CN204982687U - Novel arched bridge is consolidated device - Google Patents
Novel arched bridge is consolidated device Download PDFInfo
- Publication number
- CN204982687U CN204982687U CN201520528155.2U CN201520528155U CN204982687U CN 204982687 U CN204982687 U CN 204982687U CN 201520528155 U CN201520528155 U CN 201520528155U CN 204982687 U CN204982687 U CN 204982687U
- Authority
- CN
- China
- Prior art keywords
- bow member
- shaped steel
- bridge
- strengthening device
- pier cap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520528155.2U CN204982687U (en) | 2015-07-21 | 2015-07-21 | Novel arched bridge is consolidated device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520528155.2U CN204982687U (en) | 2015-07-21 | 2015-07-21 | Novel arched bridge is consolidated device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204982687U true CN204982687U (en) | 2016-01-20 |
Family
ID=55117069
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520528155.2U Active CN204982687U (en) | 2015-07-21 | 2015-07-21 | Novel arched bridge is consolidated device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204982687U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107841933A (en) * | 2017-12-08 | 2018-03-27 | 中水北方勘测设计研究有限责任公司 | A kind of Arch Bridges Strengthening method |
CN108797388A (en) * | 2018-06-26 | 2018-11-13 | 辽宁省交通规划设计院有限责任公司 | Improve Hollow Slab Beam Bridge reinforcement structure and its construction method |
CN114411472A (en) * | 2022-02-07 | 2022-04-29 | 中国建筑第八工程局有限公司 | Assembly type square ground structure on basement top plate and construction method thereof |
CN114922098A (en) * | 2022-05-07 | 2022-08-19 | 山东交通学院 | Stone arch bridge reinforcing device and method |
-
2015
- 2015-07-21 CN CN201520528155.2U patent/CN204982687U/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107841933A (en) * | 2017-12-08 | 2018-03-27 | 中水北方勘测设计研究有限责任公司 | A kind of Arch Bridges Strengthening method |
CN107841933B (en) * | 2017-12-08 | 2019-02-22 | 中水北方勘测设计研究有限责任公司 | A kind of Arch Bridges Strengthening method |
CN108797388A (en) * | 2018-06-26 | 2018-11-13 | 辽宁省交通规划设计院有限责任公司 | Improve Hollow Slab Beam Bridge reinforcement structure and its construction method |
CN108797388B (en) * | 2018-06-26 | 2024-02-27 | 辽宁省交通规划设计院有限责任公司 | Reinforcing structure for improving bearing capacity of hollow slab girder bridge and construction method thereof |
CN114411472A (en) * | 2022-02-07 | 2022-04-29 | 中国建筑第八工程局有限公司 | Assembly type square ground structure on basement top plate and construction method thereof |
CN114922098A (en) * | 2022-05-07 | 2022-08-19 | 山东交通学院 | Stone arch bridge reinforcing device and method |
CN114922098B (en) * | 2022-05-07 | 2023-08-22 | 山东交通学院 | Stone arch bridge reinforcing device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204982687U (en) | Novel arched bridge is consolidated device | |
CN102839675B (en) | Method of long-span pre-stress fish belly sill for foundation pit support | |
CN203700977U (en) | Spring supporting-jacking reinforcing structure used for improving shear resistance capacity of bridge | |
US10823150B2 (en) | Connecting structure for steel tube truss and tower barrel of lattice wind power generation tower, prestressed polygon wind tower provided with circular box girder for direct fan on top of tower, wind power generation tower, and wind tower having prestressed anti-fatigue structure | |
CN103334373B (en) | A kind of ribbed arch bridge Horizontal Seismic new structural system containing buckling restrained brace | |
CN203960725U (en) | A kind of assembly type suspension bridge | |
CN105369745A (en) | Bridge support exchanging and lifting reaction frame | |
CN203403558U (en) | Shear wall | |
CN203782542U (en) | Prestressed concrete box girder adopting corrugated steel webs | |
CN102704400A (en) | Tensioning method for prestressed concrete | |
CN215761716U (en) | Tunnel steel bow member supporting mechanism | |
CN203346779U (en) | Novel rib arch bridge transverse aseismic structure system with buckling restrained braces | |
CN204401464U (en) | A kind of construction of cast-in-place box girders construction bracket system | |
CN210368616U (en) | New and old bridge widening structure | |
CN204225897U (en) | A kind of support of tunnel structure | |
CN204040436U (en) | For the self-balancing steel builder's jack of overlength cantilevered structure framed bent construction | |
CN203846494U (en) | Breast beam soil anchor rod segmented connection structure | |
CN203200644U (en) | Double-arc-shaped bridge steel structure | |
CN205296579U (en) | Combination reinforcing bar girder construction | |
CN105060087A (en) | Rectangular tube truss without support | |
CN204126345U (en) | A kind of indoor coal storage yard | |
CN102914446A (en) | Box type bridge static loading test rack | |
CN211621607U (en) | Transverse connecting piece in prestressed truss type steel support | |
CN202994491U (en) | Box-type bridge static load testing stand | |
CN212452246U (en) | Support between pre-compaction steel pipe concrete rib |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190528 Address after: No. 89 round City West Road, Hangzhou, Zhejiang Province Patentee after: Zhejiang transportation planning and Design Research Institute Co., Ltd. Address before: 310013 Number Source Science Park, 170 Tianmushan Road, Xihu District, Hangzhou City, Zhejiang Province, 12 buildings 513 Patentee before: ZHEJIANG PROVINCE BESTWAY TRANSPORTATION HIGH-TECH CO., LTD. |
|
TR01 | Transfer of patent right | ||
CP03 | Change of name, title or address |
Address after: No.928 yuhangtang Road, Xihu District, Hangzhou City, Zhejiang Province Patentee after: Zhejiang shuzhijiaoyuan Technology Co.,Ltd. Address before: 310006 No. 89 West Ring Road, Zhejiang, Hangzhou Patentee before: ZHEJIANG PROVINCIAL INSTITUTE OF COMMUNICATIONS PLANNING DESIGN & RESEARCH Co.,Ltd. |
|
CP03 | Change of name, title or address |