CN205011212U - Winding friction puffer installation device of lifting machine multilayer steel silk rope - Google Patents

Winding friction puffer installation device of lifting machine multilayer steel silk rope Download PDF

Info

Publication number
CN205011212U
CN205011212U CN201520776376.1U CN201520776376U CN205011212U CN 205011212 U CN205011212 U CN 205011212U CN 201520776376 U CN201520776376 U CN 201520776376U CN 205011212 U CN205011212 U CN 205011212U
Authority
CN
China
Prior art keywords
rope
wire rope
head
friction
derrick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520776376.1U
Other languages
Chinese (zh)
Inventor
刘劲军
邹声勇
杜波
徐永福
李荣德
沈剑锋
冯海平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Mining Machinery and Engineering Design Institute Co Ltd
Original Assignee
Luoyang Mining Machinery and Engineering Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Mining Machinery and Engineering Design Institute Co Ltd filed Critical Luoyang Mining Machinery and Engineering Design Institute Co Ltd
Priority to CN201520776376.1U priority Critical patent/CN205011212U/en
Application granted granted Critical
Publication of CN205011212U publication Critical patent/CN205011212U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model provides a winding friction puffer installation device of lifting machine multilayer steel silk rope, is set up perpendicularly by the corresponding corresponding well head in derrick top in well head top, the head sheave is rolled up with rub dolly and lifting machine and wire rope and is set up on same straight line, the crossbearer at derrick middle part corresponds the well head and sets up at least one card rope device, sets up the wire rope head on the card rope device, and card rope device corresponds the movable pulley that wire rope below on the well head set up hoisting conveyance, wire rope rolls up and rubs and sets up wire rope between dolly and head sheave and the hoisting conveyance, sets up the chucking between wire rope head and the hoisting conveyance and detains, the utility model discloses can guarantee that multilayer winding's wire rope that the winding is carried in the area on the reel to the combination is inseparable between assurance wire rope's steel wire, the atress is balanced, indeformable, can improve wire rope's life.

