown in Fig. 2.
Main body of the present utility model is bont, and described bont comprises walker 1, raising legs 3, balladeur train 4, loading pallet fork 5, spindle delivery walking track 7, spindle installation walking track 6.
Described spindle delivery walking track 7 is front and back layout (transverse direction), two of left and right directions (longitudinal direction), article two, spindle delivery walking track 7 is bottom the entablatrance 8 being arranged on production line of steel wire rope core list station 15, described spindle installs that walking track 6 is left and right layout (longitudinal direction), two of fore-and-aft direction (transverse direction), article two, spindle installed rows walk track 6 by rolling mechanism be installed on spindle delivery walking track 7 on, described walker 1 is installed on two spindle installed rows by rolling mechanism and walks on track 6; Described rolling mechanism comprises the walking reducing motor 10 of road wheel 9 and ground-engaging wheel 9 rotation, as shown in Figure 3, Figure 4.
Described raising legs 3 is lifted on walker 1 by swing type mechanism, described swing type mechanism comprises the fixing outer ring 2 and revolution inner ring 14 of being installed by bearing, described fixing outer ring 2 is connected with walker 1, the upper end of described raising legs 3 is installed with revolution inner ring 14 and is connected, described balladeur train 4 is installed on raising legs 3 with rolling fit system, article two, load pallet fork 5 and be arranged on (yoke spacing is adjustable with the spindle 18 loading different size) on balladeur train 4, lift system is provided with between described balladeur train 4 and raising legs 3, described lift system comprises the lifting reducing motor 12 of chain 11 and folding and unfolding chain 11, described lifting reducing motor 12 is located on revolution inner ring 14, the lower end of described chain 11 connects balladeur train 4, as Fig. 3, shown in Fig. 4.
In said structure, the lifting of loading pallet fork 5 reels by promoting reducing motor 12 and releases chain 11 and realize, load pallet fork 5 turn to by revolution inner ring 14 relative to fixing outer ring 2 rotation and realize (rotate can be manual, may also be by arranging electronic drive separately), the walker 1 that moves through of loading pallet fork 5 front and rear direction is installed walking on walking track 6 in spindle and realizes, and the spindle installation walking track 6 that moves through in the loading left and right direction of pallet fork 5 is walked and realizes on spindle delivery walking track 7.
The various motions of described loading pallet fork 5 are all shaken by wireless remotely-controlled device 13 operation of controlling each kinematic mechanism and are realized.
Operation scheme of the present utility model:
Control loading pallet fork 5 walks to and extracts the position of spindle 18, loading pallet fork 5 is rotated according to being flapped toward of spindle 18, loading pallet fork 5 is pitched smoothly and gets spindle 18, promote the height loading pallet fork 5 to spindle 18 and need to install, turn to the position of loading pallet fork 5 to spindle 18 and needing to install, longitudinal walking is loaded pallet fork 5 and is put in place, and laterally walking loading pallet fork 5 is aimed at spindle axis 17 and installed spindle 18.
Claims (5)
1. production line of steel wire rope core wire rope spindle hanging device, comprise bont, it is characterized in that: described bont comprises walker (1), raising legs (3), balladeur train (4) and loading pallet fork (5), described walker (1) is located at spindle by rolling mechanism and is installed in walking track (6), described spindle is installed walking track (6) and is installed on spindle delivery walking track (7) by rolling mechanism, described raising legs (3) is lifted on walker (1) by swing type mechanism, described balladeur train (4) is installed on raising legs (3) by lift system with slip or roll mode, described loading pallet fork (5) is arranged on balladeur train (4), described spindle is installed walking track (6) and is horizontally placed in production line of steel wire rope core list station (15), and described spindle delivery walking track (7) is longitudinally arranged on the entablatrance (8) of production line of steel wire rope core list station (15).
2. production line of steel wire rope core wire rope spindle hanging device according to claim 1, it is characterized in that: described swing type mechanism comprises the fixing outer ring (2) and revolution inner ring (14) of being installed by bearing, described fixing outer ring (2) is connected with walker (1), and described raising legs (3) is installed with revolution inner ring (14) and is connected.
