CN108842904A - A kind of the glass reinforced plastic open caisson modularization pumping plant and its construction method of rapid construction - Google Patents
A kind of the glass reinforced plastic open caisson modularization pumping plant and its construction method of rapid construction Download PDFInfo
- Publication number
- CN108842904A CN108842904A CN201810655135.XA CN201810655135A CN108842904A CN 108842904 A CN108842904 A CN 108842904A CN 201810655135 A CN201810655135 A CN 201810655135A CN 108842904 A CN108842904 A CN 108842904A
- Authority
- CN
- China
- Prior art keywords
- reinforced plastic
- glass reinforced
- well
- glass
- well bore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D23/00—Caissons; Construction or placing of caissons
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D23/00—Caissons; Construction or placing of caissons
- E02D23/08—Lowering or sinking caissons
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/22—Adaptations of pumping plants for lifting sewage
Abstract
The glass reinforced plastic open caisson modularization pumping plant and its construction method of a kind of rapid construction of the present invention, including glass reinforced plastic pump house well, the glass reinforced plastic pump house well is connected to by sparge pipe with glass reinforced plastic distribution well, and the glass reinforced plastic pump house well is connected to by water inlet pipe with glass-fiber reinforced plastic grille well;The bottom of the glass reinforced plastic pump house well is equipped with draining pump, and draining pump is connect with water outlet pressure solenoid.Construction method of the present invention is:The glass reinforced plastic pit shaft of the factorial production is completed to be assembled into well bore at the construction field (site), and well bore is sunk to designed elevation using drop shaft sinking, installs glass reinforced plastic bottom plate again after concrete sealing bottom is completed in well bore bottom.Other equipment, pipeline and well lid are installed after back cover, complete the construction at single small-scale glass reinforced plastic pump house well pump station.Then multiple glass reinforced plastic pump house wells are connected on glass reinforced plastic distribution well as needed by sparge pipe, then are connect by water inlet pipe with glass-fiber reinforced plastic grille well, form a larger pumping plant.
Description
Technical field
The invention belongs to drainage system fields, and in particular to a kind of glass reinforced plastic open caisson modularization pumping plant of rapid construction and its
Construction method.
Background technique
There is largely newly-built municipal drainage pumping plant every year now, mainly uses reinforced concrete structure, but reinforced concrete
Tu Bengfangjing has the shortcomings that long construction period, complex process, takes up a large area.Occurred in the market in recent years glass reinforced plastic at
Product pumping plant, but since this kind of pumping plant is mounted on equipment in one glass fiber reinforced plastic tank body, can only excavation construction, therefore this kind of pumping plant
It is only used for shallower small scale, water inlet pipe buried depth, the uncomplicated location of field condition or carries out ability safety after deep foundation pit support
Construction, applicable elements are limited.
Summary of the invention
The present invention is in view of the above-mentioned problems, provide the glass reinforced plastic open caisson modularization pumping plant and its construction party of a kind of rapid construction
Method.
A kind of glass reinforced plastic open caisson modularization pumping plant of rapid construction of the present invention, including glass reinforced plastic pump house well,
The glass reinforced plastic pump house well be connected to by sparge pipe with glass reinforced plastic distribution well, the glass reinforced plastic pump house well pass through water inlet pipe and
The connection of glass-fiber reinforced plastic grille well;The glass reinforced plastic pump house well includes well bore, glass reinforced plastic bottom plate and glass fibre reinforced plastic manhole covers, the well bore
It is spliced up and down by least two section glass reinforced plastic pit shafts, is equipped with glass reinforced plastic bottom plate in the bottom of well bore, is stamped on the top of well bore
Glass fibre reinforced plastic manhole covers are equipped with draining pump in the bottom of well bore, and draining pump is connect with water outlet standpipe, on upper wellbore section glass reinforced plastic pit shaft side
Side is equipped with water outlet pressure solenoid, and water outlet pressure solenoid is connect by valve with water outlet standpipe, and upper wellbore section glass reinforced plastic pit shaft outer ring is equipped with
Concrete anti-floating counterweight is equipped with ladder in well bore, is equipped with operating platform in upper wellbore section, sets peace in concrete anti-floating counterweight
Equipped with distribution box, concrete sealing bottom has been done in glass reinforced plastic bottom plate lower part.
The water outlet standpipe and valve are set to inside well bore or outside well bore.The glass reinforced plastic pit shaft is sinking type well
Cylinder.
