CN205039743U - Photovoltaic erection equipment - Google Patents

Photovoltaic erection equipment Download PDF

Info

Publication number
CN205039743U
CN205039743U CN201520841506.5U CN201520841506U CN205039743U CN 205039743 U CN205039743 U CN 205039743U CN 201520841506 U CN201520841506 U CN 201520841506U CN 205039743 U CN205039743 U CN 205039743U
Authority
CN
China
Prior art keywords
photovoltaic
travel
support column
buoyancy tank
movable support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520841506.5U
Other languages
Chinese (zh)
Inventor
罗万友
范正峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Kundi Ground Foundation Engineering Co Ltd
Original Assignee
Anhui Kundi Ground Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Kundi Ground Foundation Engineering Co Ltd filed Critical Anhui Kundi Ground Foundation Engineering Co Ltd
Priority to CN201520841506.5U priority Critical patent/CN205039743U/en
Application granted granted Critical
Publication of CN205039743U publication Critical patent/CN205039743U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model relates to a photovoltaic erection equipment, including the flotation tank, be provided with the mounting bracket that is used for installing photovoltaic spare on the flotation tank, the mounting bracket is including founding the movable support alive that support column that the form arranged and support column upper end set up, and the movable support that lives constitutes to rotate along the vertical direction with the support column and is connected the cooperation, is provided with on the support column to carry out the locking Assembly that locks to movable support's alive rotation, and movable support alive is at two types, and the one of which is: the outside that the movable support that lives extended to the flotation tank is used for inserting the work position of carrying out the installation of photovoltaic spare between the adjacent stake, next does: the movable support that lives rotates and replys to the inboard avoid giving way of flotation tank. Among the above -mentioned technical scheme, during installation photovoltaic spare, the movable support that will live adjusts to the work position, after the installation of photovoltaic spare, adjusts the movable support that lives and dodges photovoltaic erection equipment's removal to avoid giving way, only needs the slip flotation tank to remove along stake interval direction to simplify photovoltaic erection equipment's paddling operation, improve the installation effectiveness.