3. production line of steel wire rope core wire rope spindle hanging device according to claim 2, it is characterized in that: described lift system comprises the lifting reducing motor (12) of chain (11) and folding and unfolding chain (11), described lifting reducing motor (12) is located in revolution inner ring (14), and described chain (11) connects balladeur train (4).
4. according to the production line of steel wire rope core wire rope spindle hanging device in claims 1 to 3 described in any one, it is characterized in that: described rolling mechanism comprises the walking reducing motor (10) that road wheel (9) and ground-engaging wheel (9) rotate.
5. according to the production line of steel wire rope core wire rope spindle hanging device in claims 1 to 3 described in any one, it is characterized in that: the operation adopting wireless remotely-controlled device (13) Yao Kongge mechanism.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520962249.0U CN205132929U (en) | 2015-11-26 | 2015-11-26 | Wire rope core conveyer belt production line wire rope spindle lifting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520962249.0U CN205132929U (en) | 2015-11-26 | 2015-11-26 | Wire rope core conveyer belt production line wire rope spindle lifting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205132929U true CN205132929U (en) | 2016-04-06 |
Family
ID=55618743
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520962249.0U Active CN205132929U (en) | 2015-11-26 | 2015-11-26 | Wire rope core conveyer belt production line wire rope spindle lifting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205132929U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110053118A (en) * | 2019-04-29 | 2019-07-26 | 盐城工学院 | A kind of reciprocating cotton stalk core-skin separator |
CN114537957A (en) * | 2022-03-29 | 2022-05-27 | 江阴合威橡胶机械有限公司 | Automatic loading system for spindle room |
-
2015
- 2015-11-26 CN CN201520962249.0U patent/CN205132929U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110053118A (en) * | 2019-04-29 | 2019-07-26 | 盐城工学院 | A kind of reciprocating cotton stalk core-skin separator |
CN110053118B (en) * | 2019-04-29 | 2021-01-05 | 盐城工学院 | Reciprocating type cotton stalk skin-core separator |
CN114537957A (en) * | 2022-03-29 | 2022-05-27 | 江阴合威橡胶机械有限公司 | Automatic loading system for spindle room |
CN114537957B (en) * | 2022-03-29 | 2024-03-01 | 合威智能装备(江苏)有限公司 | Automatic loading system for spindle room |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203282964U (en) | Wheel assembly mounting and dismounting device | |
CN103183210B (en) | Double-track hydraulic right-angle turns to flatcar | |
CN207550222U (en) | Lifting electric stairs-mover | |
CN204793872U (en) | Movable cable pay-off rack | |
CN204184413U (en) | A kind of intelligent stair climbing transport trolley | |
CN204038312U (en) | For the goods transition apparatus of tiered warehouse facility | |
CN205132929U (en) | Wire rope core conveyer belt production line wire rope spindle lifting device | |
CN205222391U (en) | Hauler carrier is used in elevator installation | |
CN206187142U (en) | Carrying device based on focus adjustment mechanism | |
CN203767937U (en) | Lift truck | |
CN102849394B (en) | Automatic switch-over shifting device and operation method thereof | |
CN204960421U (en) | Parking equipment cantilever crane and applied parking equipment cantilever crane's parking equipment | |
CN207078231U (en) | New-energy automobile driver's cabin attaches together production line with chassis | |
CN207121374U (en) | A kind of four post lifts of single driving pair of chain drive | |
CN203669454U (en) | Parking equipment and wheel chock device thereof | |
CN209306535U (en) | A kind of door of elevator production discharging transferring device | |
CN205187182U (en) | Wall body conveyer | |
CN203081001U (en) | Vertical chain transmission solid parking equipment | |
CN203820325U (en) | Loading and unloading machine, vehicle-mounted type loading and unloading car and walking type loading and unloading car | |
CN205706959U (en) | A kind of abandoned car disassembling flow line | |
CN206203795U (en) | A kind of remote control lift transport vehicle of novel electromechanical integration | |
CN107878991A (en) | A kind of comprehensive floor truck | |
CN204043409U (en) | The scissors lift translation ferry bus car of automatic push-pull car device | |
CN203451166U (en) | Lifting device for hanging bracket | |
CN103643817B (en) | Vehicle lifting system in a kind of melt pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |