CN205123898U - Tunnel safety construction management and control and real -time monitoring system who gathers of field data - Google Patents
Tunnel safety construction management and control and real -time monitoring system who gathers of field data Download PDFInfo
- Publication number
- CN205123898U CN205123898U CN201520296409.2U CN201520296409U CN205123898U CN 205123898 U CN205123898 U CN 205123898U CN 201520296409 U CN201520296409 U CN 201520296409U CN 205123898 U CN205123898 U CN 205123898U
- Authority
- CN
- China
- Prior art keywords
- construction
- monitoring system
- tunnel
- field data
- real
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 42
- 238000009430 construction management Methods 0.000 title claims abstract description 24
- 238000010276 construction Methods 0.000 claims abstract description 62
- 238000000034 method Methods 0.000 claims abstract description 7
- 238000004891 communication Methods 0.000 claims description 10
- 241001269238 Data Species 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 238000009412 basement excavation Methods 0.000 claims description 3
- 230000005540 biological transmission Effects 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
Landscapes
- Emergency Alarm Devices (AREA)
Abstract
The utility model relates to a monitoring system discloses a tunnel safety construction management and control and real -time monitoring system who gathers of field data, monitoring system includes: collection system (1) for the various construction data of gathering the tunnel construction in -process in real time, and according to each the statement parameter that construction data acquisition corresponds, and terminal (2), with collection system (1) is connected, is used for receiving the statement parameter that corresponds generates the safe statement that signifies the construction situation. The utility model discloses tunnel safety construction management and control and real -time monitoring system who gathers of field data is the security of the current construction situation of accurate audio -visual reaction accessible time.
Description
Technical field
The utility model relates to monitoring system, particularly, relates to the monitoring system of the construction management and control of a kind of tunnel safety and field data Real-time Collection.
Background technology
Current, in constructing tunnel process, there is a large amount of problem, such as: construction quality, construction safety, field management etc.And mainly to be made a copy for various secure data by traditional-handwork at present, to understand the situation of job site.But manual making a copy for exists serious hysteresis quality, and easily makes mistakes, data scatter, Bu Nengji, reflect current condition of construction accurately, intuitively.
Utility model content
The purpose of this utility model is to provide the construction management and control of a kind of tunnel safety and field data Real-time Collection monitoring system, promptly and accurately can react the fail safe of current Construction Condition intuitively.
To achieve these goals, the monitoring system that the utility model provides a kind of tunnel safety to construct management and control and field data Real-time Collection, described monitoring system comprises: harvester, for the various construction datas in Real-time Collection constructing tunnel process, and obtain corresponding report parameter according to each described construction data; And terminal, being connected with described harvester, for receiving the report parameter of described correspondence, generating the Security Report characterizing Construction Condition.
Preferably, described harvester comprises: range cells, for gathering the cross-sectional area of current construction tunnel, determining earth volume, construction schedule and the construction quality data excavated, and the earth volume of described excavation, construction schedule and construction quality data are sent to described terminal.
Preferably, described harvester also comprises: bar code collecting unit, for gathering the bar code of current steel skeleton, determines current construction location, and described current construction location is sent to described terminal.
Preferably, described harvester also comprises: positioning unit, for gathering operating time and the place of described information collecting device, and described operating time and place is sent to described terminal.
Preferably, described positioning unit is active electronic label.
Preferably, described harvester also comprise following at least one: image acquisition units, for gathering the image information of tunnel construction site; Video acquisition unit, for gathering the video information of tunnel construction site; And audio collection unit, for gathering the audio-frequency information of tunnel construction site; Described terminal is also for showing at least one in described image, Audio and Video information.
Preferably, described monitoring system also comprises: blue-teeth communication equipment, is arranged between described harvester and terminal, sets up wireless connections for making described harvester and described terminal.
Preferably, described monitoring system also comprises: long-distance monitorng device, is connected with described terminal, for carrying out remote monitoring to constructing tunnel situation in real time.
Preferably, described monitoring system also comprises: Wifi communication device, is arranged between described terminal and long-distance monitorng device, sets up wireless connections for making described terminal and described long-distance monitorng device.
The monitoring system of the construction management and control of the utility model tunnel safety and field data Real-time Collection, can various construction datas in Real-time Collection constructing tunnel process by the setting of harvester, promptly and accurately; Generated the Security Report characterizing Construction Condition by terminal, intuitively can react the fail safe of current Construction Condition accurately.
Other features and advantages of the utility model are described in detail in embodiment part subsequently.
Accompanying drawing explanation
Accompanying drawing is used to provide further understanding of the present utility model, and forms a part for specification, is used from explanation the utility model, but does not form restriction of the present utility model with embodiment one below.In the accompanying drawings:
Fig. 1 is the modular structure schematic diagram of the monitoring system of the construction management and control of the utility model tunnel safety and field data Real-time Collection.
Description of reference numerals
1 harvester 11 range cells
12 bar code collecting unit 13 positioning units
14 image acquisition units 15 video acquisition unit
16 audio collection unit 2 terminals
3 blue-teeth communication equipment 4 long-distance monitorng devices
5Wifi communication device.
Embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is described in detail.Should be understood that, embodiment described herein, only for instruction and explanation of the utility model, is not limited to the utility model.
As shown in Figure 1, the monitoring system of the construction management and control of the utility model tunnel safety and field data Real-time Collection comprises harvester 1, for the various construction datas in Real-time Collection constructing tunnel process, and obtains corresponding report parameter according to each described construction data; And terminal 2, being connected with described harvester 1, for receiving the report parameter of described correspondence, generating the Security Report characterizing Construction Condition.
The monitoring system of the construction management and control of the utility model tunnel safety and field data Real-time Collection, can various construction datas in Real-time Collection constructing tunnel process by the setting of harvester, promptly and accurately; Generated the Security Report characterizing Construction Condition by terminal, intuitively can react the fail safe of current Construction Condition accurately.
As shown in Figure 1, the monitoring system of the construction management and control of the utility model tunnel safety and field data Real-time Collection also comprises blue-teeth communication equipment 3, be arranged between described harvester 1 and terminal 2, for making described harvester 1 set up wireless connections with described terminal 2, realize the short range transmission of the information between described harvester 1 and described terminal 2.
As shown in Figure 1, described harvester 1 comprises range cells 11, for gathering the cross-sectional area of current construction tunnel, determining earth volume, construction schedule and the construction quality data excavated, and the earth volume of described excavation, construction schedule and construction quality data are sent to described terminal 2.Wherein, range cells 11 can be the distance-measuring equipment of distance measuring sensor or other support Bluetooth transmission.
Described harvester 1 also comprises bar code collecting unit 12, for gathering the bar code of current steel skeleton, determines current construction location, and described current construction location is sent to described terminal 2.Wherein, described bar code collecting unit 12 can be barcode scanner, gathers the bar code of current steel skeleton, can determine the arrangement sequence number of described steel skeleton, and then determine current construction location.
Described harvester 1 also comprises positioning unit 13, for gathering operating time and the place of described information collecting device 1, and described operating time and place is sent to described terminal 2.By the setting of described positioning unit 13, the real effectiveness of Information Monitoring can be guaranteed.Wherein, described positioning unit 13 is active electronic label.
The monitoring system of the construction management and control of the utility model tunnel safety and field data Real-time Collection is by the collection to above-mentioned various construction data, to go forward side by side row relax, form standardization, completes report data, export or display with the form of Security Report, intuitively accurately.
In addition, described harvester 1 also comprise following at least one: image acquisition units 14, for gathering the image information of tunnel construction site; Video acquisition unit 15, for gathering the video information of tunnel construction site; And audio collection unit 16, for gathering the audio-frequency information of tunnel construction site; Described terminal 2 is also for showing at least one in described image, Audio and Video information.
When judging that current Construction Condition is dangerous according to described Security Report, by looking up the fault root in the image of retention of the correspondence of display in described terminal 2, video and/or audio information.Wherein, described image acquisition units 14 can be imageing sensor, such as camera; Described video acquisition unit 15 can be video sensor, such as camera; Described audio collection unit 16 can be audio sensor.
