CN205046588U - 一种海上风机导管架基础水下封堵式灌浆连接结构 - Google Patents
一种海上风机导管架基础水下封堵式灌浆连接结构 Download PDFInfo
- Publication number
- CN205046588U CN205046588U CN201520692035.6U CN201520692035U CN205046588U CN 205046588 U CN205046588 U CN 205046588U CN 201520692035 U CN201520692035 U CN 201520692035U CN 205046588 U CN205046588 U CN 205046588U
- Authority
- CN
- China
- Prior art keywords
- pipe pile
- steel pipe
- grout
- grouting
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011440 grout Substances 0.000 title claims abstract description 29
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 63
- 239000010959 steel Substances 0.000 claims abstract description 63
- 239000008267 milk Substances 0.000 claims abstract description 7
- 210000004080 milk Anatomy 0.000 claims abstract description 7
- 235000013336 milk Nutrition 0.000 claims abstract description 7
- 238000009434 installation Methods 0.000 claims abstract description 6
- 238000003780 insertion Methods 0.000 claims description 5
- 230000037431 insertion Effects 0.000 claims description 5
- 239000002002 slurry Substances 0.000 claims description 5
- 239000007788 liquid Substances 0.000 abstract 2
- 238000012856 packing Methods 0.000 abstract 1
- 239000004576 sand Substances 0.000 abstract 1
- 239000000945 filler Substances 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/0008—Methods for grouting offshore structures; apparatus therefor
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
本实用新型公开了一种海上风机导管架基础水下封堵式灌浆连接结构,所述导管架基础的桩腿分别插装入固定于海床上的钢管桩内,其插入的部位采用灌浆固定,进而在钢管桩内形成有一段灌浆段;且在安装导管架基础前,即将导管架基础的桩腿插入钢管桩前,所述钢管桩内填充有沙袋和砂石这些填充料,用于灌浆操作时对浆料进行封堵,并确保填充后的填充料面与钢管桩顶端位置的高度差不超过灌浆段长度;所述钢管桩的外侧固定安装有带灌浆软管的灌浆管,该灌浆管的灌浆头伸进钢管桩内,用于对灌浆段进行灌浆。本专利结构不用安装价格高昂的封堵器,降低了基础建设成本,避免了导管架桩腿与钢管桩对中问题引起的灌浆漏浆问题。
Description
技术领域
本实用新型涉及海上风机导管架基础灌浆连接的技术领域,尤其是指一种海上风机导管架基础水下封堵式灌浆连接结构。
背景技术
在我国,海上风力发电是一个新兴的产业,2007年以后我国开始逐步发展海上风力发电产业,随着海上风机装机容量逐年增加,海上风电基础呈现多样化,其中,导管架基础作为海上风电基础形式之一,具有重量轻、地质适应性广、结构稳定等特点。
目前,导管架基础桩腿与钢管桩过渡段位置通常采用灌浆连接,导管架基础的安装通常需要先将钢管桩基础打入海底,再安装导管架并进行调平,最后对导管架与钢管桩过渡段位置进行灌浆。为保证灌浆段连接强度及不浪费浆料,通常在打桩前预先在钢管桩内安装封堵器,以便灌浆操作时对浆料进行封堵。封堵器为预先安装,由于制造、安装及施工误差难以保证导管架四条桩腿与钢管桩同时对中,在安装导管架时容易对封堵器局部损坏,造成封堵不严灌浆漏浆问题,且封堵器价格高昂,增加了基础建设成本。
发明内容
本实用新型的目的在于克服现有技术的不足,提供一种安全可靠、成本低、易操作的海上风机导管架基础水下封堵式灌浆连接结构。
为实现上述目的,本实用新型所提供的技术方案为:一种海上风机导管架基础水下封堵式灌浆连接结构,所述导管架基础的桩腿分别插装入固定于海床上的钢管桩内,其插入的部位采用灌浆固定,进而在钢管桩内形成有一段灌浆段;且在安装导管架基础前,即将导管架基础的桩腿插入钢管桩前,所述钢管桩内填充有沙袋和砂石这些填充料,用于灌浆操作时对浆料进行封堵,并确保填充后的填充料面与钢管桩顶端位置的高度差不超过灌浆段长度;所述钢管桩的外侧固定安装有带灌浆软管的灌浆钢管,该灌浆钢管的灌浆头伸进钢管桩内,用于对灌浆段进行灌浆。
所述桩腿通过其上的桩腿支撑限制其插入钢管桩内的深度,且插入后,该桩腿支撑的底板固定于钢管桩顶端,通过在底板和钢管桩顶端之间加垫锲块,能够实现导管架基础的调平。
所述灌浆钢管通过灌浆管支撑安装在钢管桩的外侧。
本实用新型与现有技术相比,具有如下优点与有益效果:
1、本专利提出的海上风机导管架基础水下封堵式灌浆连接结构不用安装价格高昂的封堵器,降低了基础建设成本,避免了导管架桩腿与钢管桩对中问题引起的灌浆漏浆问题。
2、本专利结构采用沙袋及砂石作为填充物,成本低,且易操作。
附图说明
图1为海上风机导管架基础与钢管桩的安装示意图。
图2为图1的A局部放大图。
具体实施方式
下面结合具体实施例对本实用新型作进一步说明。
如图1和图2所示,本实施例所述的海上风机导管架基础水下封堵式灌浆连接结构,其具体情况如下:
所述导管架基础1的桩腿101分别插装入固定于海床8上的钢管桩2内,其插入的部位采用灌浆固定,进而在钢管桩内形成有一段灌浆段;且在安装导管架基础1前,即将导管架基础1的桩腿101插入钢管桩2前,所述钢管桩2内填充有沙袋4和砂石3等填充料,用于灌浆操作时对浆料进行封堵,并确保填充后的填充料面与钢管桩顶端位置的高度差不超过灌浆段长度;此外,所述桩腿101是通过其上的桩腿支撑102限制其插入钢管桩2内的深度,且插入后,该桩腿支撑102的底板102-1固定于钢管桩顶端,通过在底板和钢管桩顶端之间加垫锲块,可以实现对导管架基础调平;另外,为了实现灌浆操作,所述钢管桩2的外侧固定安装有带灌浆软管5的灌浆钢管6,该灌浆钢管6是通过灌浆管支撑7安装在钢管桩2上,且其灌浆头伸进钢管桩2内,用于对灌浆段进行灌浆。
下面为上述海上风机导管架基础水下封堵式灌浆连接结构的具体施工过程,包括以下步骤:
1、将钢管桩2打入海底,固定于海床8上;
2、为保证灌浆段长度,抽出打入海底的钢管桩2内部的淤泥或泥沙,以使钢管桩2内的淤泥或泥沙面至钢管桩顶端位置的高度差大于要求的灌浆段长度,并为填充物预留空间;
3、将填充物倒入钢管桩内,先填充沙袋4,再填充砂石3,填充量根据冲刷后的钢管桩内泥面的位置确定,并确保填充后砂石面与钢管桩顶端位置的高度差不超过灌浆段长度;
4、安装导管架基础1,并对导管架基础1进行调平;
5、对灌浆段进行灌浆。
以上所述之实施例子只为本实用新型之较佳实施例,并非以此限制本实用新型的实施范围,故凡依本实用新型之形状、原理所作的变化,均应涵盖在本实用新型的保护范围内。
Claims (3)
1.一种海上风机导管架基础水下封堵式灌浆连接结构,其特征在于:所述导管架基础的桩腿分别插装入固定于海床上的钢管桩内,其插入的部位采用灌浆固定,进而在钢管桩内形成有一段灌浆段;且在安装导管架基础前,即将导管架基础的桩腿插入钢管桩前,所述钢管桩内填充有沙袋和砂石这些填充料,用于灌浆操作时对浆料进行封堵,并确保填充后的填充料面与钢管桩顶端位置的高度差不超过灌浆段长度;所述钢管桩的外侧固定安装有带灌浆软管的灌浆钢管,该灌浆钢管的灌浆头伸进钢管桩内,用于对灌浆段进行灌浆。
2.根据权利要求1所述的一种海上风机导管架基础水下封堵式灌浆连接结构,其特征在于:所述桩腿通过其上的桩腿支撑限制其插入钢管桩内的深度,且插入后,该桩腿支撑的底板固定于钢管桩顶端,通过在底板和钢管桩顶端之间加垫锲块,能够实现导管架基础的调平。
3.根据权利要求1所述的一种海上风机导管架基础水下封堵式灌浆连接结构,其特征在于:所述灌浆钢管通过灌浆管支撑安装在钢管桩的外侧。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520692035.6U CN205046588U (zh) | 2015-09-08 | 2015-09-08 | 一种海上风机导管架基础水下封堵式灌浆连接结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520692035.6U CN205046588U (zh) | 2015-09-08 | 2015-09-08 | 一种海上风机导管架基础水下封堵式灌浆连接结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205046588U true CN205046588U (zh) | 2016-02-24 |
Family
ID=55340185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520692035.6U Active CN205046588U (zh) | 2015-09-08 | 2015-09-08 | 一种海上风机导管架基础水下封堵式灌浆连接结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205046588U (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638582A (zh) * | 2017-02-15 | 2017-05-10 | 中交第二航务工程勘察设计院有限公司 | 一种嵌岩桩钢护筒的稳桩装置 |
CN108331007A (zh) * | 2018-05-17 | 2018-07-27 | 中能电力科技开发有限公司 | 一种用于海上风电大功率机组的基础结构及安装方法 |
CN108661031A (zh) * | 2018-05-07 | 2018-10-16 | 深圳海油工程水下技术有限公司 | 导管架飞溅区杆件损伤灌浆修复方法 |
CN109653207A (zh) * | 2018-11-07 | 2019-04-19 | 南通市海洋水建工程有限公司 | 一种海上升压站导管架结构与桩基础间的间隙灌浆工艺 |
EP3825469A1 (en) * | 2019-11-21 | 2021-05-26 | Illinois Tool Works Inc. | Grout applicator |
CN113356214A (zh) * | 2021-06-04 | 2021-09-07 | 中交第三航务工程局有限公司江苏分公司 | 一种海上风机导管架基础结构灌浆封底方法 |
CN114892722A (zh) * | 2022-05-19 | 2022-08-12 | 中铁大桥局集团第五工程有限公司 | 一种用于后桩法导管架连接段漏浆的封堵方法 |
CN115012379A (zh) * | 2022-06-16 | 2022-09-06 | 中国能源建设集团广东省电力设计研究院有限公司 | 一种海上换流站平台的自安装与加固方法 |
-
2015
- 2015-09-08 CN CN201520692035.6U patent/CN205046588U/zh active Active
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638582A (zh) * | 2017-02-15 | 2017-05-10 | 中交第二航务工程勘察设计院有限公司 | 一种嵌岩桩钢护筒的稳桩装置 |
CN106638582B (zh) * | 2017-02-15 | 2019-01-29 | 中交第二航务工程勘察设计院有限公司 | 一种嵌岩桩钢护筒的稳桩装置 |
CN108661031A (zh) * | 2018-05-07 | 2018-10-16 | 深圳海油工程水下技术有限公司 | 导管架飞溅区杆件损伤灌浆修复方法 |
CN108661031B (zh) * | 2018-05-07 | 2020-01-03 | 深圳海油工程水下技术有限公司 | 导管架飞溅区杆件损伤灌浆修复方法 |
CN108331007A (zh) * | 2018-05-17 | 2018-07-27 | 中能电力科技开发有限公司 | 一种用于海上风电大功率机组的基础结构及安装方法 |
CN109653207A (zh) * | 2018-11-07 | 2019-04-19 | 南通市海洋水建工程有限公司 | 一种海上升压站导管架结构与桩基础间的间隙灌浆工艺 |
EP3825469A1 (en) * | 2019-11-21 | 2021-05-26 | Illinois Tool Works Inc. | Grout applicator |
WO2022005951A1 (en) * | 2019-11-21 | 2022-01-06 | Illinois Tool Works Inc. | Grout applicator |