A kind of construction method of the glass reinforced plastic open caisson modularization pumping plant of rapid construction of the present invention is:The factorial production
Glass reinforced plastic pit shaft complete to be assembled into well bore at the construction field (site), well bore is sunk to by designed elevation using drop shaft sinking, in well bore bottom
Glass reinforced plastic bottom plate is installed again after completing concrete sealing bottom;The construction that concrete anti-floating counterweight is installed on well bore upper section should be in concrete
It is completed before back cover;Draining pump, water outlet pressure solenoid, water outlet standpipe, valve, ladder, operating platform, well are installed after concrete sealing bottom
Lid, distribution box, this completes the constructions at single small-scale glass reinforced plastic pump house well pump station;Then as needed by multiple glass
Glass steel pump house well is connected on glass reinforced plastic distribution well by sparge pipe, then is connect by water inlet pipe with glass-fiber reinforced plastic grille well, is formed
One larger pumping plant.
The beneficial effects of the invention are as follows:Pit shaft of the present invention is using high-intensitive glass reinforced plastic or fiber glass resin concrete material
Sinking type pit shaft, has the advantages that reinforced concrete open caisson made of (or ordinary steel):It is not necessarily to deep foundation pit support when construction, and has
There is the advantages of glass reinforced plastic finished product well:Can on-site assembly after factory normalization production, quick construction, installation be simple, good airproof performance, resistance to
Long property is good, high, widely applicable without scene maintenance, standardization level.Multiple small-sized pump house wells can be had as needed simultaneously
Machine is combined into a large-scale drainage pumping plant, and duration and cost can be greatlyd save compared with conventional steel bar concrete pumping plant.
Present invention difference compared with ordinary reinforced concrete open caisson pump house is:Short time limit, ordinary reinforced concrete are heavy
Well construction includes levelling of the land, pours bed course, reinforcement fabrication and bind, set up bracket, template construct, casting concrete and support
Shield, first segment concrete pour the second section and third section etc. after reaching some strength again, well sinking, bottom sealing, set up branch
Frame and pour top plate etc., equipment installation etc., the duration of reinforced concrete open caisson pumping plant is about 3 months, and the present invention only need to be from work
Factory is transported to scene and directly starts to sink after purchasing, about 3 week of duration;It is convenient that later period repairs, and reinforced concrete open caisson is making
Or quality problems are generated in work progress, it is difficult to repair, majority is discarded, and the present invention is supplied by factory, reliable in quality, even if applying
It goes wrong during work, the pit shaft of glass steel material can also be with field repair.
The present invention distinguishes compared with common finished product pumping plant to be:Without Extra-Deep Foundation Pit, since common finished product pumping plant is
Tank type structure, can only excavation construction, and the buried depth of drainage pumping plant is all very deep, will carry out deep base by regulation excavation construction in this way
Design, evaluation and the construction of pit enclosure waste the duration and increase great amount of investment, and construction safety has hidden danger.
Detailed description of the invention
Fig. 1 is a kind of glass reinforced plastic open caisson modularization pumping plant combined planar signal of rapid construction.
Fig. 2 is a kind of glass reinforced plastic open caisson floor map of rapid construction.
Fig. 3 is a kind of glass reinforced plastic open caisson diagrammatic cross-section of rapid construction.
Specific embodiment
The present invention is further illustrated in the following with reference to the drawings and specific embodiments.
As shown, a kind of rapid construction of the present invention glass reinforced plastic open caisson modularization pumping plant, including glass
Glass steel pump house well 2, the glass reinforced plastic pump house well 2 are connected to by sparge pipe 3 with glass reinforced plastic distribution well 4, the glass reinforced plastic pump
Room well 2 is connected to by water inlet pipe 5 with glass-fiber reinforced plastic grille well 6;The glass reinforced plastic pump house well 2 includes well bore, glass reinforced plastic bottom plate 14
With glass fibre reinforced plastic manhole covers 9, the well bore is spliced by glass reinforced plastic pit shaft 15, glass reinforced plastic pit shaft 16, about 17 glass reinforced plastic pit shaft.
It is equipped with glass reinforced plastic bottom plate 14 in the bottom of well bore, is stamped glass fibre reinforced plastic manhole covers 9 on the top of well bore.Draining is equipped in the bottom of well bore
Pump 7, draining pump 7 are connect with water outlet standpipe 12, are equipped with water outlet pressure solenoid 1, water outlet pressure in 17 avris of upper wellbore section glass reinforced plastic pit shaft
Solenoid 1 is connect by valve 11 with water outlet standpipe 12.17 outer ring of upper wellbore section glass reinforced plastic pit shaft is equipped with concrete anti-floating counterweight 8,
It is equipped with ladder 19 in well bore, is equipped with operating platform 18 in upper wellbore section, is set in concrete anti-floating counterweight 8 and distribution box is installed
10, concrete sealing bottom 13 has been done in 14 lower part of glass reinforced plastic bottom plate.
