CN204983547U - Rostone of field fabrication - Google Patents
Rostone of field fabrication Download PDFInfo
- Publication number
- CN204983547U CN204983547U CN201520774729.4U CN201520774729U CN204983547U CN 204983547 U CN204983547 U CN 204983547U CN 201520774729 U CN201520774729 U CN 201520774729U CN 204983547 U CN204983547 U CN 204983547U
- Authority
- CN
- China
- Prior art keywords
- layer
- man
- field fabrication
- made stone
- leveling layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model belongs to the technical field of the building material technique and specifically relates to a rostone of field fabrication is related to. This rostone includes: foundation structure layer, screed -coat and rostone diamond stone layer, be provided with the screed -coat on the foundation structure layer, be provided with a plurality of minutes parting beads on the screed -coat, the parting bead enclosed the colored type recess that becomes to be used for to water rostone diamond stone layer in a plurality of minutes. The user can set up the colored type recess of different shapes as required to water the rostone diamond stone layer of different colours in flower type recess. Rostone diamond stone layer installation finishing back in flower type recess, the rostone diamond stone layer outside the watering flower type recess again to accomplish the installation of rostone. Like this, utilize flower type recess to water the rostone diamond stone to satisfy the requirement of user to color and pattern.
Description
Technical field
The utility model relates to building material technical field, especially relates to a kind of man-made stone of field fabrication.
Background technology
Along with the continuous progress of science and technology, human living standard improves constantly, and people often can select artificial quartz in lump ground to carry out device to indoor.And in artificial quartz in lump ground construction technique, synthetic quartz slabstone is that factory is by fixed dimension prefabricated panels, artificial quartz in lump must be checked on-the-spot size before mating formation, setting-out is carried out according to on-the-spot size, on-site cutting and block-by-block numbering, this will cause spillage of material excessive, increase construction costs, and in the process of installing at the scene, due to manual process level, board quality and cementitious material and the factor such as sheet properties does not mate, easily cause and easily occur that hollowing and the large area caused come off in artificial quartz stone plate paving, cracking, bulge, the installation quality problems such as flexural deformation.For this reason, people design the artificial quartz in lump of field fabrication of knowing clearly.
The artificial quartz in lump of field fabrication is cleaning up and smooth layer of concrete waters artificial quartz in lump, thus solve above-mentioned technical problem.But the artificial quartz in lump of field fabrication is single on color and pattern, can not meet the demand of user.
Utility model content
The purpose of this utility model is the man-made stone providing field fabrication, single on color and pattern with the artificial quartz in lump solving the field fabrication existed in prior art, can not meet the technical problem of the demand of user.
The man-made stone of a kind of field fabrication that the utility model provides, comprising: infrastructure layer, leveling layer and synthetic quartz rock layers; Infrastructure layer is provided with leveling layer, leveling layer is provided with multiple dividing strip, multiple dividing strip surrounds the flower pattern groove for watering synthetic quartz rock layers.
Further, infrastructure layer is also provided with multiple parting seam, multiple parting seam is used for infrastructure layer to be divided into multiple basic blocks, each basic blocks is provided with one deck leveling layer, each leveling layer is provided with flower pattern groove.
Further, leveling layer upper surface is provided with confining bed, and confining bed is for the protection of leveling layer, and dividing strip is arranged on leveling layer by confining bed.
Further, dividing strip is plastic strip, stainless steel strip, aluminum strip or copper bar.
Further, infrastructure layer is provided with shrinkage joint, the V-shaped opening in upper end at shrinkage joint, is provided with epoxy resin mortar in shrinkage joint.
Further, infrastructure layer is also provided with quiet crack and dynamic crack; V-shaped groove mouth is all offered in the upper end in quiet crack and dynamic crack; Epoxy resin mortar is provided with in quiet crack; Be provided with elastic epoxy resin and particle size fiber engineering cloth in dynamic crack, elastic epoxy resin and particle size fiber engineering cloth continue cracking for stoping dynamic crack.
Further, the upper surface of synthetic quartz rock layers is provided with vitreous layer, and vitreous layer is for protecting synthetic quartz rock layers.
Further, infrastructure layer is layer of concrete.
Further, leveling layer is pea gravel concreten leveling layer.
Further, confining bed is epoxy primer confining bed.
The man-made stone of the field fabrication that the utility model provides, leveling layer is provided with multiple dividing strip, dividing strip is formed flower pattern groove, waters synthetic quartz rock layers in flower pattern groove.When user is when installing the man-made stone of the field fabrication that the utility model provides, first installation foundation deck, then utilizes leveling layer levelling to infrastructure layer.Afterwards, user can arrange difform flower pattern groove as required, and by the pouring of the synthetic quartz rock layers of different colours in flower pattern groove.After the synthetic quartz rock layers in flower pattern groove installs, then water the synthetic quartz rock layers outside flower pattern groove, thus complete the installation of man-made stone.Like this, utilize flower pattern groove to water artificial quartz in lump, thus meet the requirement of user to color and pattern.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model detailed description of the invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in detailed description of the invention or description of the prior art below, apparently, accompanying drawing in the following describes is embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The structural representation of the field fabrication that Fig. 1 provides for the utility model embodiment;
The structural representation of the infrastructure layer of the field fabrication that Fig. 2 provides for the utility model embodiment.
Reference numeral:
1-infrastructure layer; 2-leveling layer; 3-confining bed;
4-synthetic quartz rock layers; 5-vitreous layer; 11-shrinkage joint.
Detailed description of the invention
Be clearly and completely described the technical solution of the utility model below in conjunction with accompanying drawing, obviously, described embodiment is the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
In description of the present utility model, it should be noted that, orientation or the position relationship of the instruction such as term " " center ", " on ", D score, "left", "right", " vertically ", " level ", " interior ", " outward " they be based on orientation shown in the drawings or position relationship; be only the utility model and simplified characterization for convenience of description; instead of instruction or imply the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore can not be interpreted as restriction of the present utility model.In addition, term " first ", " second ", " the 3rd " only for describing object, and can not be interpreted as instruction or hint relative importance.
In description of the present utility model, it should be noted that, unless otherwise clearly defined and limited, term " installation ", " being connected ", " connection " should be interpreted broadly, and such as, can be fixedly connected with, also can be removably connect, or connect integratedly; Can be mechanical connection, also can be electrical connection; Can be directly be connected, also indirectly can be connected by intermediary, can be the connection of two element internals.For the ordinary skill in the art, concrete condition the concrete meaning of above-mentioned term in the utility model can be understood.
The structural representation of the field fabrication that Fig. 1 provides for the utility model embodiment.As shown in Figure 1, the man-made stone of a kind of field fabrication that the present embodiment provides, comprising: infrastructure layer 1, leveling layer 2 and synthetic quartz rock layers 4; Infrastructure layer 1 is provided with leveling layer 2, leveling layer 2 is provided with multiple dividing strip, multiple dividing strip surrounds the flower pattern groove for watering synthetic quartz rock layers 4.
Wherein, the material of dividing strip can be multiple, such as: dividing strip is plastic strip, stainless steel strip, aluminum strip or copper bar etc.
The shape of dividing strip can be multiple, such as: dividing strip can curved, waveform or linear etc.
The shape of flower pattern groove can be multiple, such as: petal, concave polygon, convex polygon, animals shaped or cartoon figure etc.Those skilled in the art can select the concrete shape of flower pattern groove according to actual needs.
The material of leveling layer 2 can be multiple, and preferably, leveling layer 2 is pea gravel concreten leveling layer 2
The material of infrastructure layer 1 can be multiple, and preferably, infrastructure layer 1 is layer of concrete
The color of artificial quartz in lump can be multiple, such as: redness, brown, white or grey etc.Those skilled in the art according to collocation of the shape of flower pattern groove and color etc., can select the color of artificial quartz in lump.Certainly, those skilled in the art can select single color, also can select multicolour.
When laying artificial quartz in lump, to go out to pave quartzy rock layers consumption according to design thickness (being generally 5mm-10mm) and areal calculation.Then stir in strict accordance with material mixture ratio and batch mixing order.
First by polymeric bonding material agent or inorganic adhesive and pigment (mill base or inorganic pigment) mixing and stirring.First quartz sand aggregate is put into after special quartz planetary stirring machine mixes, pour into after the polymeric bonding material agent that stirs or inorganic adhesive carry out stirring 1-3 minute again, then the powders such as quartz powder in grating are added in planetary stirring machine stir 3-5 minute.Stir after quartzy rock layers particles of aggregates be evenly distributed, colourless group, no color differnece.
After quartz aggregate stirs, special quartz paver is used evenly to be paved in infrastructure layer 1 by quartz aggregate with paving to harrow.Adopt vibration press to carry out vibroroller cmpacting to quartzy rock layers after aggregate paves floating, during vibroroller cmpacting, professional operator must be had to coordinate the laser rotary scanner of specialty to operate: the thickness and the planeness that 1. control compacting; 2. repair defective place and to carry out manual compacting floating to corner machinery something incosiderate, to ensure that quartzy rock layers is fine and close, within planeness reaches 2m ± 3mm, last compacted depth is advisable for exceeding design thickness 2-3mm.
During if any design, unwrapping wire on present leveling layer 2, according to the circuit of setting-out, fixes on the ground dividing strip, makes and fix design to form flower pattern groove by plastic strip, stainless steel strip, aluminum strip or copper bar.The harmony of lines of dividing strip and setting-out is ensured after repeatedly correcting.Dividing strip should draw 5 rice grain pattern ray examinations, and its deviation must not more than 1mm.Then be first laid in flower pattern groove by the above-mentioned artificial quartz in lump stirred, after the synthetic quartz rock layers 4 in flower pattern groove is solidified completely, re-lay flower pattern groove outer quartz rock layers, heterochromatic pattern separately paves.
The man-made stone that the present embodiment provides, leveling layer 2 is provided with multiple dividing strip, dividing strip is formed flower pattern groove, waters synthetic quartz rock layers 4 in flower pattern groove.When user is when installing the man-made stone that the present embodiment provides, first installation foundation deck 1, then utilizes leveling layer 2 pairs of infrastructure layer 1 levelling.Afterwards, user can arrange difform flower pattern groove as required, and the synthetic quartz rock layers 4 of different colours is watered and be filled in flower pattern groove.After the synthetic quartz rock layers 4 in flower pattern groove installs, then water the synthetic quartz rock layers 4 outside flower pattern groove, thus complete the installation of man-made stone.Like this, utilize flower pattern groove to water synthetic quartz rock layers 4, form design on the surface of man-made stone, make man-made stone more attractive in appearance, thus meet the requirement of user to color and pattern.
As shown in Figure 1, on the basis of above-described embodiment, further, infrastructure layer 1 is also provided with multiple parting seam, multiple parting seam is used for infrastructure layer 1 to be divided into multiple basic blocks, each basic blocks is provided with one deck leveling layer 2, each leveling layer 2 is provided with flower pattern groove.
When user is after making infrastructure layer 1, infrastructure layer 1 is manually separated into crisscross parting seam, and infrastructure layer 1 is separated into multiple basic blocks, thus be convenient to user make flower pattern groove in infrastructure layer 1, and then make the pattern of man-made stone more regular and attractive in appearance.
As shown in Figure 1, on the basis of above-described embodiment, further, leveling layer 2 upper surface is provided with confining bed 3, and confining bed 3 is for the protection of leveling layer 2, and dividing strip is arranged on leveling layer 2 by confining bed 3.
Wherein, the material of confining bed 3 can be multiple, and preferably, confining bed 3 is epoxy primer confining bed 3.
Used by epoxy primer cylinder or rubber sleaker to brush, carry out closed bottoming, and equating is carried out in local.Upon mixing, use moderate cylinder or scraper plate to sprawl at once, guarantee all surface coating evenly.For porous ground, need painting second time, first pass primary coat maintenance one night, then be coated with second time above.The brushing of primary coat need even, full, without holiday, free from admixture.
In the present embodiment, utilize epoxy primer that leveling layer 2 is closed bottoming, make the planarization ensureing ground before laying artificial quartz in lump, thus improve the planeness of the laying of artificial quartz in lump, but also the quality of man-made stone can be improved, increase the service life.
The structural representation of the infrastructure layer of the field fabrication that Fig. 2 provides for the utility model embodiment.As shown in Figure 2, on the basis of above-described embodiment, further, infrastructure layer 1 is provided with shrinkage joint 11, the V-shaped opening in upper end at shrinkage joint 11, is provided with epoxy resin mortar in shrinkage joint 11.
In the present embodiment, in order to avoid later stage infrastructure layer 1 when laying other layer ftractures, so, infrastructure layer 1 is provided with shrinkage joint 11, and is provided with epoxy resin mortar in shrinkage joint 11.Like this, when the later stage lays, the external force that infrastructure layer 1 is subject to can be cushioned by shrinkage joint 11, thus reduce the possibility of infrastructure layer 1 cracking, improve man-made stone quality, improve the make efficiency of man-made stone, shorten fabrication cycle, thus reduce cost of manufacture.
On the basis of above-described embodiment, further, infrastructure layer 1 is also provided with quiet crack and dynamic crack; V-shaped groove mouth is all offered in the upper end in quiet crack and dynamic crack; Epoxy resin mortar is provided with in quiet crack; Be provided with elastic epoxy resin and particle size fiber engineering cloth in dynamic crack, elastic epoxy resin and particle size fiber engineering cloth continue cracking for stoping dynamic crack.
During pouring concrete maintenance, for prevent from shrinking produce crack and people be stay cutting seam, concrete curing generation not in place crack, but crack stable no longer extend, when processing this kind of seam, only seam need be opened 45 ° of V-type notches, carry out repairing with epoxy resin mortar smooth.
Dynamic crack: crack is also in the state of motion, and there is the trend continuing expansion, extend, when crack is moved in process, crack is cut 45 ° of V-type notches, beat the hole of diameter 8-10mm at two, crack, carry out drawing process with the fiber engineering cloth of elastic epoxy resin and particle size.
The sander of the basal plane of satisfactory infrastructure layer 1 band vacuum cleaner is polished ground thoroughly, removes laitance and acarpous concrete surface layer, revise ground flat degree; Hollow and basic unit's broken parts are directly repaired with epoxy mortar.
In the present embodiment, V-type notch is offered in the upper end in quiet crack and dynamic crack, and epoxy resin mortar is provided with in quiet crack, the fiber engineering cloth of elastic epoxy resin and particle size is provided with in dynamic crack, thus improve the intensity of infrastructure layer 1, based on lay man-made stone and provide solid foundation, improve artificial quality and application life.
As shown in Figure 1, on the basis of above-described embodiment, further, the upper surface of synthetic quartz rock layers 4 is provided with vitreous layer 5, and vitreous layer 5 is for protecting synthetic quartz rock layers 4.
Quartz rock layers laid complete and maintenance after 72 hours, carried out grinding process with grinder.Edge Manual angular grinding machine is polished, and carries out planeness control simultaneously, within ensureing 3m guiding ruler 2mm.After having refined, surface must be smooth, smooth closely knit.
Bruting process is successively divided into corase grind (bistrique is respectively 50 orders, 100 orders, 150 orders), middle mill (bistrique is respectively 300 orders, 500 orders), fine grinding (bistrique is respectively 1000 orders and 1500 orders) and fine grinding (bistrique is respectively 2000 orders and 3000 orders) Four processes.Rough grinding pass can adopt diamond grinding head to carry out dry grinding and also can adopt resin abrasive disc water mill, until surface rubbing, mill are even, aggregate all exposes.Middle mill, fine grinding and fine grinding are all adopt resin abrasive disc water mill.Need after per pass technique for grinding completes with water cleaning and clean out with dust catcher.
During polishing, sander must be vacillated now to the left, now to the right, and uniform speed slow moves ahead, and can not stay in the polishing of same position, in order to avoid cause local collapse.Notice that planeness detects, if any higher position, what need emphasis to polish to planeness is up to standard.Grinding turn is: large face of first polishing, the more tiny position such as dividing strip of polishing, wall limit, post limit.
Complete cleaning ground at above technique for grinding and after bone dry, spray the super clean spar face agent of nanometer quartz at stone surface, then using the high-speed glazing machine being provided with wool pad to carry out crystal face vitreous process.Brilliant agent is become to be the liquid dispersion state structure of nanoscale SiO2 compound Ai2O3 crystal grain, the heat energy of polishing makes solvent volatilize, based on unique cohesive force of the outer oh group of crystalline state particle and under the effect protecting catalyzer in brilliant agent, combined closely in crystal grain and quartz top layer, form the SiO2-Ai2O3 rete of one deck densification, there is filling perforation, add lustre to, antifouling, wear-resisting feature.Crystal face glossiness is high, and average photometric reaches more than 85 degree, and has good mirror effect, more highlights the texture of stone material.
Osmosis type quartz specialty antifouling (anti-soil) agent is sprayed at stone surface again after vitreous process completes; after high speed polishing, stone material crystal face is effectively protected; resist the spots such as oil pen, ink, coffee, tea stain to corrode, extend the application life of stone material.
Last it is noted that above each embodiment is only in order to illustrate the technical solution of the utility model, be not intended to limit; Although be described in detail the utility model with reference to foregoing embodiments, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein some or all of technical characteristic; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the scope of each embodiment technical scheme of the utility model.
Claims (10)
1. a man-made stone for field fabrication, is characterized in that, comprising: infrastructure layer, leveling layer and synthetic quartz rock layers;
Described infrastructure layer is provided with leveling layer, described leveling layer is provided with multiple dividing strip, multiple described dividing strip surrounds the flower pattern groove for watering described synthetic quartz rock layers.
2. the man-made stone of field fabrication according to claim 1, it is characterized in that, described infrastructure layer is also provided with multiple parting seam, multiple described parting seam is used for described infrastructure layer to be divided into multiple basic blocks, each described basic blocks is provided with leveling layer described in one deck, each described leveling layer is provided with flower pattern groove.
3. the man-made stone of field fabrication according to claim 2, is characterized in that, described leveling layer upper surface is provided with confining bed, and described confining bed is for the protection of described leveling layer, and described dividing strip is arranged on described leveling layer by described confining bed.
4. the man-made stone of field fabrication according to claim 1, is characterized in that, described dividing strip is plastic strip, stainless steel strip, aluminum strip or copper bar.
5. the man-made stone of field fabrication according to claim 2, is characterized in that, described infrastructure layer is provided with shrinkage joint, and the V-shaped opening in upper end at described shrinkage joint, is provided with epoxy resin mortar in described shrinkage joint.
6. the man-made stone of field fabrication according to claim 1, is characterized in that, described infrastructure layer is also provided with quiet crack and dynamic crack;
V-shaped groove mouth is all offered in the upper end in described quiet crack and described dynamic crack; Epoxy resin mortar is provided with in described quiet crack;
Be provided with elastic epoxy resin and particle size fiber engineering cloth in described dynamic crack, described elastic epoxy resin and described particle size fiber engineering cloth continue cracking for stoping described dynamic crack.
7. the man-made stone of the field fabrication according to any one of claim 1-6, is characterized in that, the upper surface of described synthetic quartz rock layers is provided with vitreous layer, and described vitreous layer is for protecting described synthetic quartz rock layers.
8. the man-made stone of the field fabrication according to any one of claim 1-6, is characterized in that, described infrastructure layer is layer of concrete.
9. the man-made stone of the field fabrication according to any one of claim 1-6, is characterized in that, described leveling layer is pea gravel concreten leveling layer.
10. the man-made stone of field fabrication according to claim 3, is characterized in that, described confining bed is epoxy primer confining bed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520774729.4U CN204983547U (en) | 2015-09-30 | 2015-09-30 | Rostone of field fabrication |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520774729.4U CN204983547U (en) | 2015-09-30 | 2015-09-30 | Rostone of field fabrication |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204983547U true CN204983547U (en) | 2016-01-20 |
Family
ID=55117929
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520774729.4U Expired - Fee Related CN204983547U (en) | 2015-09-30 | 2015-09-30 | Rostone of field fabrication |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204983547U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121188A (en) * | 2016-08-24 | 2016-11-16 | 深圳市深装总装饰股份有限公司 | Large area is seamless overall ground and construction method thereof |
-
2015
- 2015-09-30 CN CN201520774729.4U patent/CN204983547U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121188A (en) * | 2016-08-24 | 2016-11-16 | 深圳市深装总装饰股份有限公司 | Large area is seamless overall ground and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100591878C (en) | Integral seamless grinding stone terrace manufacturing technique thereof | |
CN102518285B (en) | Old stone floor renovating method | |
CN106121188A (en) | Large area is seamless overall ground and construction method thereof | |
CN106836815A (en) | Large area diamond dust floor structure plate and surface layer one-off construction method | |
CN109826396A (en) | A kind of construction method of A grades of fire prevention artistic floors | |
CN109138354A (en) | Inorganic grinding stone terrace | |
CN105587102A (en) | Construction method of wet-on-wet paving type high abrasion resistance terrace | |
CN110230380A (en) | It is a kind of to pour the construction method for smashing integrated grinding stone terrace | |
CN211201040U (en) | Epoxy grindstone terrace application structure | |
CN113738082A (en) | Epoxy terrazzo wet-paving process | |
CN111962349A (en) | Wear-resistant concrete ground construction process | |
CN204983547U (en) | Rostone of field fabrication | |
CN105178562A (en) | Inorganic crystal grindstone integrated terrace system and construction process thereof | |
CN107642217A (en) | Efficient seamless stone level ground construction technology | |
CN208776593U (en) | A kind of polishing concrete decoration terrace | |
CN103510684B (en) | A kind of colored microlite terrace and its construction method | |
CN216921186U (en) | Ground structure of golden millstone | |
CN105544934B (en) | A kind of entirety flooring solidification construction method | |
CN206016165U (en) | Large area is seamless overall ground | |
CN107304632B (en) | Stone gum construction method | |
CN214144540U (en) | Novel ground grindstone structural system | |
CN214169786U (en) | Terrazzo floor used in shopping center | |
CN113482280A (en) | Tile joint filling process | |
KR20100035204A (en) | Constructive method of dry grinding bottom close material of building | |
CN221799025U (en) | Seamless grinding stone integral ground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160120 Termination date: 20170930 |
|
CF01 | Termination of patent right due to non-payment of annual fee |