By the setting of described image acquisition units 14, video acquisition unit 15 and/or audio collection unit 16, auxiliary monitoring, can guarantee the fail safe of constructing; When the construction of Security Report sign is broken down, can construction stage of breaking down and operation in determination construction promptly and accurately, to take measures on customs clearance in time, ensure tunnel safety construction, can avoid in work progress, occur that serious problems cause any property loss and loss of life or personal injury.
As shown in Figure 1, the monitoring system of the construction management and control of the utility model tunnel safety and field data Real-time Collection also comprises long-distance monitorng device 4, is connected, for carrying out remote monitoring to constructing tunnel situation in real time with described terminal 2.Lay cable when long-distance transmissions for avoiding information and increase cost, the construction management and control of the utility model tunnel safety and field data Real-time Collection monitoring system also comprise Wifi communication device 5, be arranged between described terminal 2 and long-distance monitorng device 4, for making described terminal 2 set up wireless connections with described long-distance monitorng device 4, realize the long-distance transmissions of the information between described terminal 2 and described long-distance monitorng device 4.
The monitoring system of the construction management and control of the utility model tunnel safety and field data Real-time Collection is by the setting of long-distance monitorng device, can by Security Report promptly and accurately report to long-distance monitorng device, make outer monitoring personnel understand the condition of construction of job site in real time; And when breaking down, taking measures promptly and accurately, guarantees the safety of constructing; By the setting of blue-teeth communication equipment and Wifi communication device, utilize technology of Internet of things, realize the wireless transmission of information, make information transmission rapid, avoid laying cable simultaneously, reduce production cost.
Below preferred implementation of the present utility model is described by reference to the accompanying drawings in detail; but; the utility model is not limited to the detail in above-mentioned execution mode; within the scope of technical conceive of the present utility model; can carry out multiple simple variant to the technical solution of the utility model, these simple variant all belong to protection range of the present utility model.
It should be noted that in addition, each concrete technical characteristic described in above-mentioned embodiment, in reconcilable situation, can be combined by any suitable mode, in order to avoid unnecessary repetition, the utility model illustrates no longer separately to various possible compound mode.
In addition, also can carry out combination in any between various different execution mode of the present utility model, as long as it is without prejudice to thought of the present utility model, it should be considered as content disclosed in the utility model equally.
Claims (9)
1. a monitoring system for tunnel safety construction management and control and field data Real-time Collection, it is characterized in that, described monitoring system comprises:
Harvester (1), for the various construction datas in Real-time Collection constructing tunnel process, and obtains corresponding report parameter according to each described construction data; And
Terminal (2), is connected with described harvester (1), for receiving the report parameter of described correspondence, generates the Security Report characterizing Construction Condition.
2. the monitoring system of tunnel safety construction management and control according to claim 1 and field data Real-time Collection, it is characterized in that, described harvester (1) comprising:
Range cells (11), for gathering the cross-sectional area of current construction tunnel, determine earth volume, construction schedule and the construction quality data excavated, and the earth volume of described excavation, construction schedule and construction quality data are sent to described terminal (2).
3. the monitoring system of tunnel safety construction management and control according to claim 1 and field data Real-time Collection, it is characterized in that, described harvester (1) also comprises:
Bar code collecting unit (12), for gathering the bar code of current steel skeleton, determines current construction location, and described current construction location is sent to described terminal (2).
4. the monitoring system of tunnel safety construction management and control according to claim 1 and field data Real-time Collection, it is characterized in that, described harvester (1) also comprises:
Positioning unit (13), for gathering operating time and the place of described harvester (1), and is sent to described terminal by described operating time and place.
5. the monitoring system of tunnel safety construction management and control according to claim 4 and field data Real-time Collection, it is characterized in that, described positioning unit (13) is active electronic label.
6. the monitoring system of tunnel safety according to claim 1 construction management and control and field data Real-time Collection, is characterized in that, described harvester (1) also comprise following at least one:
Image acquisition units (14), for gathering the image information of tunnel construction site;
Video acquisition unit (15), for gathering the video information of tunnel construction site; And
Audio collection unit (16), for gathering the audio-frequency information of tunnel construction site;
Described terminal (2) is also for showing at least one in described image, Audio and Video information.
7. the tunnel safety construction management and control according to any one of claim 1-6 and the monitoring system of field data Real-time Collection, it is characterized in that, described monitoring system also comprises:
Blue-teeth communication equipment (3), is arranged between described harvester (1) and terminal (2), sets up wireless connections for making described harvester (1) and described terminal (2).