CN114867918A (zh) * | 2019-11-21 | 2022-08-05 | 伊利诺斯工具制品有限公司 | 灌浆方法 |
CN113356214A (zh) * | 2021-06-04 | 2021-09-07 | 中交第三航务工程局有限公司江苏分公司 | 一种海上风机导管架基础结构灌浆封底方法 |
CN114892722A (zh) * | 2022-05-19 | 2022-08-12 | 中铁大桥局集团第五工程有限公司 | 一种用于后桩法导管架连接段漏浆的封堵方法 |
CN115012379A (zh) * | 2022-06-16 | 2022-09-06 | 中国能源建设集团广东省电力设计研究院有限公司 | 一种海上换流站平台的自安装与加固方法 |
CN115012379B (zh) * | 2022-06-16 | 2024-04-19 | 中国能源建设集团广东省电力设计研究院有限公司 | 一种海上换流站平台的自安装与加固方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205046588U (zh) | 一种海上风机导管架基础水下封堵式灌浆连接结构 | |
CN205917727U (zh) | 一种植入式海上风机嵌岩单桩基础 | |
CN103233481B (zh) | 一种可灌浆连接的导管架支撑结构 | |
CN103526766A (zh) | 一种深基坑减压井封堵方法 | |
CN205917719U (zh) | 一种多桶负压桶式海上测风塔 | |
CN206036390U (zh) | 一种管道升降调平装置 | |
CN103276728A (zh) | 一种桩头修补及加固的方法 | |
CN104234064B (zh) | 一种桥梁桥墩围堰加固结构的施工方法 | |
CN113668582B (zh) | 一种可注浆式双壁承压降水管井装置及其施工方法 | |
CN104452785B (zh) | 一种拉森钢板桩围堰合拢施工方法 | |
CN204570712U (zh) | 悬浮钢围堰密封止水结构 | |
CN103669383B (zh) | 一种在海底地面上安装和调平沉箱的方法 | |
CN203855990U (zh) | 一种大降深管井封堵结构 | |
CN101705823B (zh) | 高压气地下储气井的延迟凝固固井方法 | |
CN202139590U (zh) | 一种自升式平台辅助冲桩装置 | |
CN103225311A (zh) | 用于海上风机导管架基础安装的固定调平结构 | |
CN106049520A (zh) | 海上支撑结构的混凝土基底和钢管桩之间的结合方法 | |
CN1166852C (zh) | 全断面掘进机的施工方法 | |
CN209066440U (zh) | 一种后桩法导管架水下灌浆管线系统 | |
CN204532377U (zh) | 一种盾构斜井管片壁后封堵环 | |
CN206512759U (zh) | 一种预埋可重复注浆管的地连墙g型接头 | |
CN202298594U (zh) | 一种土体压力测试仪器 | |
CN108457297A (zh) | 一种高压旋喷挡土墙修复方法 | |
CN205776259U (zh) | 一种深基坑挡土墙单侧模板施工装置 | |
RU2011136348A (ru) | Морская гравитационно-свайная платформа и способ постановки ее на морское дно |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170706 Address after: 300450, No. two, No. 526, building six, hi tech Road, Binhai hi tech Zone, Binhai 13888, Jin Han Road, Tianjin Patentee after: Tianjin Mingyang wind power equipment Co., Ltd. Address before: 528437 Guangdong torch hi tech Industrial Development Zone, Torch Road, No. 22, Ming Yang Industrial Park, Zhongshan Patentee before: Guangdong Mingyang Wind Power Group Co., Ltd. |
|
TR01 | Transfer of patent right |