Description

A kind of photovoltaic erection unit
Technical field
The utility model relates to photovoltaic erection unit field, is specifically related to a kind of photovoltaic erection unit.
Background technology
Photovoltaic waterborne needs to install photovoltaic part on pile after piling, and the installation of conventional photovoltaic part is deposited on common buoyancy tank by photovoltaic part, put under by buoyancy tank between two photovoltaic erection columns, be then mounted on pile by photovoltaic part by workman.There is following shortcoming in this mounting means: one, for after each pile installs, needs first to be marked by buoyancy tank and then put under between next two pile to be installed, the complicated operation of paddling buoyancy tank; It two is arranged on the top of pile for photovoltaic part, and therefore need to place poppet on buoyancy tank and install, the fail safe of operation is low, and in addition, photovoltaic panel is in skewed installation on pile, and conventional assembling operation is comparatively difficult to carry out.
Utility model content
The purpose of this utility model is just to provide a kind of photovoltaic erection unit, and it effectively can solve photovoltaic erection unit needs back and forth to put and mark the problem between pile under, improves the efficiency that photovoltaic part is installed.
For achieving the above object, the utility model have employed following technical scheme:
A kind of photovoltaic erection unit, it is characterized in that: comprise buoyancy tank, buoyancy tank is provided with the installing rack for installing photovoltaic part, installing rack comprises the support column of vertical shape layout and the travel(l)ing rest of support column upper end setting, travel(l)ing rest and support column form to be rotationally connected along vertical and coordinate, support column is provided with the latch assembly that the rotation of travel(l)ing rest is locked, travel(l)ing rest is in two states, and one is: travel(l)ing rest extends to the outside of buoyancy tank for inserting the working position carrying out the installation of photovoltaic part between adjacent pile; It two is: travel(l)ing rest rotates to return back to dodges position inside buoyancy tank.
In technique scheme, when photovoltaic part is installed, travel(l)ing rest is adjusted to working position, after photovoltaic part is installed and is terminated, travel(l)ing rest is regulated to dodge to dodging the movement of position to photovoltaic erection unit, only need slip buoyancy tank to move along pile spacing direction, thus simplify the paddling operation of photovoltaic erection unit, improve installation effectiveness.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model;
Fig. 2 is vertical view of the present utility model;
Fig. 3 is end view of the present utility model;
Fig. 4 is the structural representation of installing rack;
Fig. 5 is the schematic diagram that photovoltaic erection unit carries out the installation of photovoltaic part.
Embodiment
In order to make the purpose of this utility model and advantage clearly understand, below in conjunction with embodiment, the utility model is specifically described.Should be appreciated that following word only in order to describe one or more concrete execution modes of the present utility model, considered critical is not carried out to the protection range that the utility model is specifically asked.
The technical scheme that the utility model is taked is as Fig. 1, 2, 3, shown in 4, a kind of photovoltaic erection unit, comprise buoyancy tank 10, buoyancy tank 10 is provided with the installing rack 20 for installing photovoltaic part, installing rack 20 comprises the support column 21 of vertical shape layout and the travel(l)ing rest 22 of support column 21 upper end setting, travel(l)ing rest 22 and support column 21 form to be rotationally connected along vertical and coordinate, support column 21 is provided with the latch assembly that the rotation of travel(l)ing rest 22 is locked, travel(l)ing rest 22 is in two states, one is: travel(l)ing rest 22 extends to the outside of buoyancy tank 10 for inserting the working position carrying out the installation of photovoltaic part between adjacent pile 30, it two is: travel(l)ing rest 22 rotates to return back to dodges position inside buoyancy tank 10.In technique scheme, when photovoltaic part is installed, travel(l)ing rest 22 is adjusted to working position, as shown in Figure 5, after photovoltaic part is installed and terminated, regulating travel(l)ing rest 22 to dodge to dodging the movement of position to photovoltaic erection unit, only needing paddling buoyancy tank to move along pile 30 spacing direction d1, thus simplify the paddling operation of photovoltaic erection unit, improve installation effectiveness.
Because photovoltaic part is arranged on the both sides (both sides perpendicular to pile spacing direction d1) of pile 30, and the skewed installation of photovoltaic panel, therefore, be further operating as, the upper end working face of installing rack 20 is arranged to step-like.The upper end of support column 21 is also provided with the fixed support 23 be fixedly connected with it, fixed support 23 is positioned at inside buoyancy tank 10, the first working face 231 on fixed support 23 is arranged in the horizontal direction, the second working face 221 on travel(l)ing rest 22 is arranged in the horizontal direction, and the height of the first working face 231 is greater than the height of the second working face 221.Working face refers to supporting surface bracing frame 20 putting photovoltaic part, instrument and support operation workman.Fixed support 23 and travel(l)ing rest 22 are placed in when photovoltaic part is installed the both sides of pile 30, and simultaneously step-like working face, to match with the inclination installation requirements of photovoltaic part, realizes the convenient of differing heights photovoltaic part and installs.During concrete operations, travel(l)ing rest 22 is articulated and connected by hinge and support column 21, and support column 21 is steel structure structure and is fixed on buoyancy tank 10.The length of travel(l)ing rest 22 should be less than the spacing between two piles 30.
Scheme is specifically, installing rack 20 is arranged along length direction interval on buoyancy tank 10 of buoyancy tank 10, and the spacing between installing rack 20 is consistent with the spacing between pile 30.Bracing frame is also provided with for carrying out the band of colligation with pile 30.The colligation of band to have an impact to the installation of photovoltaic part for preventing jolting of buoyancy tank 10, simultaneously by arranging multiple installing rack 20, realizing once installing photovoltaic part to multiple pile 30, improving installation effectiveness.
In a word, the photovoltaic erection unit that the utility model provides, it effectively can simplify the paddling operation of buoyancy tank, improves the installation effectiveness of photovoltaic part waterborne.
The above is only preferred implementation of the present utility model; should be understood that; for those skilled in the art; to know in the utility model after contents; under the prerequisite not departing from the utility model principle; can also make some equal conversion to it and substitute, these convert on an equal basis and substitute and also should be considered as belonging to protection range of the present utility model.

Claims (6)

1. a photovoltaic erection unit, it is characterized in that: comprise buoyancy tank, buoyancy tank is provided with the installing rack for installing photovoltaic part, installing rack comprises the support column of vertical shape layout and the travel(l)ing rest of support column upper end setting, travel(l)ing rest and support column form to be rotationally connected along vertical and coordinate, support column is provided with the latch assembly that the rotation of travel(l)ing rest is locked, travel(l)ing rest is in two states, and one is: travel(l)ing rest extends to the outside of buoyancy tank for inserting the working position carrying out the installation of photovoltaic part between adjacent pile; It two is: travel(l)ing rest rotates to return back to dodges position inside buoyancy tank.
2. photovoltaic erection unit according to claim 1, is characterized in that: the upper end working face of installing rack is arranged to step-like.
3. photovoltaic erection unit according to claim 1 and 2, is characterized in that: the upper end of support column is also provided with the fixed support be fixedly connected with it, and fixed support is positioned at inside buoyancy tank.
4. photovoltaic erection unit according to claim 3, is characterized in that: installing rack is arranged along length direction interval on buoyancy tank of buoyancy tank, and the spacing between installing rack is consistent with the spacing between pile.
5. photovoltaic erection unit according to claim 3, is characterized in that: the first working face on fixed support is arranged in the horizontal direction, and the second working face on travel(l)ing rest is arranged in the horizontal direction, and the height of the first working face is greater than the height of the second working face.
6. photovoltaic erection unit according to claim 3, is characterized in that: bracing frame is also provided with for carrying out the band of colligation with pile.
CN201520841506.5U 2015-10-28 2015-10-28 Photovoltaic erection equipment Active CN205039743U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520841506.5U CN205039743U (en) 2015-10-28 2015-10-28 Photovoltaic erection equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520841506.5U CN205039743U (en) 2015-10-28 2015-10-28 Photovoltaic erection equipment

Publications (1)

Publication Number Publication Date
CN205039743U true CN205039743U (en) 2016-02-17

Family

ID=55298611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520841506.5U Active CN205039743U (en) 2015-10-28 2015-10-28 Photovoltaic erection equipment

Country Status (1)

Country Link
CN (1) CN205039743U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105245168A (en) * 2015-10-28 2016-01-13 安徽恒坤地基基础工程有限公司 Photovoltaic installation device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105245168A (en) * 2015-10-28 2016-01-13 安徽恒坤地基基础工程有限公司 Photovoltaic installation device
CN105245168B (en) * 2015-10-28 2018-04-20 安徽恒坤地基基础工程有限公司 A kind of photovoltaic installs equipment

Similar Documents

Publication Publication Date Title
CN204369372U (en) A kind of lift car
CN105245168A (en) Photovoltaic installation device
CN202577305U (en) Steel column positioner
CN205039743U (en) Photovoltaic erection equipment
CN104527923B (en) Cabin entering mounting method used for main push motor and adopting auxiliary mounting bracket
CN205224034U (en) Prestressing force pile driver
CN205345268U (en) Hull strutting arrangement
CN105479412A (en) Rudder blade mounting fixture
CN204456850U (en) Just dismounting building floor mould bracing frame and mould disposed thereon
CN216339588U (en) Foundation pit supporting beam structure
CN215622599U (en) Auxiliary tool for installing shaft rudder system
CN217028954U (en) Temporary support device for coal mine tunneling
KR101299971B1 (en) Jackup barge with the improvement of sailing stability and method of construction using the same
CN203903899U (en) Vehicle body lifting rack
CN204334433U (en) A kind of solar panels mounting bracket being fixed on high-tension cable steel tower inside
CN214363296U (en) Slope protection device for water conservancy and hydropower
CN205740123U (en) Sound barrier panel hoisting machine under high-voltage fence
CN101519871A (en) Single-phase hanging tamping machine
CN204470882U (en) The positioning welding bracing or strutting arrangement of steel construction railing crossbeam
CN203625846U (en) Overwater floating type operation platform pile fixing device
CN105923558A (en) Hoisting machine for sound barrier plates below high-voltage grid
CN209192912U (en) A kind of generator maintenance shift unit
CN211258614U (en) Trailer top bracing mechanism of TBM rock roadway heading machine
CN203361170U (en) Supporting upright column pile for building foundation pit support
CN207792430U (en) A kind of correcting structure of elevator car frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant