CN205004456U - Frock is connected to quick reliable ground in elevator job site - Google Patents
Frock is connected to quick reliable ground in elevator job site Download PDFInfo
- Publication number
- CN205004456U CN205004456U CN201520782965.0U CN201520782965U CN205004456U CN 205004456 U CN205004456 U CN 205004456U CN 201520782965 U CN201520782965 U CN 201520782965U CN 205004456 U CN205004456 U CN 205004456U
- Authority
- CN
- China
- Prior art keywords
- shaped support
- type support
- stay bolt
- screw
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007906 compression Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Abstract
The utility model discloses a frock is connected to quick reliable ground in elevator job site, it includes U type support, stay bolt, pressure strip, U type support upper end and middle part all be equipped with the screw, the stay bolt lower extreme be equipped with the screw hole, the stay bolt be connected with U type support through U type support upper end screw, pressure strip upper end connecting rod be equipped with the screw thread and be connected with stay bolt lower extreme screw hole, the lag bolt be connected with U type support through U type support middle part screw, ground connection divide the terminal to be connected with U type support through the lag bolt, the earth bus be connected with U type support through the pressure strip. The utility model has the advantages of being simple in structure and convenient in operation, the reliability of elevator job site electrical apparatus ground connection can be guaranteed, its production efficiency can be improved again.
Description
Technical field
The utility model relates to elevator technical field of construction, is specifically related to elevator job site fast and reliable grounding connection frock.
Background technology
Elevator is a kind of special equipment, and elevator is widely used in the buildings such as market, office building, house, and the electrical equipment ground connection quality of elevator construction is used elevator safely to the people undoubtedly and played vital effect.The designed reliability of elevator job site fast and reliable grounding connection frock determines the safety of elevator use, if elevator job site fast and reliable grounding connection Fixture Design is unreliable, take advantage of people's part that leak current fault occurs at elevator, elevator electrical equipment earthing device can not effectively use, and easily produces security incident and affects the safe handling of elevator.
In most elevator job site, the electrical equipment ground connection employing of elevator is connected on the earth terminal of building temporarily, and this installation method, the poor stability of installation quality, the quality of quality depends on the height of the technical merit of workman.
Summary of the invention
The purpose of this utility model is the elevator job site fast and reliable grounding connection frock providing a kind of structure simple, easy to operate, and it can solve the installation difficult problem existed in background technology.
For achieving the above object, the technical solution of the utility model, it comprises U-shaped support, stay bolt, pressure strip, and described U-shaped pedestal upper end and middle part are all provided with screw; Described stay bolt lower end is provided with screwed hole; Described stay bolt is connected with U-shaped support by U-shaped pedestal upper end screw; Described pressure strip upper end connecting rod is provided with screw thread and is connected with stay bolt lower end screwed hole; Described lag bolt is connected with U-shaped support by U-shaped mid-stent screw; Described ground connection divides terminal to be connected with U-shaped support by lag bolt; Described earth bus is connected with U-shaped support by pressure strip.
In technique scheme, described nut one is connected on stay bolt; Described nut two is connected on lag bolt.
Effect of the present utility model is: structure is simple, easy to operate, reliable clamping, and the good stability of elevator electrical equipment ground connection quality, production efficiency is high.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model elevator job site fast and reliable grounding connection frock.
Attached number in the figure is respectively: 1, U-shaped support, 2, stay bolt, 2 ', lag bolt, 3, ground connection divides terminal, 4, earth bus, 5, nut one, 5 ', nut two, 6, pressure strip.
Embodiment
Below in conjunction with accompanying drawing, the utility model elevator job site fast and reliable grounding connection frock is described further.
As seen from Figure 1, the utility model it comprise U-shaped support, stay bolt, pressure strip, described U-shaped pedestal upper end and middle part are all provided with screw; Described stay bolt lower end is provided with screwed hole; Described stay bolt is connected with U-shaped support by U-shaped pedestal upper end screw; Described pressure strip upper end connecting rod is provided with screw thread and is connected with stay bolt lower end screwed hole; Described lag bolt is connected with U-shaped support by U-shaped mid-stent screw; Described ground connection divides terminal to be connected with U-shaped support by lag bolt; Described earth bus is connected with U-shaped support by pressure strip.
Using method of the present utility model is: the top first nut one (5) being screwed to stay bolt (2), stay bolt (2) is screwed to the position of stay bolt (2) length half by U-shaped support (1) upper end screw, pressure strip (6) upper end connecting rod is connected with stay bolt (2) lower end screwed hole, stay bolt (2) is down rotated, pressure strip (6) is made to compress earth bus (4) until apply 50N pretightning force, stop nut one (5) is screwed to is close to U-shaped support (1), the ground connection of ground connection each is needed to divide terminal (3) to be connected on lag bolt (2 '), lag bolt (2 ') compression ground connection is made to divide terminal (3) until apply 50N pretightning force, stop nut two (5 ') is screwed to be close on U-shaped support (1), each earth terminal has connected.
In the present embodiment, described nut one (5) is connected on stay bolt (2), and described nut two (5 ') is connected on lag bolt (2 '), does not loosen when this can ensure that each earth terminal uses.
Claims (2)
1. an elevator job site fast and reliable grounding connection frock, it comprises U-shaped support (1), stay bolt (2), pressure strip (6), it is characterized in that: described U-shaped support (1) upper end and middle part are all provided with screw; Described stay bolt (2) lower end is provided with screwed hole; Described stay bolt (2) is connected with U-shaped support (1) by U-shaped support (1) upper end screw; Described pressure strip (6) upper end connecting rod is provided with screw thread and is connected with stay bolt (2) lower end screwed hole; Described lag bolt (2 ') is connected with U-shaped support (1) by U-shaped support (1) middle part screw; Described ground connection divides terminal (3) to be connected with U-shaped support (1) by lag bolt (2 '); Described earth bus (4) is connected with U-shaped support (1) by pressure strip (6).
2. the elevator job site fast and reliable grounding connection frock according to claims 1, is characterized in that: described nut one (5) is connected on stay bolt (2); Described nut two (5 ') is connected on lag bolt (2 ').
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520782965.0U CN205004456U (en) | 2015-10-10 | 2015-10-10 | Frock is connected to quick reliable ground in elevator job site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520782965.0U CN205004456U (en) | 2015-10-10 | 2015-10-10 | Frock is connected to quick reliable ground in elevator job site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205004456U true CN205004456U (en) | 2016-01-27 |
Family
ID=55161328
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520782965.0U Expired - Fee Related CN205004456U (en) | 2015-10-10 | 2015-10-10 | Frock is connected to quick reliable ground in elevator job site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205004456U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105119064A (en) * | 2015-10-10 | 2015-12-02 | 夏艳光 | Rapid and reliable grounding connection tool for elevator construction site |
-
2015
- 2015-10-10 CN CN201520782965.0U patent/CN205004456U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105119064A (en) * | 2015-10-10 | 2015-12-02 | 夏艳光 | Rapid and reliable grounding connection tool for elevator construction site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203415716U (en) | Power system electrified operation wiring clamp | |
CN205004456U (en) | Frock is connected to quick reliable ground in elevator job site | |
CN201991295U (en) | Insulating cross arm capable of adjusting location of wire | |
CN204558683U (en) | A kind of parallel groove clamp | |
CN203014232U (en) | Transformer station tube type bus single-clamp grounding device | |
CN203277304U (en) | Built-in high-voltage fuse sleeve installation apparatus | |
CN203367502U (en) | Wire grounding device | |
CN105119064A (en) | Rapid and reliable grounding connection tool for elevator construction site | |
CN204046060U (en) | One does not have a power failure and changes strain insulator string combination tool | |
CN203983535U (en) | A kind of low-voltage meter box Special grounding wire | |
CN202474240U (en) | Terminal connector | |
CN202633757U (en) | Auxiliary ground ring for low-voltage grounding | |
CN203879366U (en) | Jumper installing auxiliary positioning climbing frame | |
CN204243238U (en) | A kind of pin type low-voltage variation earth connection | |
CN204333330U (en) | A kind of WV binding post | |
CN104033099B (en) | Erect-position climbing frame installed by slippage safety band type wire jumper | |
CN203839881U (en) | Strain clamp structure specially used for 110KV transmission line | |
CN204333319U (en) | A kind of earth wire insulating rod | |
CN204510984U (en) | A kind of emergency power circuit support bar | |
CN103647164A (en) | Multifunctional ground rod wire end wire clamp | |
CN204156106U (en) | The earth connection clamping unit that a kind of nuclear bridge is special | |
CN209329396U (en) | Lightning rod | |
CN203932337U (en) | A kind of grounding pin | |
CN203859238U (en) | Connector capable of improving installation efficiency of main ground wire | |
CN204044405U (en) | Optical cable fixing-line device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160127 Termination date: 20161010 |