CN205063444U - Flood discharge runner in power station overhauls platform - Google Patents

Flood discharge runner in power station overhauls platform Download PDF

Info

Publication number
CN205063444U
CN205063444U CN201520841206.7U CN201520841206U CN205063444U CN 205063444 U CN205063444 U CN 205063444U CN 201520841206 U CN201520841206 U CN 201520841206U CN 205063444 U CN205063444 U CN 205063444U
Authority
CN
China
Prior art keywords
underframe
periproct
prosthomere
hoist engine
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520841206.7U
Other languages
Chinese (zh)
Inventor
万刚
朱全平
许功华
杨进
张易
姚宜斌
刘林广
屈大功
钟洪星
杨林振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Yangtze Power Co Ltd
Original Assignee
China Yangtze Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Yangtze Power Co Ltd filed Critical China Yangtze Power Co Ltd
Priority to CN201520841206.7U priority Critical patent/CN205063444U/en
Application granted granted Critical
Publication of CN205063444U publication Critical patent/CN205063444U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)

Abstract

The utility model discloses a flood discharge runner in power station overhauls platform, fixed mounting has preceding hoist engine on the prosthomere chassis, and the return pulley is installed respectively in prosthomere chassis bottom four corners, the head of intermediate junction chassis is fixed continuous through a screwed flange board with the afterbody of prosthomere chassis, the head of periproct chassis is fixed continuous by no. Two screwed flange boards with the afterbody of intermediate junction chassis, fixed mounting has back hoist engine on the periproct chassis, and the return pulley is installed respectively in periproct chassis bottom four corners, intermediate junction chassis bottom four corners is the mounting plate lead screw respectively, intermediate junction chassis end bottom installation return pulley. Through using this runner to overhaul the platform, can reduce the work load of being under construction by to a great extent, to use manpower sparingly, protection runner bottom plate is not destroyed, and the method of setting up moreover is simple, and convenient operation has improved the security of overhauing the platform.

