CN205074706U CN201520818042.6U CN201520818042U CN205074706U CN 205074706 U CN205074706 U CN 205074706U CN 201520818042 U CN201520818042 U CN 201520818042U CN 205074706 U CN205074706 U CN 205074706U
Authority
CN
China
Prior art keywords
sliding
backplate
pair
pipeline
gate framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520818042.6U
Other languages
Chinese (zh)
Inventor
郭祥
张钦杰
王春旭
张高尉
王后伟
王民东
左丰建
徐大才
陈文娅
吕尊启
陆景平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd, Offshore Oil Engineering Qingdao Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201520818042.6U priority Critical patent/CN205074706U/en
Application granted granted Critical
Publication of CN205074706U publication Critical patent/CN205074706U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model provides a can install instrument of pipeline backplate fast, includes: the upper portion anchor clamps that can reciprocate in the frame are installed to a frame, the lower part anchor clamps of pin joint bottom the frame, and wherein, two connectors are installed to the bottom of frame, and the both sides arm of frame constitutes first sliding pair, the lower part anchor clamps are equipped with: a rotatory floorbar, rotatory floorbar both ends are fixed in the bottom of frame, and a pair of first splint are installed relatively at the middle part of rotatory floorbar, install first arc clamp plate on the first splint, the upper portion anchor clamps are equipped with: a sliding beam, a pair of second splint are installed relatively at sliding beam's middle part, install second arc clamp plate on the second splint, and a slip baffle is respectively installed at sliding beam's both ends to form the second sliding pair, when jack during to the push -down, first sliding pair forms the friction with the second sliding pair and slides, and messenger's backplate is tightly laminated on the pipeline. The utility model discloses not only solve the loaded down with trivial details problem of construction steps, moreover, make pipeline and backplate carry out seamless, guaranteed construction quality.

