CN205000694U - Full assembled steel construction parking building - Google Patents

Full assembled steel construction parking building Download PDF

Info

Publication number
CN205000694U
CN205000694U CN201520557754.7U CN201520557754U CN205000694U CN 205000694 U CN205000694 U CN 205000694U CN 201520557754 U CN201520557754 U CN 201520557754U CN 205000694 U CN205000694 U CN 205000694U
Authority
CN
China
Prior art keywords
floor
crossbeam
column
parking building
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520557754.7U
Other languages
Chinese (zh)
Inventor
孙晓彦
金龙林
舒涛
王杰
崔学宇
温雅宸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING THUPDI PLANNING DESIGN INSTITUTE Co Ltd
Original Assignee
BEIJING THUPDI PLANNING DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING THUPDI PLANNING DESIGN INSTITUTE Co Ltd filed Critical BEIJING THUPDI PLANNING DESIGN INSTITUTE Co Ltd
Priority to CN201520557754.7U priority Critical patent/CN205000694U/en
Application granted granted Critical
Publication of CN205000694U publication Critical patent/CN205000694U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a full assembled steel construction parking building, it includes the crossbeam, passes through stand, support and the floor of bolt fastening on the ground, and the crossbeam is articulated with the stand, supports both ends and fixes at crossbeam and stand articulated node, and the floor passes through the bolt fastening on the crossbeam. The utility model provides a pair of full assembled steel construction parking building adopts modular structure, has realized full prefabricationization, fixed mode adopts bolted connection, the harmless dismantlement, and repeated installation recycles, has reduced construction cost, has improved the efficiency of construction.