8. the tunnel safety construction management and control according to any one of claim 1-6 and the monitoring system of field data Real-time Collection, it is characterized in that, described monitoring system also comprises:
Long-distance monitorng device (4), is connected with described terminal (2), for carrying out remote monitoring to constructing tunnel situation in real time.
9. the monitoring system of tunnel safety construction management and control according to claim 8 and field data Real-time Collection, it is characterized in that, described monitoring system also comprises:
Wifi communication device (5), is arranged between described terminal (2) and long-distance monitorng device (4), sets up wireless connections for making described terminal (2) and described long-distance monitorng device (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520296409.2U CN205123898U (en) | 2015-05-08 | 2015-05-08 | Tunnel safety construction management and control and real -time monitoring system who gathers of field data |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520296409.2U CN205123898U (en) | 2015-05-08 | 2015-05-08 | Tunnel safety construction management and control and real -time monitoring system who gathers of field data |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205123898U true CN205123898U (en) | 2016-03-30 |
Family
ID=55579466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520296409.2U Expired - Fee Related CN205123898U (en) | 2015-05-08 | 2015-05-08 | Tunnel safety construction management and control and real -time monitoring system who gathers of field data |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205123898U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106127412A (en) * | 2016-07-05 | 2016-11-16 | 重庆交通大学 | A kind of engineering quality supervision and management method and device |
CN110005469A (en) * | 2019-03-25 | 2019-07-12 | 四川隧唐科技股份有限公司 | Constructing tunnel monitoring method, apparatus and system |
-
2015
- 2015-05-08 CN CN201520296409.2U patent/CN205123898U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106127412A (en) * | 2016-07-05 | 2016-11-16 | 重庆交通大学 | A kind of engineering quality supervision and management method and device |
CN110005469A (en) * | 2019-03-25 | 2019-07-12 | 四川隧唐科技股份有限公司 | Constructing tunnel monitoring method, apparatus and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104216293B (en) | B/S and C/S architectural pattern based information monitoring and measuring method for tunnels and underground constructions | |
CN205080699U (en) | Forest firework intelligent early warning system based on thing networking | |
CN203199897U (en) | Tower crane operation monitoring device | |
CN112019593A (en) | Data transmission system of electric tool | |
CN106383463A (en) | Construction environmental monitoring system and method based on safety helmet | |
CN207301751U (en) | The engineering machinery vehicle operation monitoring system of power grid wisdom building site control platform | |
CN104600844A (en) | Power grid disaster monitoring and rush repairing system and method based on geographic information system (GIS) | |
CN103217948A (en) | Cable laying long-range control system | |
CN205123898U (en) | Tunnel safety construction management and control and real -time monitoring system who gathers of field data | |
CN104698918A (en) | Engineering machinery remote monitoring system | |
CN111035098A (en) | Intelligent safety helmet for wind power plant | |
CN203204439U (en) | Wireless monitoring device for safety of tower erection | |
CN202443641U (en) | Electronic barrel and examination site assessment system for special operation examinations | |
CN210007724U (en) | cloud platform management monitoring system | |
CN204883348U (en) | Cement produced with dry method production line safety monitoring system | |
CN102156948B (en) | System for electronically recognizing power line towers and automatically positioning on-pole workers | |
CN205141522U (en) | Line appearance is patrolled to portable intelligence | |
CN204887250U (en) | Construction engineering quality control system based on thing networking | |
CN107049284B (en) | Vital sign monitoring and positioning system | |
CN205802820U (en) | Safety of tower crane monitoring device based on ZigBee and video following | |
CN104570841A (en) | Multifunctional power distribution mistake precaution terminal | |
CN204013616U (en) | Intelligent instrument and intelligent monitor system | |
CN204288432U (en) | A kind of distribution steps on the sub-monitor system of bar operation real training safety auxiliary electrical | |
CN203867617U (en) | Monitoring system used for inclined shaft work area of Guanjiao tunnel | |
CN207856142U (en) | A kind of novel building fire protection and maintained equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160330 |
|
CF01 | Termination of patent right due to non-payment of annual fee |