Description

Can the instrument of Fast Installation pipeline backplate
Technical field
The utility model relates to erecting tools, particularly relate to a kind of can the instrument of Fast Installation pipeline backplate.Belong to building industry, steel construction, pipeline engineering field.
Background technology
In the work progress of building industry, steel construction, pipeline engineering, in order to prevent pipeline to be out of shape, usually, on pipeline during installation accessories, all on pipeline, weld backplate.Due to existing backplate be all adopt guide chain or strap colligation to press after install again, then, slower fastening backplate step by step, make backplate identical with pipeline.But the mode of this kind of fastening backplate, is difficult to the seamless connection accomplishing pipeline and backplate; And due to its step comparatively loaded down with trivial details, be difficult to ensure construction quality.
Utility model content
Main purpose of the present utility model is the above-mentioned shortcoming overcoming prior art existence, and provide a kind of can the instrument of Fast Installation pipeline backplate, it can not only greatly reduce construction procedure, operation is made to become more simple and convenient, solve the problem that construction procedure is loaded down with trivial details, and, pipeline and backplate can also be made to carry out seamless connection, ensure that construction quality; Meanwhile, place to use is not limit, and service line material is not limit.
The purpose of this utility model is realized by following technical scheme:
A kind of can the instrument of Fast Installation pipeline backplate, it is characterized in that: comprising: a gate framework, be articulated in the lower clamp of gate base of frame, be arranged on the upper clamp that can move up and down in gate framework, wherein, the bottom of gate framework is separately installed with two connectors; And the two side arms of gate framework forms the first sliding pair; Lower clamp is provided with: one rotates bottom girder, and rotate the bottom that bottom girder two ends are separately fixed at gate framework, the both sides, middle part rotating bottom girder have been mounted opposite a pair first clamping plate, the first clamping plate are provided with the first arc pressuring plate; Upper clamp is provided with: a sliding beam, the both sides, middle part of sliding beam have been mounted opposite a pair second clamping plate, second clamping plate are provided with the second arc pressuring plate, the two ends of sliding beam are separately installed with a sliding guide, and form the second sliding pair, when jack produces downward thrust, the first sliding pair and the second sliding pair form Frictional Slipping, and backplate is tightly fitted on pipeline.
The bottom of described gate framework is separately installed with two connectors, and the upper top of gate framework is provided with a jack top board, and the two ends rotating bottom girder are separately fixed on two connectors.
The cambered surface of described first arc pressuring plate towards the inner side of gate framework, the cambered surface of the second arc pressuring plate towards with the first arc pressuring plate towards relative.
The top of described sliding beam is provided with a jack base.
The beneficial effects of the utility model: the utility model is owing to adopting technique scheme, it can not only greatly reduce construction procedure, operation is made to become more simple and convenient, solve the problem that construction procedure is loaded down with trivial details, and, pipeline and backplate can also be made to carry out seamless connection, ensure that construction quality; Meanwhile, place to use is not limit, and service line material is not limit.
Accompanying drawing explanation
Fig. 1 is the utility model perspective view.
Fig. 2 A is the utility model gate framework enlarged diagram.
Fig. 2 B is the utility model connector enlarged diagram.
Fig. 2 C is the utility model sliding beam enlarged diagram.
Fig. 2 D is the utility model lower clamp enlarged diagram.
Major label description in figure:
1. gate framework, 2. sliding beam, 3. rotation bottom girder, 4. lower clamp, 5. upper clamp, 6. jack base, 7. jack top board, 8. bolt, 11. connectors, 21. sliding guides, 41. arc pressuring plates.
Detailed description of the invention
As shown in Fig. 1,2A, 2B, 2C, 2D, the utility model comprises: gate framework 1, employing axis hole connected mode are articulated in the lower clamp 4 bottom gate framework 1, be arranged on the upper clamp 5 that can move up and down in framework 1, wherein, gate framework 1 adopts seamless steel pipe to be welded, and the bottom of gate framework 1 adopts welding manner to be separately installed with two connectors 11; And the two side arms of gate framework 1 forms the first sliding pair; Lower clamp 4 is provided with: one rotates bottom girder 3, rotates the bottom that bottom girder 3 two ends are separately fixed at gate framework 1, and now, rotating bottom girder 3 can rotate freely; The both sides, middle part rotating bottom girder 3 adopt bolt 8 connected mode to be mounted opposite a pair first clamping plate, the first clamping plate are provided with arc pressuring plate 41, and for operationally applying pressure to pipeline backplate, the cambered surface of arc pressuring plate 41 is towards the inner side of gate framework 1; Upper clamp 5 is provided with: a sliding beam 2, the both sides, middle part of sliding beam 2 adopt bolt 8 connected mode to be mounted opposite a pair second clamping plate, second clamping plate are installed the second arc pressuring plate, wherein, the cambered surface of the second arc pressuring plate towards with arc pressuring plate 41 towards relative; The two ends of sliding beam 2 adopt welding manner to be separately installed with a sliding guide 21, and forming the second sliding pair, sliding guide 21 plays slide-and-guide effect, when jack produces downward thrust, first sliding pair and the second sliding pair form Frictional Slipping, and backplate is tightly fitted on pipeline.
The bottom of above-mentioned gate framework 1 is separately installed with two connectors 11, and the upper top of gate framework 1 is provided with jack top board 7, and the two ends rotating bottom girder 3 are fixed on two connectors 11 respectively by straight pin 9.
The top of above-mentioned sliding beam 2 adopts welding manner to be provided with a jack base 6.
Operation principle of the present utility model:
First, backplate to be installed is placed on the position of pipeline needs, rotation bottom girder 3 of the present utility model is opened, makes gate framework 1 the latter half be set to pipeline backplate place, then rotation bottom girder 3 is closed, pull sliding beam 2 downwards until touch pipeline backplate; Again jack is placed on jack base 6, makes jack be elongated to jack top board 7, utilize jack to produce downward thrust, backplate is tightly fitted on pipeline, thus reach backplate and pipeline seamless connection; Then, by operating personnel several solder joints of backplate spot welding be close on pipeline, with fixing backplate; Then, then unclamp jack, open and rotate bottom girder 3, take off the utility model, backplate installation.
Lower clamp 4 of the present utility model and upper clamp 5 have Multiple Type, can install be applicable to model according to actual line size.
The above, it is only preferred embodiment of the present utility model, not any pro forma restriction is done to the utility model, every above embodiment is done according to technical spirit of the present utility model any simple modification, equivalent variations and modification, all still belong in the scope of technical solutions of the utility model.

Claims (4)

1. one kind can the instrument of Fast Installation pipeline backplate, it is characterized in that: comprising: a gate framework, be articulated in the lower clamp of gate base of frame, be arranged on the upper clamp that can move up and down in gate framework, wherein, the bottom of gate framework is separately installed with two connectors; And the two side arms of gate framework forms the first sliding pair; Lower clamp is provided with: one rotates bottom girder, and rotate the bottom that bottom girder two ends are separately fixed at gate framework, the both sides, middle part rotating bottom girder have been mounted opposite a pair first clamping plate, the first clamping plate are provided with the first arc pressuring plate; Upper clamp is provided with: a sliding beam, the both sides, middle part of sliding beam have been mounted opposite a pair second clamping plate, second clamping plate are provided with the second arc pressuring plate, the two ends of sliding beam are separately installed with a sliding guide, and form the second sliding pair, when jack produces downward thrust, the first sliding pair and the second sliding pair form Frictional Slipping, and backplate is tightly fitted on pipeline.
2. according to claim 1 can the instrument of Fast Installation pipeline backplate, it is characterized in that: the bottom of described gate framework is separately installed with two connectors, the upper top of gate framework is provided with a jack top board, and the two ends rotating bottom girder are separately fixed on two connectors.
3. according to claim 1 can the instrument of Fast Installation pipeline backplate, it is characterized in that: the cambered surface of described first arc pressuring plate towards the inner side of gate framework, the cambered surface of the second arc pressuring plate towards with the first arc pressuring plate towards relative.
4. according to claim 1 can the instrument of Fast Installation pipeline backplate, it is characterized in that: the top of described sliding beam is provided with a jack base.
CN201520818042.6U 2015-10-21 2015-10-21 Can install instrument of pipeline backplate fast Expired - Fee Related CN205074706U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520818042.6U CN205074706U (en) 2015-10-21 2015-10-21 Can install instrument of pipeline backplate fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520818042.6U CN205074706U (en) 2015-10-21 2015-10-21 Can install instrument of pipeline backplate fast

Publications (1)

Publication Number Publication Date
CN205074706U true CN205074706U (en) 2016-03-09

Family

ID=55427144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520818042.6U Expired - Fee Related CN205074706U (en) 2015-10-21 2015-10-21 Can install instrument of pipeline backplate fast

Country Status (1)

Country Link
CN (1) CN205074706U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114346502A (en) * 2021-10-29 2022-04-15 国网河南省电力公司中牟县供电公司 Construction method of transformer substation tubular bus port construction positioning device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114346502A (en) * 2021-10-29 2022-04-15 国网河南省电力公司中牟县供电公司 Construction method of transformer substation tubular bus port construction positioning device

Similar Documents

Publication Publication Date Title
CN105215612A (en) A kind of electric locomotive eight axle bogie framework welding tool setup
CN201960313U (en) Pipe welding fixing device
WO2012083638A1 (en) Fixture supporting plate, forward assembly welding fixture and method for welding arc sectional material
CN203541928U (en) Positioning clamp and placing boom welding fixture
CN203209852U (en) Stirring friction welding tool for longitudinal joint of cylinder section
CN202934308U (en) Aluminum magnesium alloy pipeline welding device
CN205074706U (en) Can install instrument of pipeline backplate fast
CN102699609A (en) Rotary tool for welding skirt board grating of rail vehicle
CN209424851U (en) A kind of tubing welding positioning tool
CN203125028U (en) Two-sided clamping fixture
CN104827162B (en) elbow welding method
CN111745760B (en) Double-sided plate binding equipment
CN203221312U (en) Container oil cylinder upper bracket assembling, welding and positioning device
CN101590579B (en) Clamping device for rail butt welding
CN202428153U (en) Manipulator type pipeline hoisting aligning device
CN204094305U (en) High ferro rail three mould end templates
CN205290127U (en) Steel sheet leveling device of boats and ships assembly usefulness
CN205309664U (en) Fire control cantilever crane axle sleeve rivet welding frock
CN203395431U (en) Rapid pipe clamp
CN211162693U (en) Alignment positioning fixture for welding processing
CN210360020U (en) Aluminum alloy friction welding device
CN205520204U (en) Welding jig of butt -joint machine
CN203356944U (en) Hydraulic steel tube high-pressure weld joint butt joint device
CN203034612U (en) Butt joint structure of pipe truss or circular pipe pillar
CN206241102U (en) A kind of automatic delivering mechanism for fin tube expansion

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee after: OFFSHORE OIL ENGINEERING (QINGDAO) Co.,Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee before: OFFSHORE OIL ENGINEERING (QINGDAO) Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160309

CF01 Termination of patent right due to non-payment of annual fee