Description

A kind of full assembling type steel structure parking building
Technical field
The utility model relates to a kind of steel work parking building, especially a kind of full assembling type steel structure parking building.
Background technology
Along with the propelling of urbanization process, automobile industry is fast-developing, and motor vehicle number is increasing, and parking difficulty becomes the problem that solution is needed in big or middle city badly.Current parking building major part adopts concrete structure parking building, and it is formed by concrete monobloc cast at the scene.Concrete structure parking building long construction period, construction cost are high.To dismantle and move to another place parking building, overall parking building need be damaged, can not reuse, cause certain waste, and again build concrete structure parking building, need again to waste time and energy.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of modular structure design, nondestructive demounting, can repeat to install, the full assembling type steel structure parking building recycled.
The technical solution of the utility model:
A kind of full assembling type steel structure parking building, comprises crossbeam, column, support, floor, guardrail and stair.
Column is fixed on ground, crossbeam and column hinged, floor is fixed on crossbeam, and guardrail is connected with floor, and stair are connected to building body side surface, and above-mentioned fixed form all adopts detachable being threaded to realize building of parking building; Many groups support lay respectively at parking building side and middle part, be connected between adjacent floor deck in broken line, break position is all connected between crossbeam and the hinged node of column, and in order to reinforce parking building, parking building builds five layers at the most.
Crossbeam in the utility model, column, support all adopt H profile steel, and crossbeam, column, support Zheng Gen factory are customized, splice without the need to job site.
Floor is spliced by orthotropic plate or prefabricated concrete floor, and the shape of every block orthotropic plate or prefabricated concrete floor is rectangle, and its size dimension and parking space adapt, to ensure the supporting capacity of floor.Adopt the floor inside of precast concrete to arrange built-in fitting, adopt the floor internal preset fixing hole of orthotropic plate, itself and crossbeam are fixed with bolt easy to use, realize harmless installation, it is spliced into parking building flooring.
The utility model beneficial effect:
The full assembling type steel structure parking building of the one that the utility model provides, it adopts modular construction, realizes prefabricated and full assemblingization; Be fixedly connected with the mode all adopting bolt, nondestructive demounting, can repeat to install, recycle, reduce construction cost, improve efficiency of construction.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 is the A-A generalized section of Fig. 1;
Fig. 3 is the utility model parts overlap joint schematic diagram;
Fig. 4 is that schematic diagram fixed by the utility model floor.
Wherein:
1. crossbeam, 2. column, 3. support, 4. floor, 5. stair, 6. guardrail, 7. parking space, 8. passage, 9. fixed head.
Detailed description of the invention
Below in conjunction with specific embodiments and the drawings, a kind of full assembling type steel structure parking building of the utility model is described in detail:
For solving the problems of the technologies described above, a kind of full assembling type steel structure parking building of the utility model comprises crossbeam 1, column 2, support 3, floor 4, guardrail 6 and stair 5.
As Fig. 1, shown in Fig. 2, the column 2 of bottom is detachably connected on ground, the column on upper strata docks with lower floor column successively, as shown in Figure 3, the welding edges of described column 2 has fixed head 9, this fixed head 9 is fixedly connected with ground by bolt, crossbeam 1 is hinged between adjacent column 2, support 3 and have four groups at least, lay respectively at four sides of parking building, be connected between adjacent two layers floor 4 in fold-line-shaped, often organizing the starting point of support 3 and final position is all connected between crossbeam 1 and the hinged node of column 2, break is connected on the crossbeam 1 of contiguous floors, in order to reinforce parking building, in addition, the axis of parking building also can connect support 3.
For ensureing the supporting capacity of full assembling type steel structure parking building, floor 4 is bolted on crossbeam 1, be spliced by orthotropic plate or prefabricated concrete floor, floor 4 is distributed with passage 8 and parking space 7, the shape of every block orthotropic plate or prefabricated concrete floor is rectangle, and its size dimension and parking space adapt.
Parking building floor can arrange multilayer, and in the present embodiment, parking building is five layers, effectively improves the utilization rate of parking building area occupied.
Crossbeam 1, column 2, support and 3 all adopt H profile steel, crossbeam 1, column 2, to support 3 Zheng Gen factories customized, splices without the need to job site.
Before building full assembling type steel structure parking building, need the size design determination crossbeam 1 according to full assembling type steel structure parking building, column 2, support the concrete size of 3 and floor 4, according to size corresponding parts customized, and be equipped with corresponding set bolt.
During site operation, carry out overlapping full assembling type steel structure parking building, the annexation of concrete parts according to the scheme designed in advance, as shown in Figure 2.First practicably column 2 is fixed on the ground of full assembling type steel structure parking building by foot bolt; Then, use crossbeam 1 hinged between adjacent upright posts 2, the one end supporting 3 is fixed on crossbeam, and the other end is fixed on crossbeam 1 Nodes hinged with column 2, and its fixed form all adopts bolt to fix, and forms full assembling type steel structure parking building support; Finally, floor 4 is fixed on crossbeam 1.
The floor 4 be spliced by prefabricated concrete floor, is provided with built-in fitting in the inside of prefabricated concrete floor, as shown in Figure 4, itself and crossbeam 1 is fixed with bolt easy to use, realizes harmless dismounting.
Described stair 5 are connected to parking building building body side surface, stair 5 can adopt the material in situ such as steel plate assembled by bolt, guardrail 6 is connected between floor 4 edge adjacent upright posts, and guardrail 6 also can select metal hand rail site assembly to form, and removably connects between component.
When full assembling type steel structure parking building needs to dismantle and move to another place, only set bolt need be unclamped, dismounting corresponding component.The crossbeam 1 disassembled, column 2, support 3, floor 4, stair 5 and guardrail 6 all can recycle.
The full assembling type steel structure parking building of the one that the utility model provides, it adopts modular construction, achieves prefabricated and full assemblingization; Be fixedly connected with the mode all adopting bolt, nondestructive demounting, can repeat to install, recycle, effectively reduce construction cost, improve efficiency of construction.

Claims (6)

1. a full assembling type steel structure parking building, the floor of parking building is no more than five layers, comprise column (2), the crossbeam (1) be connected with column (2), the floor (4) be connected with crossbeam (1), be connected to the guardrail (6) between floor (4) edge adjacent upright posts and be connected to the stair (5) of parking building building body side surface, floor (4) is distributed with passage (8) and parking space (7), it is characterized in that, the column (2) of bottom is detachably connected on ground, the column on upper strata docks with lower floor column successively, crossbeam (1) and column (2) are articulated and connected, be connected with at least four groups between adjacent floor deck (4) and support (3), often organizing support (3) is connected between adjacent two layers floor (4) in fold-line-shaped, described crossbeam (1), column (2), support (3), floor (4), be between stair (5) and guardrail (6) and removably connect.
2. the full assembling type steel structure parking building of one according to claim 1, is characterized in that, described crossbeam (1), column (2), support (3) are H profile steel.
3. the full assembling type steel structure parking building of one according to claim 1, it is characterized in that, described floor (4) is spliced by orthotropic plate or prefabricated concrete floor, the shape of every block orthotropic plate or prefabricated concrete floor is rectangle, and its size dimension and parking space adapt.
4. the full assembling type steel structure parking building of one according to claim 3, is characterized in that, adopts floor (4) inside of precast concrete to arrange built-in fitting, adopts floor (4) the internal preset fixing hole of orthotropic plate.
5. the full assembling type steel structure parking building of one according to claim 1, is characterized in that, the welding edges of described column (2) has fixed head (9), and this fixed head (9) is fixedly connected with ground by bolt.
6. the full assembling type steel structure parking building of the one according to claim 1 to 5 any one, it is characterized in that, described often organize support (3) starting point and final position be all connected between crossbeam (1) and the hinged node of column (2), break is connected on the crossbeam (1) of contiguous floors.
CN201520557754.7U 2015-07-29 2015-07-29 Full assembled steel construction parking building Active CN205000694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520557754.7U CN205000694U (en) 2015-07-29 2015-07-29 Full assembled steel construction parking building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520557754.7U CN205000694U (en) 2015-07-29 2015-07-29 Full assembled steel construction parking building

Publications (1)

Publication Number Publication Date
CN205000694U true CN205000694U (en) 2016-01-27

Family

ID=55157590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520557754.7U Active CN205000694U (en) 2015-07-29 2015-07-29 Full assembled steel construction parking building

Country Status (1)

Country Link
CN (1) CN205000694U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288143A (en) * 2017-08-24 2017-10-24 中国电子科技集团公司第三十八研究所 A kind of foundation structure and its design method in digging-free assembled stereoscopic garage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288143A (en) * 2017-08-24 2017-10-24 中国电子科技集团公司第三十八研究所 A kind of foundation structure and its design method in digging-free assembled stereoscopic garage

Similar Documents

Publication Publication Date Title
KR101391637B1 (en) Constrution methoed for Prestressed Composite Truss girder using steel truss member
CN205531315U (en) Can dismantle steel bar truss building carrier plate support system
CN103075020B (en) A kind of steel tray supports actuating system
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN113323488B (en) Steel pipe concrete beam column connecting joint capable of being replaced after earthquake
CN105780989B (en) A kind of twin beams building cover structure
CN102704603A (en) Concrete superposed beam
CN110172924B (en) Integral hydraulic box girder template construction method
CN112502714B (en) Assembled shaft barrel structure and design and construction method
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN109972655A (en) A kind of prefabricated piping lane machinery and Combined hydraulic type, which are integrally pacified, tears steel form and installation method open
CN205000694U (en) Full assembled steel construction parking building
CN106013784A (en) Angle iron frame template and construction method
CN203905214U (en) Assembled type blend coupled wall system
CN105040810A (en) Connecting node suitable for framed shear wall structure reverse construction method
CN211735002U (en) Steel-concrete combined beam bridge capable of being installed quickly
CN104947804A (en) Steel bracket and construction method for constructing beam column joint structure through steel bracket
CN103132640A (en) Detachable steel-concrete composite floor
CN203145273U (en) Dismountable steel-concrete composite floor
CN214062328U (en) Expansion joint shaping template
CN205711786U (en) Big cross section porous overlength cast-in-place box culvert formwork system
CN205224420U (en) Anticorrosive industry factory building precast concrete stand
CN204098224U (en) Detachable concrete prefabricated wall plate structure house
CN112610014A (en) Sliding structure for railway passenger station reconstruction and extension project and construction method thereof
JP6740846B2 (en) Floor slab replacement structure and floor slab replacement construction method

Legal Events