Description

A kind of power station flood discharge runner inspection platform
Technical field
The utility model relates to hydraulic structure construction equipment, is especially restricted and the larger power station flood discharge runner inspection platform of the gradient in lifting condition.
Background technology
During the maintenance of power station flood discharge runner, the restriction due to the restriction and construction environment that are subject to execution conditions needs to set up inspection platform thus carries out the upkeep operation of flood discharge runner.At present, usually adopt scaffolding steel pipe to set up full hall scaffold method at whole runner and carry out runner upkeep operation.
Adopt said method to carry out overhauling the defect that there is the following aspects: (1) needs to consume a large amount of man power and material owing to setting up scaffold, and along with the increase of flow channel length, engineering quantity can increase further, can cause the increase of construction cost; (2) owing to adopting the method to need implant reinforcing bar and then be fixed scaffold on flood discharge runner base plate, reinforcing bar is removed again like this after construction completes, hole will be left on base plate, and then certain brokenly to change is produced to the quality of runner base plate, affect follow-up normal flood discharge; (3) adopt the scaffold set up to construct, owing to setting up quality problems, certain potential safety hazard may be produced to follow-up construction; (4) scaffold is mobile inconvenient in work progress, and then affects construction speed.
Therefore, based on the flood discharge runner inspection platform that above-mentioned analysis needs development and Design new, thus it is facilitated to construct.
Utility model content
The purpose of this utility model is exactly for above-mentioned technical problem; a kind of power station flood discharge runner inspection platform is provided; this runner inspection platform can reduce the workload of construction to a great extent; save manpower; protection runner base plate is not destroyed; and erection method is simple, easy to operate, improve the safety of inspection platform.
In order to realize above-mentioned technical characteristic, the purpose of this utility model is achieved in that a kind of power station flood discharge runner inspection platform, and it comprises prosthomere underframe, middle connects underframe, periproct underframe, front hoist engine, rear hoist engine, side direction screw mandrel, return pulley, pressure switch, base plate screw mandrel, side directive wheel, scaffold, fixed pulley, a screwed flange plate, No. two screwed flange plates, bamboo springboard and No. two pressure switches; Described prosthomere underframe is installed with front hoist engine, and bottom prosthomere underframe, corner is separately installed with return pulley; In the middle of described, the connection head of underframe and the afterbody of prosthomere underframe are fixedly linked by a screwed flange plate; The afterbody that head and the centre of described periproct underframe are connected underframe is fixedly linked by No. two screwed flange plates; Described periproct underframe is installed with rear hoist engine, and bottom periproct underframe, return pulley is installed respectively in corner; Connect corner mounting base screw mandrel respectively bottom underframe in the middle of described, middle connection bottom underframe end installs return pulley; Described prosthomere underframe, middle connection on underframe and periproct underframe are provided with scaffold; Fixed pulley is installed at described scaffold top; Described scaffold is provided with bamboo springboard.
The return pulley of described prosthomere underframe head is provided with a pressure switch; A described pressure switch is connected with front hoist engine by cable.
The return pulley of described periproct underframe afterbody is provided with No. two pressure switches; Described No. two pressure switches are connected with rear hoist engine by cable.
The head both sides of described prosthomere underframe and the two sides of tail of periproct underframe are all symmetrically installed with side direction screw mandrel and side directive wheel.
Described front hoist engine comprises drive motors, and the output shaft of drive motors is connected with reducer, and the output shaft of reducer is connected with reel.
The utility model has following beneficial effect:
1, by adopting split type prosthomere underframe, middle connection underframe and the bottom of periproct underframe to inspection platform to assemble respectively, thus underframe larger for quality is lifted into highly higher flood discharge runner by method respectively that facilitate employing segmentation, then complete the assembling of inspection platform in flood discharge runner inside, reduce hoisting difficulty and assembling difficulty to a great extent.
2, on prosthomere underframe and periproct underframe, an elevator motor is installed by adopting respectively, ensure that inspection platform is in flood discharge runner internal operation process, drive with two elevator motors simultaneously, ensure that the safety and reliability of movement, effectively prevent the contingent danger of toppling of inspection platform.
3, pass through in the head of prosthomere underframe and the two sides of tail face of periproct underframe, side direction screw mandrel is set respectively and side directive wheel can make inspection platform when operation, make on the whole sidewall being fixed on flood discharge runner of inspection platform by turning side direction screw mandrel, play the effect of fixing inspection platform, improve the safety of construction, the effect of guiding can be played by side directive wheel, inspection platform is contacted with sidewall in moving process, ensure that smooth and easy in moving process of inspection platform.
4, by installing a pressure switch and No. two pressure sensors on return pulley, and be connected with two elevator motors respectively, thus the tilt phenomenon that inspection platform occurs can be detected timely and accept energy imbalance, when detecting that imbalance can stop corresponding elevator motor to brake timely, thus improve the safety of construction.
5, above-mentioned inspection platform can carry out dismounting and assembling easily, thus can reuse in the maintenance process of multiple flood discharge runner, saves the amount of labour of putting up platform, reduces labour intensity, shorten construction period.
6, this inspection platform set up the polycrystalline substance not needing brokenly to change original flood discharge runner, ensure that the integrality of original runner, improve construction quality.
7, this inspection platform conveniently moving is reliable, the whole maintenance process of the longer flood discharge runner of length can be completed smoothly, avoid the defect that traditional segmented sets up scaffold, further improve efficiency of construction and working security, and it is simple to operate, artificial control automatically can also be realized.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Fig. 1 is the front view of the utility model structure principle chart.
Fig. 2 is the lateral view of the utility model structure principle chart.
Fig. 3 is the top view of the utility model structure principle chart.
Fig. 4 is the utility model structure elevator electric machine structure schematic diagram.
In figure: prosthomere underframe 1, middle connection underframe 2, periproct underframe 3, front hoist engine 4, rear hoist engine 5, side direction screw mandrel 6, return pulley 7, pressure switch 8, base plate screw mandrel 9, side directive wheel 10, scaffold 11, fixed pulley 12, screwed flange plate 13, No. two screwed flange plates 14, bamboo springboard 15, No. two pressure switches 16, reel 401, reducer 402, drive motors 403.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiment of the present utility model is described further.
As Figure 1-4, a kind of power station flood discharge runner inspection platform, it comprises prosthomere underframe 1, middle connection underframe 2, periproct underframe 3, front hoist engine 4, rear hoist engine 5, side direction screw mandrel 6, return pulley 7, pressure switch 8, base plate screw mandrel 9, side directive wheel 10, scaffold 11, fixed pulley 12, screwed flange plate 13, No. two screwed flange plates 14, bamboo springboard 15 and No. two pressure switches 16; Described prosthomere underframe 1 is installed with front hoist engine 4, and bottom prosthomere underframe 1, corner is separately installed with return pulley 7; In the middle of described, the connection head of underframe 2 and the afterbody of prosthomere underframe 1 are fixedly linked by a screwed flange plate 13; The afterbody that head and the centre of described periproct underframe 3 are connected underframe 2 is fixedly linked by No. two screwed flange plates 14; Described periproct underframe 3 is installed with rear hoist engine 5, and bottom periproct underframe 3, corner installs return pulley 7 respectively; Connect corner mounting base screw mandrel 9 respectively bottom underframe 2 in the middle of described, middle connection bottom underframe 2 end installs return pulley 7; Described prosthomere underframe 1, middle connection on underframe 2 and periproct underframe 3 are provided with scaffold 11; Fixed pulley 12 is installed at described scaffold 11 top; Described scaffold 11 is provided with bamboo springboard 15.
Preferably, the return pulley 7 of described prosthomere underframe 1 head is provided with a pressure switch 8; A described pressure switch 8 is connected with front hoist engine 4 by cable.Can detect by a pressure switch 8 pressure that prosthomere underframe 1 bears, after its pressure exceedes certain value, just illustrate that inspection platform there occurs inclination, now a pressure switch 8 will stop front hoist engine 4 automatically, make it out of service, keep stable, thus ensure its safety.
Preferably, the return pulley 7 of described periproct underframe 3 afterbody is provided with No. two pressure switches 16; Described No. two pressure switches 16 are connected with rear hoist engine 5 by cable.Can detect by No. two pressure switches 16 pressure that periproct underframe 3 bears, after its pressure exceedes certain value, just illustrate that inspection platform there occurs inclination, now No. two pressure switches 16 will stop rear hoist engine 5 automatically, make it out of service, keep stable, thus ensure its safety.
Further, by between a pressure switch 8 and No. two pressure switches 16 with the use of the stationarity of inspection platform in operation process and stability can be ensured, prevent the danger of toppling.
Preferably, the head both sides of described prosthomere underframe 1 and the two sides of tail of periproct underframe 3 are all symmetrically installed with side direction screw mandrel 6 and side directive wheel 10.Can inspection platform entirety be fixed on the inwall of flood discharge runner 17 by side direction screw mandrel 6, inspection platform can be facilitated in the movement of flood discharge runner 17 inside by side directive wheel 10.
Preferably, described front hoist engine 4 comprises drive motors 403, and the output shaft of drive motors 403 is connected with reducer 402, and the output shaft of reducer 402 is connected with reel 401.The speed of elevator motor 4 can be regulated by said structure, thus ensure different construction requirements.
Further, in order to improve the stability of scaffold 11, adopt truss structure.Adopt trussed construction can improve its stability.
Above-described embodiment is used for explaining and the utility model is described; instead of the utility model is limited; in the protection domain of spirit of the present utility model and claim, to the novel any amendment made of this practical machine and change, all fall into protection domain of the present utility model.

Claims (5)

1. a power station flood discharge runner inspection platform, is characterized in that: it comprises prosthomere underframe (1), middle connects underframe (2), periproct underframe (3), front hoist engine (4), rear hoist engine (5), side direction screw mandrel (6), return pulley (7), pressure switch (8), base plate screw mandrel (9), side directive wheel (10), scaffold (11), fixed pulley (12), a screwed flange plate (13), No. two screwed flange plates (14), bamboo springboard (15) and No. two pressure switches (16); Described prosthomere underframe (1) is installed with front hoist engine (4), and corner, prosthomere underframe (1) bottom is separately installed with return pulley (7); The afterbody of the head and prosthomere underframe (1) that connect underframe (2) in the middle of described passes through a screwed flange plate (13) and is fixedly linked; The head of described periproct underframe (3) is fixedly linked by No. two screwed flange plates (14) with the middle afterbody being connected underframe (2); Described periproct underframe (3) is installed with rear hoist engine (5), and corner, periproct underframe (3) bottom installs return pulley (7) respectively; Connect corner, underframe (2) bottom mounting base screw mandrel (9) respectively in the middle of described, middle connection bottom underframe (2) end installs return pulley (7); Described prosthomere underframe (1), middle connection on underframe (2) and periproct underframe (3) are provided with scaffold (11); Fixed pulley (12) is installed at described scaffold (11) top; Described scaffold (11) is provided with bamboo springboard (15).
2. a kind of power station flood discharge runner inspection platform according to claim 1, is characterized in that: the return pulley (7) of described prosthomere underframe (1) head is provided with a pressure switch (8); A described pressure switch (8) is connected with front hoist engine (4) by cable.
3. a kind of power station flood discharge runner inspection platform according to claim 1, is characterized in that: the return pulley (7) of described periproct underframe (3) afterbody is provided with No. two pressure switches (16); Described No. two pressure switches (16) are connected with rear hoist engine (5) by cable.
4. a kind of power station flood discharge runner inspection platform according to claim 1, is characterized in that: the head both sides of described prosthomere underframe (1) and the two sides of tail of periproct underframe (3) are all symmetrically installed with side direction screw mandrel (6) and side directive wheel (10).
5. a kind of power station flood discharge runner inspection platform according to claim 1, it is characterized in that: described front hoist engine (4) comprises drive motors (403), the output shaft of drive motors (403) is connected with reducer (402), and the output shaft of reducer (402) is connected with reel (401).
CN201520841206.7U 2015-10-28 2015-10-28 Flood discharge runner in power station overhauls platform Expired - Fee Related CN205063444U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520841206.7U CN205063444U (en) 2015-10-28 2015-10-28 Flood discharge runner in power station overhauls platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520841206.7U CN205063444U (en) 2015-10-28 2015-10-28 Flood discharge runner in power station overhauls platform

Publications (1)

Publication Number Publication Date
CN205063444U true CN205063444U (en) 2016-03-02

Family

ID=55390018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520841206.7U Expired - Fee Related CN205063444U (en) 2015-10-28 2015-10-28 Flood discharge runner in power station overhauls platform

Country Status (1)

Country Link
CN (1) CN205063444U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220911A (en) * 2015-10-28 2016-01-06 中国长江电力股份有限公司 A kind of power station flood discharge runner inspection platform and erection method thereof
CN108560510A (en) * 2018-07-13 2018-09-21 江苏龙安电力设备有限公司 Surface low road movable overhaul platform in a kind of power station

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220911A (en) * 2015-10-28 2016-01-06 中国长江电力股份有限公司 A kind of power station flood discharge runner inspection platform and erection method thereof
CN108560510A (en) * 2018-07-13 2018-09-21 江苏龙安电力设备有限公司 Surface low road movable overhaul platform in a kind of power station
CN108560510B (en) * 2018-07-13 2024-05-31 江苏龙安电力设备有限公司 Movable overhaul platform for surface runner of hydropower station

Similar Documents

Publication Publication Date Title
CN101880006B (en) Roll-on device and method for large fixed type rotary crane
CN109487912A (en) A kind of construction method of super-span truss-string-structure
CN204112696U (en) For the electric hoist elevator shaft platform of main building construction
CN204024676U (en) A kind of novel tunnel concrete steel form carrier
CN106245919A (en) A kind of assembled architecture Automated assembly platform
CN202400745U (en) Trusswork portal crane
CN205063444U (en) Flood discharge runner in power station overhauls platform
CN202450762U (en) Construction lifting platform
CN210858744U (en) Tunnel lining trolley template
CN204418013U (en) Bridge flange plate is constructed self-propelled cantilever hanging basket
CN105220911A (en) A kind of power station flood discharge runner inspection platform and erection method thereof
CN103243932A (en) Structure for detaching inner climbing tower crane through roof crane and construction method thereof
CN103669882A (en) Method for conducting component installation with steel wire ropes serving as rails in industrial factory building
CN208950195U (en) Assembled light steel structure stairway
CN205257792U (en) Bridge crane with triangular support girder
CN208329569U (en) Attachment type raise scaffold
CN203653072U (en) Household garbage grab bucket crane
CN205602927U (en) Integral type hauler and leading wheel fixing device
CN205046848U (en) Gate -type steel sheet mould holder
CN212866926U (en) Movable supporting beam dismounting device
CN210393502U (en) Bridge deck crane for mounting steel box girder for bridge
CN204492173U (en) Elevator shaft integral lifting template operation platform
CN208965999U (en) A kind of packaged type lighting roof operating platform
CN208870427U (en) A kind of people's air defense doorframe support replacement bracing means
CN202644416U (en) A simple lifting device for dismounting a bailey beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160302

Termination date: 20191028

CF01 Termination of patent right due to non-payment of annual fee