CN201960313U CN2011200628775U CN201120062877U CN201960313U CN 201960313 U CN201960313 U CN 201960313U CN 2011200628775 U CN2011200628775 U CN 2011200628775U CN 201120062877 U CN201120062877 U CN 201120062877U CN 201960313 U CN201960313 U CN 201960313U
Authority
CN
China
Prior art keywords
arc tube
pipe
back slab
corbel back
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200628775U
Other languages
Chinese (zh)
Inventor
文昌玉
王克俭
陈绍云
于跃云
范春娇
杨家林
翁乙友
吕戈
刘宗祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN2011200628775U priority Critical patent/CN201960313U/en
Application granted granted Critical
Publication of CN201960313U publication Critical patent/CN201960313U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

Pipe welding fixing device is used in butt welding of pipe to pipe to ensure that the pipeline will not be misplaced in welding. The top half of the arc pipe and the bottom half of the arc pipe butt form a round pipe. A top dormer is open in the wall of the top half of the arc pipe, and a bottom dormer is open in the wall of the bottom half of the arc pipe. A top leading panel is welded on the outer wall of the edge of the top half of the arc pipe, and a bottom leading panel is welded on the outer wall of the edge of the bottom half of the arc pipe. The top and bottom leading panels are rectangular iron panels. A top bolt hole is arranged at the top leading panel, and a bottom hole is arranged at the bottom leading panel. The top leading panel is opposed to the bottom leading panel. Bolts are fixed in the top and bottom bolt holes. The effect is that both ends of the pipes are opposed to each other, caught in the pipe welding fixture. Ends of the pipes will be welded opposed to each other accurately, and dislocation of pipe welding is limited within an allowable area to improve the welding quality.

Description

The pipeline welding fixture
Technical field
The utility model relates to oil-gas field surface engineering construction technique field, and pipeline butt joint welding in particularly a kind of surface duct work progress is a kind of pipeline welding fixture that can not influence welding quality when guaranteeing pipeline welding because of dislocation.
Background technology
At present, surface duct welding general employing mechanical hoisting or artificial lifting are the pipe ends alignment of needs welding.Because pipeline quality is very big, when butt joint, be difficult to move, be difficult to guarantee that butt joint is neat, when welding the docking port dislocation bigger, influence welding quality, cause pipeline to destroy too early, influence ordinary production, even may jeopardize personal safety.For the error that reduces to produce in the welding process, design a kind of device and the pipeline at docking port two ends is fixed on just seems necessary in the qualified error range by force.
The utility model content
The purpose of this utility model is: a kind of pipeline welding fixture is provided, and soldered pipe ends is relative, be clipped in the pipeline welding fixture, and adjust the screw spacing, the dislocation of pipeline docking site is reduced gradually until reaching meet welding requirements.
The technical solution adopted in the utility model is: the pipeline welding fixture, mainly form by first arc tube, last corbel back slab, upper bolt hole, second arc tube, following bolt hole, following corbel back slab and bolt, it is characterized in that: first arc tube is relative with second arc tube to become a round tube, have the skylight on the wall of first arc tube, on the wall of second arc tube, having skylight down; On the edge of first arc tube outer wall, be welded with corbel back slab, on the edge of second arc tube outer wall, be welded with corbel back slab down.Last corbel back slab and following corbel back slab are rectangle iron plates; On last corbel back slab upper bolt hole is arranged, on the corbel back slab following bolt hole is being arranged down, last corbel back slab is relative with following corbel back slab, is fixed with bolt in upper bolt hole and following bolt hole.Can be fixed on two pipe ends of needs welding in the pipeline welding fixture.Bolt on then, adjust the error at two pipe joint places gradually, till satisfying welding requirements.Two last skylight of aligning, place and following skylights that pipe end need weld.By last skylight and following skylight pipeline is welded.Unclamp screw rotating pipe weld fixture apparatus, and then bolt on, do not have the position of welding to weld by last skylight and following skylight to pipeline, until finishing pipeline welding.
For first arc tube and second arc tube are linked together, in an opposite end of first arc tube and second arc tube bearing pin is arranged, bearing pin links together an opposite end of first arc tube and second arc tube.First arc tube 1 can relatively rotate by bearing pin with second arc tube like this, realizes that first arc tube and second arc tube open or close.
After described first arc tube was relative with second arc tube, its internal diameter was identical with soldered outer diameter tube.First arc tube and second arc tube adopt carbon steel or stainless steel to make.
The beneficial effects of the utility model: the utility model pipeline welding fixture, soldered pipe ends is relative, be clipped in the pipeline welding fixture.The pipeline welding end is accurately relative, and pipeline welding position offset error limits in allowed limits, can improve welding quality.
Description of drawings
Fig. 1 is the utility model pipeline welding fixture open mode structural representation.
Fig. 2 is the utility model pipeline welding fixture closed condition structural representation.
Among the figure, first arc tube of 1-, the last skylight of 2-, the last corbel back slab of 3-, 4-upper bolt hole, second arc tube of 5-, bolt hole under the 6-, corbel back slab under the 7-, skylight under the 8-, 9-bearing pin.
The specific embodiment
Embodiment 1: be applicable to that with one external diameter is that the pipeline welding fixture of the pipeline butt welding of 500mm is an example, is described in further detail the utility model.
Consult Fig. 1.The utility model pipeline welding fixture is made up of first arc tube 1, last corbel back slab 3, upper bolt hole 4, second arc tube 5, following bolt hole 6, following corbel back slab 7, bearing pin 9 and bolt.First arc tube 1 and second arc tube 5 be relative round tube that to become an internal diameter be 500mm, length is 1000mm.Having a length on the wall of first arc tube 1 is 500mm, and arc length is the last skylight 2 of 500mm, and opening one on the wall of second arc tube 5, length is arranged is 500mm, and arc length is the following skylight 8 of 500mm.
On an edge outer wall of first arc tube 1, be welded with corbel back slab 3, on an edge outer wall of second arc tube 5, be welded with corbel back slab 7 down.Last corbel back slab 3 and following corbel back slab 7 are rectangle iron plates; Two upper bolt holes 4 are arranged on last corbel back slab 3, down on the corbel back slab 7 two following bolts hole 6 are being arranged, last corbel back slab 3 is relative with following corbel back slab 7, is fixed with bolt in upper bolt hole 4 and following bolt hole 6.
There is a bearing pin 9 another opposite end at first arc tube 1 and second arc tube 5, and bearing pin 9 links together an opposite end of first arc tube 1 and second arc tube 5.
First arc tube 1 and second arc tube 5 adopt carbon steel to make.

Claims (2)

1. pipeline welding fixture, mainly form by first arc tube (1), last corbel back slab (3), upper bolt hole (4), second arc tube (5), following bolt hole (6), following corbel back slab (7) and bolt, it is characterized in that: first arc tube (1) is relative with second arc tube (5) to become a round tube, on the wall of first arc tube (1), have skylight (2), on the wall of second arc tube (5), have skylight (8) down; On the edge of first arc tube 1 outer wall, be welded with corbel back slab (3), on the edge outer wall of second arc tube (5), be welded with corbel back slab (7) down; Last corbel back slab (3) and following corbel back slab (7) are rectangle iron plates; Upper bolt hole (4) is arranged on last corbel back slab (3), on the corbel back slab (7) following bolt hole (6) is being arranged down, last corbel back slab (3) is relative with following corbel back slab (7), is fixed with bolt in upper bolt hole (4) and following bolt hole (6).
2. pipeline welding fixture according to claim 1, it is characterized in that: there is bearing pin (9) opposite end at first arc tube (1) and second arc tube (5), and bearing pin (9) links together an opposite end of first arc tube (1) and second arc tube (5).
CN2011200628775U 2011-03-10 2011-03-10 Pipe welding fixing device Expired - Lifetime CN201960313U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200628775U CN201960313U (en) 2011-03-10 2011-03-10 Pipe welding fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200628775U CN201960313U (en) 2011-03-10 2011-03-10 Pipe welding fixing device

Publications (1)

Publication Number Publication Date
CN201960313U true CN201960313U (en) 2011-09-07

Family

ID=44522840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200628775U Expired - Lifetime CN201960313U (en) 2011-03-10 2011-03-10 Pipe welding fixing device

Country Status (1)

Country Link
CN (1) CN201960313U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102380774A (en) * 2011-09-21 2012-03-21 无锡市创新化工设备有限公司 Hole-cutting fixture for outer tube of cryostat
GB2504671A (en) * 2012-08-03 2014-02-12 Bae Systems Plc Alignment device, and method of alignment using an alignment device
CN103639642A (en) * 2013-12-05 2014-03-19 攀钢集团工程技术有限公司 Pipeline outer opening aligning device and pipeline grouping welding method
CN104723012A (en) * 2015-03-23 2015-06-24 上海外高桥造船海洋工程有限公司 Welding tool
CN104942139A (en) * 2015-06-08 2015-09-30 浙江大大不锈钢有限公司 Steel tube shaping mold
CN107553053A (en) * 2017-09-20 2018-01-09 重庆市璧山区强顺机械有限公司 Accessory alignment splashproof technique
CN107598472A (en) * 2017-09-20 2018-01-19 重庆市璧山区强顺机械有限公司 A kind of accessory welder
CN109794722A (en) * 2019-03-27 2019-05-24 中国二十二冶集团有限公司 Steel-pipe welding swage and its welding method
CN109955025A (en) * 2019-04-28 2019-07-02 中国一冶集团有限公司 A kind of pipeline welding apparatus for correcting

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102380774A (en) * 2011-09-21 2012-03-21 无锡市创新化工设备有限公司 Hole-cutting fixture for outer tube of cryostat
CN102380774B (en) * 2011-09-21 2016-03-30 无锡市创新化工设备有限公司 The perforate frock of cryostat outer tube
GB2504671A (en) * 2012-08-03 2014-02-12 Bae Systems Plc Alignment device, and method of alignment using an alignment device
US9556983B2 (en) 2012-08-03 2017-01-31 Bae Systems Plc Alignment device, and method of alignment using an alignment device
CN103639642B (en) * 2013-12-05 2016-10-12 攀钢集团工程技术有限公司 The outer contra-aperture device of pipeline and the construction method of tube group butt welding
CN103639642A (en) * 2013-12-05 2014-03-19 攀钢集团工程技术有限公司 Pipeline outer opening aligning device and pipeline grouping welding method
CN104723012A (en) * 2015-03-23 2015-06-24 上海外高桥造船海洋工程有限公司 Welding tool
CN104723012B (en) * 2015-03-23 2017-03-22 上海外高桥造船海洋工程有限公司 Welding tool
CN104942139A (en) * 2015-06-08 2015-09-30 浙江大大不锈钢有限公司 Steel tube shaping mold
CN107553053A (en) * 2017-09-20 2018-01-09 重庆市璧山区强顺机械有限公司 Accessory alignment splashproof technique
CN107598472A (en) * 2017-09-20 2018-01-19 重庆市璧山区强顺机械有限公司 A kind of accessory welder
CN107553053B (en) * 2017-09-20 2019-01-01 重庆市璧山区强顺机械有限公司 Accessory is aligned splashproof technique
CN109794722A (en) * 2019-03-27 2019-05-24 中国二十二冶集团有限公司 Steel-pipe welding swage and its welding method
CN109955025A (en) * 2019-04-28 2019-07-02 中国一冶集团有限公司 A kind of pipeline welding apparatus for correcting
CN109955025B (en) * 2019-04-28 2021-05-18 中国一冶集团有限公司 Pipeline welding orthotic devices

Similar Documents

Publication Publication Date Title
CN201960313U (en) Pipe welding fixing device
CN104607766A (en) Welding device capable of double-side automatic welding for pipe and flange
CN202430895U (en) Docked H-shaped steel girder with groove type reinforcing plates
CN205600219U (en) Light -duty pipeline is to mouthpart based on large pipe welding
CN203765238U (en) Petroleum pipeline welding device
CN109590665A (en) The assembly method of double-joint pipe
CN204954268U (en) A organize device for pipeline and flange
CN203712181U (en) Mouth aligning device for small pipeline welding
CN203343689U (en) Special clamp and welding system applied to pipeline assembly welding
CN211965496U (en) Pipeline bending platform for concentrated solution system installation
CN206800657U (en) A kind of connecting plate being used between prefabricated wallboard
CN206702011U (en) A kind of multi-functional indent support of adjustable steel pipe diameter
CN206538761U (en) A kind of prefabricated tubular pile quickly positions docking facilities
CN212226198U (en) Pipeline combination seam adjustment alignment instrument
CN210677595U (en) Pipeline concentricity adjusting device and butt joint pipeline
CN205309618U (en) Outside preheating device is used in pipeline welding
CN207419798U (en) It is a kind of building variable cross-section hyperboloid aluminum facade with steel structure connection mechanism
CN201073751Y (en) Novel pipeline aligning device
CN208262206U (en) It is a kind of prefabricated group of flange to tooling
CN112705898A (en) Pipeline butt joint position adjusting device and using method thereof
CN205955204U (en) Template piece fixture
CN205074706U (en) Can install instrument of pipeline backplate fast
CN205309686U (en) Portable adjustable pipe joint platform - nest of tubes is to installing the system
CN110303290A (en) A kind of special fixture welded for BOSS
CN215091766U (en) Welding support convenient to adjust for pipeline welding

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20110907

CX01 Expiry of patent term