CN205059105U - Back towing pintle fixed structure - Google Patents

Back towing pintle fixed structure Download PDF

Info

Publication number
CN205059105U
CN205059105U CN201520809362.5U CN201520809362U CN205059105U CN 205059105 U CN205059105 U CN 205059105U CN 201520809362 U CN201520809362 U CN 201520809362U CN 205059105 U CN205059105 U CN 205059105U
Authority
CN
China
Prior art keywords
sleeve pipe
floor beam
towing hook
longitudinal floor
shrouding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520809362.5U
Other languages
Chinese (zh)
Inventor
刘峰
Original Assignee
Anhui Jianghuai Automobile Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jianghuai Automobile Group Corp filed Critical Anhui Jianghuai Automobile Group Corp
Priority to CN201520809362.5U priority Critical patent/CN205059105U/en
Application granted granted Critical
Publication of CN205059105U publication Critical patent/CN205059105U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Body Structure For Vehicles (AREA)

Abstract

The utility model provides a back towing pintle fixed structure, include: fixed plate, towing pintle sleeve pipe after -fixing board, longitudinal floor beam shrouding before back longitudinal floor beam, towing pintle sleeve pipe, the towing pintle sleeve pipe, back longitudinal floor beam is the bathtub construction, back longitudinal floor beam shrouding has first via hole, the fixed plate has the U -shaped groove before the towing pintle sleeve pipe, towing pintle sleeve pipe after -fixing board has second via hole and kink, weld respectively at the fixed plate both ends before the towing pintle sleeve pipe back longitudinal floor beam shrouding towing pintle sleeve pipe after -fixing board, the towing pintle sleeve pipe passes first via hole the U -shaped groove with behind the second via hole with back longitudinal floor beam shrouding towing pintle sleeve pipe after -fixing board welded connection, the preceding fixed plate of towing pintle sleeve pipe the welding of towing pintle sleeve pipe after -fixing board is in back longitudinal floor beam's below, just back longitudinal floor beam shrouding part at least is used for sealing back longitudinal floor beam's groove. The utility model discloses convenient just can the avoiding of welding produces the restriction to back fog lamp molding.