The water outlet standpipe 12 and valve 11 is set to inside well bore or outside well bore.The glass reinforced plastic pit shaft is open caisson
Formula pit shaft.
A kind of construction method of the glass reinforced plastic open caisson modularization pumping plant of rapid construction of the present invention is:The factorial production
Glass reinforced plastic pit shaft 15, glass reinforced plastic pit shaft 16, glass reinforced plastic pit shaft 17 complete to be assembled into well bore at the construction field (site), will using drop shaft sinking
Well bore sinks to designed elevation, installs glass reinforced plastic bottom plate 14 again after concrete sealing bottom 13 is completed in well bore bottom;Concrete anti-floating is matched
Weighing the construction that 8 are installed on well bore upper section should complete before concrete sealing bottom 13;Draining pump 7 is installed after concrete sealing bottom 13, is gone out
Hydraulic pressure solenoid 1, water outlet standpipe 12, valve 11, ladder 19, operating platform 18, glass fibre reinforced plastic manhole covers 9, distribution box 10, are thus completed
The construction at single small-scale glass reinforced plastic pump house well pump station.Then multiple glass reinforced plastic pump house wells are passed through into sparge pipe as needed
3 are connected on glass reinforced plastic distribution well 4, then are connect by water inlet pipe 5 with glass-fiber reinforced plastic grille well 6, form a larger pump
It stands.
Sequence of construction of the invention is:First segment glass reinforced plastic pit shaft 15 is placed in predetermined position after smooth location, is cut the earth
Sink, the second section pit shaft 16 is installed after sinking to certain position, is connected (with rubber ring), after insertion again between pit shaft using socket joint
It is fixed with bolt and pit shaft is linked to be entirety, next section pit shaft 17 is installed in sinking of then cutting the earth again again, until well-sinking to design
Absolute altitude.Then it constructs concrete anti-floating counterweight 9 (prefabricated counterweight can also be used), concrete sealing bottom 13 of constructing after maintenance, if ground
The good concrete sealing bottom of matter condition can be changed to sand-gravel cushion, be underwater bottom concrete if features as poor geologic condition concrete sealing bottom,
Then glass reinforced plastic bottom plate 14 and sparge pipe 3 are installed, internal unit and glass well lid 9 etc. are finally installed.If it is scale to be built
Biggish combination pumping plant, then glass reinforced plastic pump house well 2, glass reinforced plastic distribution well 4, glass-fiber reinforced plastic grille well 6 can construct together or successively apply
Work is connected finally by pipeline.
Claims (4)
1. a kind of glass reinforced plastic open caisson modularization pumping plant of rapid construction, including glass reinforced plastic pump house well, it is characterised in that the glass
Glass steel pump house well is connected to by sparge pipe with glass reinforced plastic distribution well, and the glass reinforced plastic pump house well passes through water inlet pipe and glass reinforced plastic lattice
The connection of grid well;The glass reinforced plastic pump house well includes well bore, glass reinforced plastic bottom plate and glass fibre reinforced plastic manhole covers, and the well bore is by least two
Section glass reinforced plastic pit shaft is spliced up and down, is equipped with glass reinforced plastic bottom plate in the bottom of well bore, is stamped glass fiber reinforced plastic well on the top of well bore
Lid is equipped with draining pump in the bottom of well bore, and draining pump is connect with water outlet standpipe, is equipped in upper wellbore section glass reinforced plastic pit shaft avris
Hydraulic pressure solenoid, water outlet pressure solenoid are connect by valve with water outlet standpipe, and upper wellbore section glass reinforced plastic pit shaft outer ring is equipped with agent on crack resistance of concrete
Floating counterweight, is equipped with ladder in well bore, is equipped with operating platform in upper wellbore section, sets in concrete anti-floating counterweight and be equipped with distribution
Case has done concrete sealing bottom in glass reinforced plastic bottom plate lower part.
2. a kind of glass reinforced plastic open caisson modularization pumping plant of rapid construction according to claim 1, it is characterised in that described
It is discharged standpipe and valve is set to inside well bore or outside well bore.
3. a kind of glass reinforced plastic open caisson modularization pumping plant of rapid construction according to claim 1, it is characterised in that described
Glass reinforced plastic pit shaft is sinking type pit shaft.
