CN205116379U - Glass steel open caisson modularization pump station of quick construction - Google Patents
Glass steel open caisson modularization pump station of quick construction Download PDFInfo
- Publication number
- CN205116379U CN205116379U CN201520608493.7U CN201520608493U CN205116379U CN 205116379 U CN205116379 U CN 205116379U CN 201520608493 U CN201520608493 U CN 201520608493U CN 205116379 U CN205116379 U CN 205116379U
- Authority
- CN
- China
- Prior art keywords
- reinforced plastic
- fiber reinforced
- glass fiber
- well
- well bore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A glass steel open caisson modularization pump station of quick construction, including glass steel pump house well, glass steel pump house well pass through distributing water pipe and glass steel distributing well intercommunication, glass steel pump house well pass through inlet tube and glass steel grating well intercommunication, the bottom of glass steel pump house well be equipped with the drain pump, the drain pump with go out the water pressure union coupling, the construction is quick.
Description
Technical field
The utility model belongs to drainage works field, is specifically related to a kind of glass fiber reinforced plastic open caisson modularization pumping plant of rapid construction.
Background technology
There is municipal drainage pumping plant newly-built in a large number every year now, mainly adopt reinforced concrete structure, but steel concrete pump house well tools has the shortcomings such as long construction period, complex process, floor space are large.In recent years market there is the finished product pumping plant of glass fiber reinforced plastic, but because this kind of pumping plant is arranged on by equipment in a glass fiber reinforced plastic tank body, can only excavation construction, therefore this kind of pumping plant can only be used for that small scale, water inlet pipe buried depth are more shallow, the uncomplicated location of field condition or could safe construction after carrying out deep foundation pit support, applicable elements is limited.
Summary of the invention
The utility model, for the problems referred to above, provides a kind of glass fiber reinforced plastic open caisson modularization pumping plant of rapid construction.
The glass fiber reinforced plastic open caisson modularization pumping plant of a kind of rapid construction described in the utility model, comprise glass fiber reinforced plastic pump house well, described glass fiber reinforced plastic pump house well is communicated with glass fiber reinforced plastic distribution well by distribution pipe, and described glass fiber reinforced plastic pump house well is communicated with glass-fiber reinforced plastic grille well by water inlet pipe, described glass fiber reinforced plastic pump house well comprises well bore, glass fiber reinforced plastic base plate and glass fibre reinforced plastic manhole covers, described well bore is spliced up and down by least two joint glass fiber reinforced plastic pit shafts, glass fiber reinforced plastic base plate is provided with in the bottom of well bore, glass fibre reinforced plastic manhole covers is stamped on the top of well bore, drainage pump is provided with in the bottom of well bore, drainage pump is connected with water outlet standpipe, water outlet pressure solenoid is provided with at upper wellbore section glass fiber reinforced plastic pit shaft avris, water outlet pressure solenoid is connected with water outlet standpipe by valve, upper wellbore section glass fiber reinforced plastic pit shaft outer ring is provided with concrete anti-floating counterweight, cat ladder is provided with in well bore, operating platform is provided with in upper wellbore section, concrete anti-floating counterweight is provided with switchbox, concrete sealing bottom is made with in glass fiber reinforced plastic base plate bottom.
Described water outlet standpipe and valve are located at that well bore is inner or well bore is outside.Described glass fiber reinforced plastic pit shaft is sinking type pit shaft.
The beneficial effects of the utility model are: the sinking type pit shaft that the utility model pit shaft adopts the glass fiber reinforced plastic of high strength or fiber glass resin concrete material (or ordinary steel) to make, there is the advantage of reinforced concrete open caisson: without the need to deep foundation pit support during construction, there is again the advantage of glass fiber reinforced plastic finished product well: can factory normalization produce after Assembling, quick construction, simple, good airproof performance, good endurance, high, widely applicable without the need to on-the-spot maintenance, standardization level are installed.Multiple small-sized pump house well organic assembling can be become the drainage pumping plant that large-scale simultaneously as required, can greatly save duration and cost compared with conventional steel bar concrete pumping plant.
The utility model difference compared with ordinary reinforced concrete open caisson pump house is: the duration is short, ordinary reinforced concrete open caisson construction comprises levelling of the land, build bed course, reinforcement fabrication colligation, set up support, template construct, concreting maintenance, first segment concrete builds second section and Section three etc. again after reaching some strength, well sinking, bottom sealing, set up support and build top board etc., equipment installation etc., the duration of reinforced concrete open caisson pumping plant is about 3 months, and the utility model only need from be transported to after factory purchases scene directly sink, about 3 week of duration, later stage repairs convenient, and reinforced concrete open caisson produces quality problems in making or work progress, is difficult to repair, most discarded, and the utility model is supplied by factory, reliable in quality, even if go wrong in work progress, the pit shaft of glass steel material also can field repair.
The utility model difference compared with common finished product pumping plant is: without the need to Extra-Deep Foundation Pit, because common finished product pumping plant is tank type structure, can only excavation construction, and the buried depth of drainage pumping plant is all very dark, the design of Extra-Deep Foundation Pit, evaluation and construction will be carried out like this by regulation excavation construction, the waste duration also increases great amount of investment, and construction safety has hidden danger.
Accompanying drawing explanation
Fig. 1 is a kind of glass fiber reinforced plastic open caisson modularization pumping plant combined planar signal of rapid construction.
Fig. 2 is a kind of glass fiber reinforced plastic open caisson floor map of rapid construction.
Fig. 3 is a kind of glass fiber reinforced plastic open caisson generalized section of rapid construction.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is further described.
As shown in the figure, the glass fiber reinforced plastic open caisson modularization pumping plant of a kind of rapid construction described in the utility model, comprise glass fiber reinforced plastic pump house well 2, described glass fiber reinforced plastic pump house well 2 is communicated with glass fiber reinforced plastic distribution well 4 by distribution pipe 3, and described glass fiber reinforced plastic pump house well 2 is communicated with glass-fiber reinforced plastic grille well 6 by water inlet pipe 5; Described glass fiber reinforced plastic pump house well 2 comprises well bore, glass fiber reinforced plastic base plate 14 and glass fibre reinforced plastic manhole covers 9, and described well bore is spliced by glass fiber reinforced plastic pit shaft 15, glass fiber reinforced plastic pit shaft 16, glass fiber reinforced plastic pit shaft about 17.Be provided with glass fiber reinforced plastic base plate 14 in the bottom of well bore, be stamped glass fibre reinforced plastic manhole covers 9 on the top of well bore.Be provided with drainage pump 13 in the bottom of well bore, drainage pump 13 is connected with water outlet standpipe 12, and be provided with water outlet pressure solenoid 1 at upper wellbore section glass fiber reinforced plastic pit shaft 17 avris, water outlet pressure solenoid 1 is connected with water outlet standpipe 12 by valve 11.Upper wellbore section glass fiber reinforced plastic pit shaft 17 outer ring is provided with concrete anti-floating counterweight 8, is provided with cat ladder 19, is provided with operating platform 18 in upper wellbore section in well bore, and concrete anti-floating counterweight 8 is provided with switchbox 10, is made with concrete sealing bottom 20 in glass fiber reinforced plastic base plate 14 bottom.
Described water outlet standpipe 12 and valve 11 are located at that well bore is inner or well bore is outside.Described glass fiber reinforced plastic pit shaft is sinking type pit shaft.
Sequence of construction of the present utility model is: after smooth location, first segment glass fiber reinforced plastic pit shaft 15 is placed in precalculated position, cut the earth, second section pit shaft 16 is installed after sinking to certain position, socket joint is adopted to connect (band rubber ring) between pit shaft, with bolt is fixing, pit shaft is linked to be entirety again after insertion, and then next joint pit shaft 17 is installed in sinking of cutting the earth again, until well-sinking is to design elevation.Then construction concrete anti-floating counterweight 9 (also can adopt prefabricated counterweight), to construct after maintenance concrete sealing bottom 20, if the good concrete sealing bottom of geological conditions can change sand-gravel cushion into, if features as poor geologic condition concrete sealing bottom, it is bottom concrete under water, then mounting glass steel sole plate 14 and distribution pipe 3, finally installs internal unit and glass well lid 9 etc.If will build larger combination pumping plant, then glass fiber reinforced plastic pump house well 2, glass fiber reinforced plastic distribution well 4, glass-fiber reinforced plastic grille well 6 can together be constructed or construct successively, are connected finally by pipeline.