Description

Towing hook fixed sturcture after a kind of
Technical field
The utility model relates to vehicle traction field of components, is specifically related to a kind of rear towing hook fixed sturcture.
Background technology
Current most of automobile is when design vehicle rear portion towing hook cover pipe fixation structure, all automobile rear towing hook cover pipe fixation structure is designed in the inner chamber of rear longitudinal floor beam rear portion, to be connect in the full encirclement structure of formation by weldering mode by adopting towing hook sleeve pipe adapter plate and rear longitudinal floor beam brace panel and rear longitudinal floor beam shrouding and be fixed, the form that this kind of structure design does not only conflict with automobile rear moulding for rear towing hook layout area, if because of automobile rear moulding restriction, then towing hook is overlapped pipe fixation structure and design in rear longitudinal floor beam cavity inside version just no longer applicable.
As shown in Figure 1, rear longitudinal floor beam 2 is bathtub construction to the rear towing hook fixed sturcture of prior art, and rear longitudinal floor beam shrouding 4 is for closing the end of rear longitudinal floor beam 2, and rear dragging rhampotheca pipe 1 stretches in the groove 3 of rear longitudinal floor beam 2 through after rear longitudinal floor beam shrouding 4.Then, towing hook sleeve pipe adapter plate 5 and rear longitudinal floor beam brace panel 6 are welded in groove 3 and form a closed chamber, are enclosed in groove 3 by towing hook sleeve pipe 1.
The shortcoming of prior art is, first this kind of fixed form is restricted to the moulding of fog lamp below automobile rear, after fog lamp moulding is determined, if there is interference, then needs towing hook to be fixed on other position; Secondly in groove 3, welding operation inconvenience is completed.
Utility model content
The purpose of this utility model is to provide a kind ofly can avoid the moulding of automobile rear fog lamp to limit and easy to operate rear towing hook fixed sturcture.
For achieving the above object, embodiment of the present utility model provides following technical scheme:
Towing hook fixed sturcture after a kind of, comprise: rear longitudinal floor beam, towing hook sleeve pipe, towing hook sleeve pipe front shoe, towing hook sleeve pipe rear fixed plate, longitudinal floor beam shrouding, described rear longitudinal floor beam is bathtub construction, described rear longitudinal floor beam shrouding has the first via hole, described towing hook sleeve pipe front shoe has U-lag, described towing hook sleeve pipe rear fixed plate has the second via hole and kink, described rear longitudinal floor beam shrouding is welded at described towing hook sleeve pipe front shoe two ends respectively, described towing hook sleeve pipe rear fixed plate, described towing hook sleeve pipe is through described first via hole, with described rear longitudinal floor beam shrouding after described U-lag and described second via hole, described towing hook sleeve pipe rear fixed plate is welded to connect, described towing hook sleeve pipe front shoe, described towing hook sleeve pipe rear fixed plate welds the below of longitudinal floor beam in the rear, and described rear longitudinal floor beam shrouding is at least partly for closing the groove of described rear longitudinal floor beam.
Preferably, described towing hook sleeve pipe front shoe two ends have the first binding face and the second binding face respectively, the described rear longitudinal floor beam shrouding of described first binding face laminating, and described second binding face is fitted the 3rd binding face of described towing hook sleeve pipe rear fixed plate.
Preferably, the area of described first binding face is less than the area of described rear longitudinal floor beam shrouding, and the area of described second binding face equals the area of described 3rd binding face.
Preferably, described kink is flute profile.
Preferably, the both sides of described U-lag have the extension of fitting with described rear longitudinal floor beam.
Preferably, described rear longitudinal floor beam shrouding has multiple installation via hole.
Embodiment of the present utility model utilize towing hook sleeve pipe front shoe, towing hook sleeve pipe rear fixed plate towing hook sleeve pipe is fixed on rear longitudinal floor beam below but not in groove, first this avoid the restriction to fog tail lamp, secondly weld nugget can all be positioned at outside groove, convenient operation.
Accompanying drawing explanation
Fig. 1 is the block diagram of the rear towing hook fixed sturcture of prior art;
Fig. 2 is the block diagram of the floor floor side member of embodiment of the present utility model;
Fig. 3 is the block diagram of the towing hook sleeve pipe front shoe of embodiment of the present utility model;
Fig. 4 is the block diagram of the floor floor side member shrouding of embodiment of the present utility model;
Fig. 5 is the block diagram of the towing hook sleeve pipe rear fixed plate of embodiment of the present utility model;
Fig. 6 is the block diagram of the towing hook sleeve pipe of embodiment of the present utility model;
Fig. 7 is the block diagram of the rear towing hook fixed sturcture of embodiment of the present utility model.
Description of symbols in figure: 1, towing hook sleeve pipe, 2, rear longitudinal floor beam, 3, groove, 4, rear longitudinal floor beam shrouding, 5, towing hook sleeve pipe adapter plate, 6, rear longitudinal floor beam brace panel, 7, rear longitudinal floor beam, 8, groove, 9, towing hook sleeve pipe front shoe, 10, U-lag, the 11, first binding face, 12, the second binding face, 13, extension, 14, rear longitudinal floor beam shrouding, the 15, first via hole, 16, via hole is installed, 17, towing hook sleeve pipe rear fixed plate, the 18, second via hole, 19, kink, 20, the 3rd binding face, 21, towing hook sleeve pipe.
Detailed description of the invention
With reference to figure 2, the rear longitudinal floor beam 7 in the present embodiment is for having the bathtub construction of groove 8.
With reference to figure 3, the towing hook sleeve pipe front shoe 9 in the present embodiment has U-lag 10, and the both sides of U-lag 10 continue upwards to extend to form two extensions 13.Towing hook sleeve pipe front shoe 9 two ends have the first binding face 11 and the second binding face 12 respectively.
With reference to figure 4, the rear longitudinal floor beam shrouding 14 in the present embodiment has the first via hole 15, also has multiple installation via hole 16.
With reference to figure 5, the towing hook sleeve pipe rear fixed plate in the present embodiment has the second via hole 18, kink 19 and the 3rd binding face 20.Kink 19 is also flute profile.
With reference to figure 6, towing hook sleeve pipe 21 is a tube-like piece, for installing rear towing hook.
With reference to figure 7, in the assembling process of the rear towing hook fixed sturcture of the present embodiment, first, by spot welding by welded together to towing hook sleeve pipe front shoe 9, rear longitudinal floor beam shrouding 14, towing hook sleeve pipe rear fixed plate 17, particularly, towing hook sleeve pipe front shoe 9 two ends weld rear longitudinal floor beam shrouding 14, towing hook sleeve pipe rear fixed plate 17 respectively, and after the first binding face 11 is fitted, longitudinal floor beam shrouding 14, second binding face 12 is fitted the 3rd binding face 20.Then; towing hook sleeve pipe 21 is through after the second via hole 18 of the first via hole 15 of rear longitudinal floor beam shrouding 14, the U-lag 10 of towing hook front shoe 9 and towing hook rear fixed plate 17; towing hook sleeve pipe 21 and rear longitudinal floor beam shrouding 14, towing hook sleeve pipe rear fixed plate 17 are welded to connect in via hole cooperation place, the position carbon-dioxide arc welding of towing hook sleeve pipe 21 with the U-lag 10 of towing hook sleeve pipe front shoe 9 is welded.Like this, towing hook sleeve pipe 21, rear longitudinal floor beam shrouding 14, towing hook sleeve pipe front shoe 9 and towing hook sleeve pipe rear fixed plate 17 form a little assembly.Finally, above-mentioned little assembly is welded to the below of rear longitudinal floor beam 7, makes towing hook sleeve pipe front shoe 9, below that towing hook sleeve pipe rear fixed plate 17 is positioned at rear longitudinal floor beam 7 but not groove 8, and rear longitudinal floor beam shrouding 14 close at least partly after the groove 8 of longitudinal floor beam 7.Visible, whole welding operation without the need to carrying out in groove 8, easy to operate, and fixing rear dragging rhampotheca pipe 21 is positioned at the below of rear longitudinal floor beam 7, without the need to considering fog tail lamp moulding.
Be also shown in from Fig. 7, the area of the first binding face 11 is less than the area of rear longitudinal floor beam shrouding 14, and the area of the second binding face 12 equals the area of the 3rd binding face 20, position can with larger area damped vibration in the wings to make towing hook sleeve pipe 21 like this, and in front owing to need not consider to there is vibration stronger Joint strenght and lighter weight near car body.After having welded, the kink 19 of flute profile, extension 13 are all fitted in the below of rear longitudinal floor beam 7, improve Joint strenght.
Although the utility model is described in conjunction with above embodiment, but the utility model is not defined to above-described embodiment, and only by the restriction of claim, those of ordinary skill in the art can easily modify to it and change, but do not leave essential idea of the present utility model and scope.

Claims (6)

1. towing hook fixed sturcture after a kind, it is characterized in that, comprise: rear longitudinal floor beam, towing hook sleeve pipe, towing hook sleeve pipe front shoe, towing hook sleeve pipe rear fixed plate, longitudinal floor beam shrouding, described rear longitudinal floor beam is bathtub construction, described rear longitudinal floor beam shrouding has the first via hole, described towing hook sleeve pipe front shoe has U-lag, described towing hook sleeve pipe rear fixed plate has the second via hole and kink, described rear longitudinal floor beam shrouding is welded at described towing hook sleeve pipe front shoe two ends respectively, described towing hook sleeve pipe rear fixed plate, described towing hook sleeve pipe is through described first via hole, with described rear longitudinal floor beam shrouding after described U-lag and described second via hole, described towing hook sleeve pipe rear fixed plate is welded to connect, described towing hook sleeve pipe front shoe, described towing hook sleeve pipe rear fixed plate welds the below of longitudinal floor beam in the rear, and described rear longitudinal floor beam shrouding is at least partly for closing the groove of described rear longitudinal floor beam.
2. rear towing hook fixed sturcture according to claim 1, it is characterized in that, described towing hook sleeve pipe front shoe two ends have the first binding face and the second binding face respectively, the described rear longitudinal floor beam shrouding of described first binding face laminating, described second binding face is fitted the 3rd binding face of described towing hook sleeve pipe rear fixed plate.
3. rear towing hook fixed sturcture according to claim 2, is characterized in that, the area of described first binding face is less than the area of described rear longitudinal floor beam shrouding, and the area of described second binding face equals the area of described 3rd binding face.
4. rear towing hook fixed sturcture according to claim 1, is characterized in that, described kink is flute profile.
5. rear towing hook fixed sturcture according to claim 1, is characterized in that, the both sides of described U-lag have the extension of fitting with described rear longitudinal floor beam.
6. rear towing hook fixed sturcture according to claim 1, is characterized in that, described rear longitudinal floor beam shrouding has multiple installation via hole.
CN201520809362.5U 2015-10-15 2015-10-15 Back towing pintle fixed structure Expired - Fee Related CN205059105U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520809362.5U CN205059105U (en) 2015-10-15 2015-10-15 Back towing pintle fixed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520809362.5U CN205059105U (en) 2015-10-15 2015-10-15 Back towing pintle fixed structure