4. a kind of construction method of the glass reinforced plastic open caisson modularization pumping plant of rapid construction according to claim 1, feature
It is that the construction method is:The glass reinforced plastic pit shaft of the factorial production is completed to be assembled into well bore at the construction field (site), using open caisson
Well bore is sunk to designed elevation by method, installs glass reinforced plastic bottom plate again after concrete sealing bottom is completed in well bore bottom;Concrete anti-floating is matched
The construction re-mounted in well bore upper section should be completed before concrete sealing bottom;Draining pump, discharge pressure are installed after concrete sealing bottom
Pipe, water outlet standpipe, valve, ladder, operating platform, well lid, distribution box, this completes single small-scale glass reinforced plastic pump houses
The construction at well pump station;Then multiple glass reinforced plastic pump house wells are connected on glass reinforced plastic distribution well by sparge pipe as needed, then
It is connect by water inlet pipe with glass-fiber reinforced plastic grille well, forms a larger pumping plant.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810655135.XA CN108842904A (en) | 2018-06-23 | 2018-06-23 | A kind of the glass reinforced plastic open caisson modularization pumping plant and its construction method of rapid construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810655135.XA CN108842904A (en) | 2018-06-23 | 2018-06-23 | A kind of the glass reinforced plastic open caisson modularization pumping plant and its construction method of rapid construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108842904A true CN108842904A (en) | 2018-11-20 |
Family
ID=64203188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810655135.XA Withdrawn CN108842904A (en) | 2018-06-23 | 2018-06-23 | A kind of the glass reinforced plastic open caisson modularization pumping plant and its construction method of rapid construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108842904A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109778998A (en) * | 2019-01-30 | 2019-05-21 | 宁波越兴建设工程有限公司 | A kind of prefabricated segmented pumping plant |
RU2759609C1 (en) * | 2020-09-11 | 2021-11-16 | Андрей Александрович Шипилов | Node of water supply facilities of block-modular type |
-
2018
- 2018-06-23 CN CN201810655135.XA patent/CN108842904A/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109778998A (en) * | 2019-01-30 | 2019-05-21 | 宁波越兴建设工程有限公司 | A kind of prefabricated segmented pumping plant |
RU2759609C1 (en) * | 2020-09-11 | 2021-11-16 | Андрей Александрович Шипилов | Node of water supply facilities of block-modular type |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107938692B (en) | Drainage and recharging construction method and structure | |
CN103046565B (en) | Draining method for ultra-deep batholith deep foundation pit | |
CN109736340B (en) | Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab | |
CN106013086A (en) | Construction method for processing underground continuous wall joint through boss type I-steel joint box | |
CN105089145A (en) | Glass reinforced plastic open caisson modularization pump station capable of being quickly constructed and construction method thereof | |
CN108842904A (en) | A kind of the glass reinforced plastic open caisson modularization pumping plant and its construction method of rapid construction | |
CN103967015B (en) | A kind of water seal for deep foundation pit excavation method and structure thereof | |
CN103882889A (en) | Bottom plate waterproofing system of foundation of building | |
CN203049630U (en) | Building foundation slab waterproof system | |
CN113175005B (en) | Anti-floating design and construction method for waterproof bottom plate of underground garage in rainstorm period | |
KR100935518B1 (en) | Groundwater well-sealed top protector unit with protective canister made of synthetic resin | |
CN108149775A (en) | A kind of prefabricated Boosting pumping station of PE and its mounting process | |
CN106958240B (en) | Air cushion type layered vacuum pipe well and soft foundation drainage method using same | |
KR20070044839A (en) | Construction work method of a sewers conduit compound foundation and that structure | |
US10941537B2 (en) | Prefabricated former for constructing underground chamber | |
CN204849713U (en) | Simple and easy distribution structure | |
CN110080216A (en) | A kind of water storage system and its construction method using supporting tubular pole | |
CN105714771A (en) | Construction method for manual hole digging pile | |
CN107023061B (en) | Assembled plastic municipal drainage inspection well and construction method | |
CN205116379U (en) | Glass steel open caisson modularization pump station of quick construction | |
CN214143998U (en) | Sewage collecting pipe network arrangement structure for households along river | |
CN213267959U (en) | Foundation pit bottom drainage integrated system completed after underground water level rises | |
CN112343164B (en) | Construction process for communicating pipeline with water tank body | |
KR100841525B1 (en) | Drain pipe junction type manhole | |
CN217896571U (en) | Water delivery pressure pipeline exhaust valve well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |