CN204046060U - One does not have a power failure and changes strain insulator string combination tool - Google Patents
One does not have a power failure and changes strain insulator string combination tool Download PDFInfo
- Publication number
- CN204046060U CN204046060U CN201420492904.6U CN201420492904U CN204046060U CN 204046060 U CN204046060 U CN 204046060U CN 201420492904 U CN201420492904 U CN 201420492904U CN 204046060 U CN204046060 U CN 204046060U
- Authority
- CN
- China
- Prior art keywords
- vertical plates
- plate
- support member
- push rod
- transverse plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Insulators (AREA)
Abstract
本实用新型公开一种不停电更换耐张绝缘子串组合工具,包括:第一支撑件,其由一横向板和两根分别连接于所述横向板两端的竖直板组成,所述横向板上设有一用于将所述横向板固定在横担上的紧固件,所述两根竖直板的末端均设有一固定孔;第二支撑件,其由一横向顶杆和两根分别连接于该横向顶杆两端的连接杆组成,所述连接杆的末端通过螺丝与所述两根竖直板相连,所述横向顶杆的端部设置有一倾斜设置的抵压杆,且该横向顶杆置于导线上方;承力部,用于承接耐张线夹和绝缘子串,其包括一托板以及通过固定绑带连接于所述托板两侧的连接件组成,所述连接件上设置有卡板,所述托板部通过所述两个连接件上的卡板卡接于所述两根竖直板而固定在所述第一支撑件的下方;隔板,其为T字型,该隔板悬挂于所述第一支撑件的两个竖直板上且位于所述横向板与承力部之间。
The utility model discloses a combination tool for replacing tension insulator strings without power failure, which comprises: a first support member, which is composed of a transverse plate and two vertical plates respectively connected to two ends of the transverse plate, the transverse plate There is a fastener used to fix the horizontal plate on the cross arm, and a fixing hole is provided at the end of the two vertical plates; the second support is connected by a horizontal push rod and two It is composed of connecting rods at both ends of the horizontal push rod, the ends of the connecting rods are connected with the two vertical plates through screws, an inclined pressing rod is arranged at the end of the horizontal push rod, and the horizontal push rod The rod is placed above the wire; the load-bearing part is used to accept the strain clamp and the insulator string, which consists of a supporting plate and connecting pieces connected to both sides of the supporting plate through fixed straps. There is a clamping plate, and the supporting plate part is fixed below the first support member through clamping on the two vertical plates through the clamping plates on the two connectors; the partition plate is T-shaped , the partition is suspended from the two vertical plates of the first support member and is located between the transverse plate and the bearing part.
Description
技术领域 technical field
本实用新型涉及一种不停电更换耐张绝缘子串组合工具。 The utility model relates to a combined tool for replacing tension insulator strings without power failure.
背景技术 Background technique
基于现有技术的限制,在电力线路安装和维修时为了确保操作人员的安全,一般会先将电断开,在停电的状态下进行线路的安装和维修。而偶尔也会出现不停电操作的时候,但是该情况下需要使用到大量的绝缘遮蔽工具,而绝缘遮蔽工具的价格比较高,且在不停电的情况下,对绝缘遮蔽工具的损坏比较大,使得绝缘遮蔽工具寿命大大的缩短。 Based on the limitations of the prior art, in order to ensure the safety of operators during the installation and maintenance of power lines, the electricity is generally disconnected first, and the installation and maintenance of the lines are carried out in a state of power failure. Occasionally, there will be a time of non-power-off operation, but in this case, a large number of insulation and shielding tools need to be used, and the price of insulation and shielding tools is relatively high, and in the case of no power failure, the damage to the insulation and shielding tools is relatively large. The life of the insulation shielding tool is greatly shortened.
实用新型内容 Utility model content
由于现有技术存在着上述问题,本实用新型提出一种不停电更换耐张绝缘子串组合工具,其可以有效的解决现有技术的上述问题。 Due to the above-mentioned problems in the prior art, the utility model proposes a combination tool for replacing tension insulator strings without power failure, which can effectively solve the above-mentioned problems in the prior art.
本实用新型通过以下技术方案解决上述问题: The utility model solves the above problems through the following technical solutions:
一种不停电更换耐张绝缘子串组合工具,包括:第一支撑件,其由一横向板和两根分别连接于所述横向板两端的竖直板组成,所述横向板上设有一用于将所述横向板固定在横担上的紧固件,所述两根竖直板的末端均设有一固定孔;第二支撑件,其由一横向顶杆和两根分别连接于该横向顶杆两端的连接杆组成,所述连接杆的末端通过螺丝与所述两根竖直板相连,所述横向顶杆的端部设置有一倾斜设置的抵压杆,且该横向顶杆置于导线上方;承力部,用于承接耐张线夹和绝缘子串,其包括一托板以及通过固定绑带连接于所述托板两侧的连接件组成,所述连接件上设置有卡板,所述托板部通过所述两个连接件上的卡板卡接于所述两根竖直板而固定在所述第一支撑件的下方;隔板,其为T字型,该隔板悬挂于所述第一支撑件的两个竖直板上且位于所述横向板与承力部之间。 A combination tool for replacing tension insulator strings without power failure, comprising: a first support member, which is composed of a transverse plate and two vertical plates respectively connected to the two ends of the transverse plate, and the transverse plate is provided with a Fasteners for fixing the transverse plate on the cross arm, the ends of the two vertical plates are provided with a fixing hole; the second supporting member is connected to the transverse top by a transverse push rod and two The connecting rods at both ends of the connecting rods are connected with the two vertical plates by screws, and the end of the horizontal ejector rod is provided with an obliquely arranged pressing rod, and the horizontal ejector rod is placed on the wire Above; the load-bearing part is used to accept the strain clamp and the insulator string, which includes a supporting plate and connecting pieces connected to both sides of the supporting plate through fixed straps, and the connecting piece is provided with a clamping plate, The supporting plate part is fastened to the two vertical plates through the clips on the two connecting parts and fixed below the first supporting member; the partition is T-shaped, and the partition It is suspended on the two vertical plates of the first support member and located between the transverse plate and the bearing part.
所述连接杆的末端通过螺纹铰接一工字型连接头,该连接头的两侧边上设置有一螺丝孔,所述竖直板卡设于所述连接头的两边内并通过螺丝紧固。 The end of the connecting rod is hinged to an I-shaped connecting head through threads, and a screw hole is arranged on both sides of the connecting head, and the vertical plate is clamped in the two sides of the connecting head and fastened by screws.
所述两根连接杆上分别设置有一加重棒。 A weighting rod is respectively arranged on the two connecting rods.
所述托板为圆弧状。 The supporting plate is arc-shaped.
所述第一支撑件和第二支撑件以及承力部为绝缘材料构成。 The first supporting piece, the second supporting piece and the bearing portion are made of insulating material.
本实用新型的不停电更换耐张绝缘子串组合工具通过第一支撑件、第二支撑件的共同作用,可以起到对导线、耐张线夹、绝缘子串以及横担的绝缘遮蔽,同时配合承力部可以在更换耐张绝缘子串的时候承力,从而可达到降低绝缘遮蔽工具的使用率,延长工具寿命的目的以及提高操作人员的作业效率,缩短维修时间。 The combination tool for replacing tension insulator strings without power failure of the utility model can play the role of insulation and shielding for wires, strain clamps, insulator strings and cross arms through the joint action of the first support and the second support, and at the same time cooperate with the bearing The force part can bear the force when replacing the tension insulator string, so as to reduce the utilization rate of insulation shielding tools, prolong the life of tools, improve the working efficiency of operators, and shorten the maintenance time.
附图说明 Description of drawings
图1是本实用新型的一实施例的第一支撑件结构示意图; Fig. 1 is a schematic structural diagram of a first support member according to an embodiment of the present invention;
图2是本实用新型的一实施例的第二支撑件结构示意图; Fig. 2 is a schematic structural diagram of a second support member according to an embodiment of the present invention;
图3是本实用新型的一实施例的承力部的结构示意图; Fig. 3 is a schematic structural view of a bearing part of an embodiment of the present invention;
图4是本实用新型的一实施例的隔板的结构示意图; Fig. 4 is a structural schematic diagram of a partition according to an embodiment of the present invention;
图5是本实用新型的整体使用时的结构示意图。 Fig. 5 is a structural schematic view of the utility model when it is used as a whole.
具体实施方式 Detailed ways
下面结合具体实施方式,详细描述本实用新型。 Below in conjunction with specific embodiment, describe the utility model in detail.
参见图1至图5所示。图1是本实用新型的一实施例的第一支撑件结构示意图;图2是本实用新型的一实施例的第二支撑件结构示意图;图3是本实用新型的一实施例的承力部的结构示意图。 See Figures 1 to 5. Fig. 1 is a schematic structural diagram of the first support of an embodiment of the utility model; Fig. 2 is a schematic structural diagram of the second support of an embodiment of the utility model; Fig. 3 is a bearing part of an embodiment of the utility model Schematic diagram of the structure.
本实施例的不停电更换耐张绝缘子串组合工具,包括:第一支撑件1、第二支撑件2、承力部3。其中: The combined tool for replacing tension insulator strings without power failure in this embodiment includes: a first support 1 , a second support 2 , and a bearing part 3 . in:
第一支撑件1,其由一横向板11和两根分别连接于所述横向板两端的竖直板12组成,所述横向板11上设有一用于将所述横向板固定在横担上的紧固件111,所述两根竖直板的末端均设有一固定孔121。所述第一支撑件可以起到遮挡横担的作用,并通过紧固件固定在横担上,保持稳定性。 The first support member 1 is composed of a transverse plate 11 and two vertical plates 12 respectively connected to the two ends of the transverse plate. The transverse plate 11 is provided with a Fasteners 111, the ends of the two vertical plates are provided with a fixing hole 121. The first supporting member can function as a shielding cross arm, and is fixed on the cross arm by fasteners to maintain stability.
第二支撑件2,其由一横向顶杆21和两根分别连接于该横向顶杆两端的连接杆22组成,所述连接杆22的末端通过螺丝与所述两根竖直板相连,所述横向顶杆的端部设置有一倾斜设置的抵压杆23,抵压杆23抵压在欲要修理的绝缘子串旁边的导线上,在维修绝缘子串时可通过相邻的导线分担压力。该横向顶杆21置于导线上方,起到遮挡导线的作用。其中,所述连接杆22的末端通过螺纹铰接一工字型连接头221,该连接头的两侧边上设置有一螺丝孔,所述竖直板卡设于所述连接头的两边内并通过螺丝紧固。同时为了确保第二支撑件的稳固性,在所述两根连接杆上分别设置有一加重棒24,通过两边加重棒的作用起到稳定第二支撑件的作用。 The second support member 2 is composed of a horizontal push rod 21 and two connecting rods 22 respectively connected to the two ends of the horizontal push rod, and the ends of the connecting rods 22 are connected with the two vertical plates by screws, so that The end of the horizontal ejector rod is provided with an inclined pressing rod 23, and the pressing rod 23 is pressed against the wire next to the insulator string to be repaired, and the pressure can be shared by adjacent wires when the insulator string is being repaired. The horizontal ejector rod 21 is placed above the wires to play the role of shielding the wires. Wherein, the end of the connecting rod 22 is hinged with an I-shaped connector 221 through threads, and a screw hole is arranged on both sides of the connector, and the vertical plate is clamped in the two sides of the connector and passed through Screw tight. At the same time, in order to ensure the stability of the second support member, a weighting rod 24 is respectively arranged on the two connecting rods, and the effect of the weighting rods on both sides plays a role in stabilizing the second support member.
承力部3,用于承接耐张线夹和绝缘子串,其包括一托板31以及通过固定绑带32连接于所述托板两侧的连接件33组成。所述连接件33上设置有卡板331,所述托板部通过所述两个连接件上的卡板卡接于所述两根竖直板而固定在所述第一支撑件的下方。在维修时,通过承力部承接绝缘子串。为了能托住绝缘子串和导线,所述托板设为圆弧状。 The load-bearing part 3 is used to receive the tension clamp and the insulator string, and it comprises a supporting plate 31 and connecting pieces 33 connected to both sides of the supporting plate by fixing straps 32 . The connecting member 33 is provided with a clamping plate 331 , and the supporting plate portion is fixed below the first supporting member by clamping the clamping plates on the two connecting members to the two vertical plates. During maintenance, the insulator string is supported by the bearing part. In order to support the insulator string and the wires, the supporting plate is set in an arc shape.
隔板4,其为T字型,该隔板悬挂于所述第一支撑件的两个竖直板上且位于所述横向板与承力部之间。 The partition board 4 is T-shaped, and the partition board is suspended on the two vertical boards of the first support member and is located between the horizontal board and the bearing part.
为了起到较好的绝缘效果,所述第一支撑件和第二支撑件以及承力部为绝缘材料构成。 In order to achieve a better insulation effect, the first support member, the second support member and the bearing part are made of insulating material.
应理解,这些实施方式仅用于说明本实用新型而不用于限制本实用新型的范围。此外应理解,在阅读了本实用新型讲授的内容之后,本领域技术人员可以对本实用新型作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。 It should be understood that these embodiments are only used to illustrate the utility model but not to limit the scope of the utility model. In addition, it should be understood that after reading the content taught by the utility model, those skilled in the art can make various changes or modifications to the utility model, and these equivalent forms also fall within the scope defined by the appended claims of the application.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420492904.6U CN204046060U (en) | 2014-08-29 | 2014-08-29 | One does not have a power failure and changes strain insulator string combination tool |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420492904.6U CN204046060U (en) | 2014-08-29 | 2014-08-29 | One does not have a power failure and changes strain insulator string combination tool |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204046060U true CN204046060U (en) | 2014-12-24 |
Family
ID=52246688
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420492904.6U Expired - Fee Related CN204046060U (en) | 2014-08-29 | 2014-08-29 | One does not have a power failure and changes strain insulator string combination tool |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204046060U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105098655A (en) * | 2015-08-25 | 2015-11-25 | 广东电网有限责任公司惠州供电局 | Strain insulator exchange tool |
| CN105226562A (en) * | 2015-10-22 | 2016-01-06 | 广州供电局有限公司 | A kind of post insulator auxiliary replacement device and mounting structure |
| CN108512120A (en) * | 2018-05-30 | 2018-09-07 | 广东电网有限责任公司 | Insulator replacement tool |
| CN114362035A (en) * | 2021-11-29 | 2022-04-15 | 广西电网有限责任公司电力科学研究院 | A tension insulator replacement device |
-
2014
- 2014-08-29 CN CN201420492904.6U patent/CN204046060U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105098655A (en) * | 2015-08-25 | 2015-11-25 | 广东电网有限责任公司惠州供电局 | Strain insulator exchange tool |
| CN105226562A (en) * | 2015-10-22 | 2016-01-06 | 广州供电局有限公司 | A kind of post insulator auxiliary replacement device and mounting structure |
| CN108512120A (en) * | 2018-05-30 | 2018-09-07 | 广东电网有限责任公司 | Insulator replacement tool |
| CN114362035A (en) * | 2021-11-29 | 2022-04-15 | 广西电网有限责任公司电力科学研究院 | A tension insulator replacement device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204046060U (en) | One does not have a power failure and changes strain insulator string combination tool | |
| CN205791398U (en) | Wire jumper Anti-galloping quadripartion conductor spacer | |
| CN203592419U (en) | Testing jig of television screen | |
| CN103683104A (en) | A ratchet combination tool for live fastening and draining clip | |
| CN205070303U (en) | 750kV circuit block of four strain insulator string tip fixture | |
| CN106271569B (en) | Auxiliary device for assembly of steel strand leads and clips | |
| CN204103345U (en) | A kind of novel conductors on quad bundled strain insulator string side of wire link plate clamping tool | |
| CN203014270U (en) | A triangular connecting plate connector used for a double bundled conductor in a power transmission line | |
| CN103178468A (en) | Wire clamp for being connected with live wire during live working | |
| CN203949939U (en) | A kind of clamp-type insulating support | |
| CN201656334U (en) | a fixture | |
| CN203312700U (en) | Tension tower wire end LF-type yoke plate fixing clamp | |
| CN205184325U (en) | Frock of processing alloy straight tube | |
| CN204067766U (en) | Quick joining type earthing device | |
| CN202947996U (en) | Insulating support apparatus of vibration acoustic device | |
| CN202111437U (en) | Separate bolt butt joint double-wing fixture | |
| CN205178388U (en) | Two cluster insulators of straight line are changed and are connected | |
| CN207098400U (en) | The pressure heads mechanism of copper sheet joint pressing device in a kind of regulator cubicle | |
| CN211579407U (en) | An overhead transmission line jumper and hook clip installation tool | |
| CN204156375U (en) | Transformer station's Special grounding device | |
| CN203839881U (en) | Strain clamp structure specially used for 110KV transmission line | |
| CN203883154U (en) | Improved profiled wire clamp | |
| CN209446375U (en) | A kind of auxiliary work-piece for insulating bar pull test | |
| CN204257328U (en) | For the adjustable copper bar installation structure of dry-type transformer case | |
| CN203103843U (en) | Cable clamp for fire welding during hot-line work |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141224 Termination date: 20150829 |
|
| EXPY | Termination of patent right or utility model |