Claims (3)
1. a glass fiber reinforced plastic open caisson modularization pumping plant for rapid construction, comprises glass fiber reinforced plastic pump house well, and it is characterized in that described glass fiber reinforced plastic pump house well is communicated with glass fiber reinforced plastic distribution well by distribution pipe, described glass fiber reinforced plastic pump house well is communicated with glass-fiber reinforced plastic grille well by water inlet pipe, described glass fiber reinforced plastic pump house well comprises well bore, glass fiber reinforced plastic base plate and glass fibre reinforced plastic manhole covers, described well bore is spliced up and down by least two joint glass fiber reinforced plastic pit shafts, glass fiber reinforced plastic base plate is provided with in the bottom of well bore, glass fibre reinforced plastic manhole covers is stamped on the top of well bore, drainage pump is provided with in the bottom of well bore, drainage pump is connected with water outlet standpipe, water outlet pressure solenoid is provided with at upper wellbore section glass fiber reinforced plastic pit shaft avris, water outlet pressure solenoid is connected with water outlet standpipe by valve, upper wellbore section glass fiber reinforced plastic pit shaft outer ring is provided with concrete anti-floating counterweight, cat ladder is provided with in well bore, operating platform is provided with in upper wellbore section, concrete anti-floating counterweight is provided with switchbox.
2. the glass fiber reinforced plastic open caisson modularization pumping plant of rapid construction according to claim 1, is characterized in that described water outlet standpipe and valve are located at that well bore is inner or well bore is outside.
3. the glass fiber reinforced plastic open caisson modularization pumping plant of rapid construction according to claim 1, is characterized in that described glass fiber reinforced plastic pit shaft is sinking type pit shaft.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520608493.7U CN205116379U (en) | 2015-08-13 | 2015-08-13 | Glass steel open caisson modularization pump station of quick construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520608493.7U CN205116379U (en) | 2015-08-13 | 2015-08-13 | Glass steel open caisson modularization pump station of quick construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205116379U true CN205116379U (en) | 2016-03-30 |
Family
ID=55571999
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520608493.7U Active CN205116379U (en) | 2015-08-13 | 2015-08-13 | Glass steel open caisson modularization pump station of quick construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205116379U (en) |
-
2015
- 2015-08-13 CN CN201520608493.7U patent/CN205116379U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105089145A (en) | Glass reinforced plastic open caisson modularization pump station capable of being quickly constructed and construction method thereof | |
CN202208931U (en) | Individual combination type inspection well | |
CN100424281C (en) | Linear contacting water-collecting device | |
CN103882889A (en) | Bottom plate waterproofing system of foundation of building | |
CN108842904A (en) | A kind of the glass reinforced plastic open caisson modularization pumping plant and its construction method of rapid construction | |
CN114564782A (en) | BIM-based foundation pit site drainage system construction method | |
CN203049630U (en) | Building foundation slab waterproof system | |
CN205116379U (en) | Glass steel open caisson modularization pump station of quick construction | |
CN201411771Y (en) | Machine set repairing drain system | |
CN108149775A (en) | A kind of prefabricated Boosting pumping station of PE and its mounting process | |
CN204112365U (en) | Integrated form steel valve pit | |
CN201400679Y (en) | Prestressed steel cylinder concrete marsh gas generation tank | |
RU2382144C1 (en) | Method of draining of tubelike mineral deposit | |
CN110080216A (en) | A kind of water storage system and its construction method using supporting tubular pole | |
CN203487584U (en) | Modularized integration pump station | |
CN206442794U (en) | A kind of sewerage system of greenhouse for planting vegetable | |
CN214143998U (en) | Sewage collecting pipe network arrangement structure for households along river | |
CN105155622B (en) | Portable feedwater piping deslagging air bleeding valve checks system | |
CN211445327U (en) | Organic contaminated site groundwater remediation system | |
CN107700548A (en) | A kind of integrated valve well | |
CN209817036U (en) | Fabricated drop well suitable for urban drainage pipe network | |
CN2743440Y (en) | Environmental protection type build up composite inspection well | |
CN206928262U (en) | Formula or river channel hydroelectric generation factory building sump structure behind dam | |
CN217150321U (en) | Water drainage system falls in anti little foundation ditch under in rock foundation ditch | |
CN216163692U (en) | Bury formula sewage treatment plant's ecological landscape layout structure entirely |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 314505 No.318, Zhonghuan South Road, Jiaxing City, Zhejiang Province Patentee after: Yangtze River Delta (Jiaxing) Urban and Rural Construction Design Group Co.,Ltd. Address before: 314505 No.318, Zhonghuan South Road, Jiaxing City, Zhejiang Province Patentee before: JIAXING PLANNING & RESEARCH INSTITUTE Co.,Ltd. |