Publications (1)

Publication Number Publication Date
CN205059105U true CN205059105U (en) 2016-03-02

Family

ID=55385701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520809362.5U Expired - Fee Related CN205059105U (en) 2015-10-15 2015-10-15 Back towing pintle fixed structure

Country Status (1)

Country Link
CN (1) CN205059105U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111434497A (en) * 2019-01-15 2020-07-21 华北电力大学 Non-bearing type cross-country vehicle towing hook structure
CN114633802A (en) * 2022-03-25 2022-06-17 东风汽车集团股份有限公司 Longitudinal beam set of vehicle frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111434497A (en) * 2019-01-15 2020-07-21 华北电力大学 Non-bearing type cross-country vehicle towing hook structure
CN114633802A (en) * 2022-03-25 2022-06-17 东风汽车集团股份有限公司 Longitudinal beam set of vehicle frame

Similar Documents

Publication Publication Date Title
CN103569209B (en) The structure of body tail
CN106741183B (en) Automobile rear sub-frame installs point structure
JP2009126197A (en) Rear structure of vehicle body
CN205059105U (en) Back towing pintle fixed structure
KR20040080370A (en) Joint structure of vehicle front interior and joint method thereof
CN203920556U (en) A kind of automobile fog light support
CN208827940U (en) Rear secondary frame for vehicle
CN205523514U (en) Connection structure of automobile rear wheel cover bumper shock absorber mount pad
CN204279627U (en) A kind of full frame fore sub frame connection structure
KR100667685B1 (en) Tail gate hinge mounting port means of vehicle
CN208978585U (en) A kind of automobile rear torsion beam
CN103625231B (en) A kind of swing arm mounting structure
CN205345058U (en) Vapour car roof rear frame member welding assembly
CN206537379U (en) The overlap joint step and automobile on floor before and after a kind of automobile
CN103213467B (en) Automobile front under controlling arm back bush support damping device
CN204488932U (en) An a kind of novel crossbeam
CN205098314U (en) Integral type reinforcing plate structure of car centre gangway
CN204775496U (en) Additional strengthening of car A post
CN211391475U (en) Split type automobile side flow guiding cover
CN204526696U (en) Automobile rear trailing arm installation system
CN201610178U (en) Connecting structure of through-type rear floor middle crossbeam with arc-shaped notch
CN202782550U (en) Rear axle structure of torsion beam
CN203410275U (en) Automobile front door frame structure
CN204136991U (en) A kind of cab door mount structure
CN204998625U (en) Enclose skeleton and apron assembly behind car

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 230601 Anhui Province, Hefei City Industrial Park, the Peach Blossom Road No. 669

Patentee after: Anhui Jianghuai Automobile Group Limited by Share Ltd

Address before: 230601 Anhui Province, Hefei City Industrial Park, the Peach Blossom Road No. 669

Patentee before: Anhui Jianghuai Automobile Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160302

Termination date: 20191015

CF01 Termination of patent right due to non-payment of annual fee