Description

A kind of friction puffer erecting device of gig multilayer wirerope-winding
Technical field
The utility model relates to mine hoist multilayer wire rope winding device, especially a kind of friction puffer erecting device of gig multilayer wirerope-winding.
Background technology
At present, mine hoist is one of important and key equipment in mine, is mainly used in colliery, metallic ore and nonmetalliferous ore gig and transfers personnel, promotes coal, ore and transporting material and equipment.It contacts important transport facility that is aboveground and down-hole.In mine, occupy very consequence, be the visual plant in mine.Mine hoist is developed by hand winch, and along with the development of science and technology, gig develops into JKA type from KJ type, and develops into present JK type winding type mine gig by XKT type, XKTB type.
The existing cylindrical drum hoist of China is used for winding of single layer, need not consider the tension force in steel rope when steel rope is installed and is wound around, and therefore the normal steel rope installation method adopted is:
One, steel rope is directly wound into reel from wire rope roll.
Two, steel wire tail of rope is passed through head sheave, move to above lifting container.
Three, cut fag end, steel rope is installed on above container.
Four, steel rope installs, and new steel rope is at low speed, and under low load, break-in runs certain number of times.
This kind of method is not with when being wound on reel at steel rope and is carried, itself being in relaxed state is wound onto on reel, when steel rope starts run with load, the steel rope that upper strata steel rope meeting severe crush lower floor is originally lax, causes the premature failure of lower floor's steel rope;
In view of the foregoing, the steel rope that existing gig multilayer wirerope-winding and upper strata steel rope meeting severe crush lower floor relax originally, cause the premature failure of lower floor's steel rope, now invent a kind of friction puffer erecting device of gig multilayer wirerope-winding.
Utility model content
The purpose of this utility model is can the originally lax steel rope of severe crush lower floor in order to overcome existing gig multilayer wirerope-winding and upper strata steel rope, cause the premature failure of lower floor's steel rope, by rational design, a kind of friction puffer erecting device of gig multilayer wirerope-winding is provided, the utility model can ensure that the steel rope of multiple wraps is that band carries winding on reel, thus combine tight, stress equalization between the steel wire of guarantee steel rope, indeformable, the service life of steel rope can be improved.
The utility model to achieve these goals, adopt following technical scheme: a kind of friction puffer erecting device of gig multilayer wirerope-winding, be by derrick, head sheave, lifting container, container movable pulley, card rope device, wire rope roll, friction dolly, gig, well head, snap fastener are formed; Above well head, correspondence arranges derrick, arranges head sheave above derrick, and the corresponding well head of head sheave is vertically arranged; Derrick side arranges friction dolly, and friction dolly side arranges wire rope roll; Between friction dolly and derrick, gig is set; Head sheave is arranged on the same line with rub dolly and gig and wire rope roll; Arrange crossbearer in the middle part of derrick, the corresponding well head of crossbearer arranges at least one card rope device, and card rope device arranges steel wire rope head, arranges lifting container below the steel rope on the corresponding well head of card rope device; Lifting container upper center arranges container movable pulley; Wire rope roll and friction dolly and arrange steel rope between head sheave and lifting container, arrange snap fastener between steel wire rope head and lifting container.
Beneficial effect: the utility model can ensure that the steel rope of multiple wraps is with to carry to be wound around on reel, thus combines tight, stress equalization between the steel wire of guarantee steel rope, indeformable, can improve the service life of steel rope.
Described steel rope installation method, when carrying out multiple wraps lifting, require the steel rope of lower floor must be with certain tension force be wound on reel (steel rope is under this tension force, diameter diminishes, steel rope is hardening, thus the pressure of upper strata steel rope can be born, otherwise, the pressure of upper strata steel rope will make lower floor's steel rope be subject to grievous injury, data display once this operation can make steel rope scrap), therefore, certain mode must be adopted by wirerope-winding to reel, make it be that band carries winding.Below that rope belt of the present invention carries winding method:
Steel rope is pulled out from wire rope roll, by friction puffer, through the movable pulley above container, moves on headframe, fag end is fixed on headframe.
With friction puffer, lifting container (should be now fully loaded in lifting container) is transferred in the middle part of pit shaft by movable pulley by steel rope.
When lifting container is transferred to after in the middle part of pit shaft, will fix at headframe from steel wire rope head, (now fag end can be subject to pulling force, therefore must fix), and then, steel rope afterbody be shifted out from wire rope roll and friction puffer, is installed on gig.
Gig is slowly wound around, and by movable pulley, container is risen to well head, and during rope woolding, steel rope mentions fully loaded lifting container by movable pulley, therefore steel rope has enough tensile forces.After container is mentioned well head, decontrol fag end, fag end is installed on lifting container.
Cylindrical drum hoist steel rope installation method of the present invention, friction winch is utilized to transfer in the middle part of pit shaft by lifting container, then the quality of card rope device supporting steel-cable and lifting container is utilized, steel rope is installed on reel, then utilize the movable pulley on reel and lifting container, allow rope belt carry while being mentioned by lifting container and be wrapped on lifting drum.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail:
Fig. 1 is, general assembly rope first dress face structural representation;
Fig. 2 is, puts rope installing card rope device structural representation;
Fig. 3 is, changes gig rope position, separates wire clips structural representation;
Fig. 4 is, promotes bit architecture schematic diagram;
Fig. 5 is, fag end changes the outfit structural representation;
In Fig. 1 .2.3.4.5: derrick 1, head sheave 2, lifting container 3, container movable pulley 4, card rope device 5, wire rope roll 6, friction dolly 7, gig 8, well head 9, snap fastener 10.
Detailed description of the invention
Below in conjunction with accompanying drawing and detailed description of the invention, the utility model is described in further detail:
Above well head 9, correspondence arranges derrick 1, arranges head sheave 2 above derrick 1, and the corresponding well head 9 of head sheave 2 is vertically arranged; Derrick 1 side arranges friction dolly 7, and friction dolly 7 side arranges wire rope roll 6; Between friction dolly 7 and derrick 1, gig 8 is set; Head sheave 2 arranges on the same line with rub dolly 7 and gig 8 and wire rope roll 6; Arrange crossbearer in the middle part of derrick 1, the corresponding well head 9 of crossbearer arranges card rope device 5, card rope device 5 arranges steel wire rope head, arranges lifting container 3 below the steel rope on the corresponding well head 9 of card rope device 5; Lifting container 3 upper center arranges container movable pulley 4; Wire rope roll 6 and friction dolly 7 and arrange steel rope between head sheave 2 and lifting container 3, arrange snap fastener 10 between steel wire rope head and lifting container 3.

Claims (3)

1. the friction puffer erecting device of a gig multilayer wirerope-winding, be by derrick (1), head sheave (2), lifting container (3), container movable pulley (4), card rope device (5), wire rope roll (6), friction dolly (7), gig (8), well head (9), snap fastener (10) are formed; It is characterized in that: well head (9) top correspondence arranges derrick (1), and derrick (1) top arranges head sheave (2), and head sheave (2) corresponding well head (9) is vertically arranged; Derrick (1) side arranges friction dolly (7), and friction dolly (7) side arranges wire rope roll (6); Between friction dolly (7) and derrick (1), gig (8) is set.
2. according to the friction puffer erecting device of a kind of gig multilayer wirerope-winding described in claim 1, it is characterized in that: head sheave (2) is arranged on the same line with rub dolly (7) and gig (8) and wire rope roll (6); Derrick (1) middle part arranges crossbearer, the corresponding well head (9) of crossbearer arranges at least one card rope device (5), (5) arrange steel wire rope head to card rope device, arrange lifting container (3) below the steel rope on card rope device (5) corresponding well head (9).
3., according to the friction puffer erecting device of a kind of gig multilayer wirerope-winding described in claim 1, it is characterized in that: lifting container (3) upper center arranges container movable pulley (4); Wire rope roll (6) and friction dolly (7) and arrange steel rope between head sheave (2) and lifting container (3), arrange snap fastener (10) between steel wire rope head and lifting container (3).
CN201520776376.1U 2015-09-27 2015-09-27 Winding friction puffer installation device of lifting machine multilayer steel silk rope Active CN205011212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520776376.1U CN205011212U (en) 2015-09-27 2015-09-27 Winding friction puffer installation device of lifting machine multilayer steel silk rope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520776376.1U CN205011212U (en) 2015-09-27 2015-09-27 Winding friction puffer installation device of lifting machine multilayer steel silk rope

Publications (1)

Publication Number Publication Date
CN205011212U true CN205011212U (en) 2016-02-03

Family

ID=55209826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520776376.1U Active CN205011212U (en) 2015-09-27 2015-09-27 Winding friction puffer installation device of lifting machine multilayer steel silk rope

Country Status (1)

Country Link
CN (1) CN205011212U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108609464A (en) * 2018-06-30 2018-10-02 安徽吉乃尔电器科技有限公司 A kind of more lifting devices of the rope with stability in mine
CN112173930A (en) * 2020-09-17 2021-01-05 高企达电梯(江苏)有限公司 Integrated rope reel for indoor construction elevator

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108609464A (en) * 2018-06-30 2018-10-02 安徽吉乃尔电器科技有限公司 A kind of more lifting devices of the rope with stability in mine
CN112173930A (en) * 2020-09-17 2021-01-05 高企达电梯(江苏)有限公司 Integrated rope reel for indoor construction elevator
CN112173930B (en) * 2020-09-17 2022-02-25 高企达电梯(江苏)有限公司 Integrated rope reel for indoor construction elevator

Similar Documents

Publication Publication Date Title
CN201458616U (en) Automatic constant-tension retraction and cable laying umbilical cable winch device
GB2499178A (en) Method and device for handling of rope
CN205011212U (en) Winding friction puffer installation device of lifting machine multilayer steel silk rope
CN103508352B (en) A kind of cable-remover carrying predetermincd tension
CN105173975A (en) Synchronous head sheave balance adjustment method for multi-rope winding type elevator
CN105035990A (en) Steel wire rope guiding device and operating method
CN107032245B (en) A kind of head sheave automatic force regulating device and method of extra deep shaft duplex type lifting system
CN201125115Y (en) Double-rope lifting mechanism of hoister
CN105174004B (en) A kind of friction puffer band of elevator multilayer wirerope-winding carries installation method
CN104310257A (en) Pneumatic winch capable of automatically tensioning and arranging ropes
CN104355250A (en) Winch
CN201214610Y (en) Hoist arrange rope device
CN109911748B (en) Construction process for replacing mine hoisting head rope
CN205114823U (en) Supplementary instrument that lifts by crane that head sheave or leading wheel were used
CN203197529U (en) Belt conveyer belt replacement system
CN205076612U (en) Wire rope synchroballistic wheel device of drum hoisting machines of restricting more
CN205011191U (en) Synchronous head sheave balance -adjustment device that restrict drum hoisting machine more
CN102344086A (en) Method for replacing lifting ropes of multi-rope frictional geared winch
CN201447325U (en) Kiloton grade derrick winch
CN201910607U (en) Suspension type multi-cable winding displacement device
CN205740126U (en) A kind of electric cable rotary wind
CN105314509A (en) Safe transport traction device for perpendicular construction of vertical shaft
CN203474190U (en) Anti-winding device for changing mine hoisting rope
CN108059103B (en) A kind of extra deep shaft large traction friction winding system and method