CN204982634U - 一种新型输煤栈桥防冲洗水型式钢结构 - Google Patents

一种新型输煤栈桥防冲洗水型式钢结构 Download PDF

Info

Publication number
CN204982634U
CN204982634U CN201520351777.2U CN201520351777U CN204982634U CN 204982634 U CN204982634 U CN 204982634U CN 201520351777 U CN201520351777 U CN 201520351777U CN 204982634 U CN204982634 U CN 204982634U
Authority
CN
China
Prior art keywords
trestle
waterwall
truss web
floor
web member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520351777.2U
Other languages
English (en)
Inventor
武海杰
王秋红
刘小军
何延锋
王耀华
江宝钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Sinogy Electric Engineering Co Ltd
Original Assignee
China Sinogy Electric Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Sinogy Electric Engineering Co Ltd filed Critical China Sinogy Electric Engineering Co Ltd
Priority to CN201520351777.2U priority Critical patent/CN204982634U/zh
Application granted granted Critical
Publication of CN204982634U publication Critical patent/CN204982634U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本实用新型公开了一种新型输煤栈桥防冲洗水型式钢结构,包括栈桥墙面、栈桥楼板、桁架腹杆和挡水墙,所述栈桥墙面的内壁上设置桁架腹杆,所述栈桥墙面的底部设置栈桥楼板,且桁架腹杆的底部贯穿栈桥楼板并固定设置;所述桁架腹杆的内侧浇钢筋混凝土挡水墙,且挡水墙与栈桥楼板一体浇筑而成。将现浇的钢筋混凝土挡水墙设置在桁架腹杆的内侧,完全解除冲洗水对桁架腹杆的侵蚀,并且挡水墙的高度在墙体窗口的下沿以下,不影响采光。桁架腹杆虽然穿过楼板,但该位置被挡水墙隔开,输煤栈桥冲洗水无法到达此处,解决了传统钢结构输煤栈桥在此处的防水问题。

Description

一种新型输煤栈桥防冲洗水型式钢结构
技术领域
本实用新型涉及一种输煤栈桥,具体是一种新型输煤栈桥防冲洗水型式钢结构。
背景技术
在火力发电厂中,由于大跨度的要求,输煤栈桥往往采用桁架结构。普通钢结构输煤栈桥的楼面为了对冲洗水进行导流,保护压型钢板墙体不受水的侵袭,采用在腹杆外侧的楼板与墙体交接处,对楼板进行起反沿(100mm~200mm)处理。但是桁架腹杆的底部贯穿栈桥楼板并固定设置,冲洗水容易从桁架腹杆处渗漏,造成腐蚀。
实用新型内容
本实用新型的目的在于提供一种新型输煤栈桥防冲洗水型式钢结构,以解决上述背景技术中提出的问题。
为实现上述目的,本实用新型提供如下技术方案:
一种新型输煤栈桥防冲洗水型式钢结构,包括栈桥墙面、栈桥楼板、桁架腹杆和挡水墙,所述栈桥墙面的内壁上设置桁架腹杆,所述栈桥墙面的底部设置栈桥楼板,且桁架腹杆的底部贯穿栈桥楼板并固定设置;所述桁架腹杆的内侧浇钢筋混凝土挡水墙,且挡水墙与栈桥楼板一体浇筑而成。
作为本实用新型进一步的方案:所述栈桥墙面的顶部安装栈桥屋面。
作为本实用新型再进一步的方案:所述挡水墙的高度为500mm,厚度为100mm。
与现有技术相比,本实用新型的有益效果是:将现浇的钢筋混凝土挡水墙设置在桁架腹杆的内侧,完全解除冲洗水对桁架腹杆的侵蚀,并且挡水墙的高度在墙体窗口的下沿以下,不影响采光。桁架腹杆虽然穿过楼板,但该位置被挡水墙隔开,输煤栈桥冲洗水无法到达此处,解决了传统钢结构输煤栈桥在此处的防水问题。该挡水墙的高度接近窗台下沿,有效防止了冲洗水溅起的水花对压型钢板的栈桥墙面有害侵蚀作用,使栈桥墙面的耐久性更好。
附图说明
图1为本实用新型的结构示意图。
具体实施方式
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。
请参阅图1,本实用新型实施例中,一种新型输煤栈桥防冲洗水型式钢结构,包括栈桥墙面1、栈桥屋面2、栈桥楼板3、桁架腹杆4和挡水墙5,所述栈桥墙面1的内壁上设置桁架腹杆4,栈桥墙面1的顶部安装栈桥屋面2,所述栈桥墙面1的底部设置栈桥楼板3,且桁架腹杆4的底部贯穿栈桥楼板3并固定设置;
所述桁架腹杆4的内侧浇钢筋混凝土挡水墙5,且挡水墙5与栈桥楼板3一体浇筑而成,挡水墙5的高度为500mm,厚度为100mm。
将现浇的钢筋混凝土挡水墙5设置在桁架腹杆4的内侧,完全解除冲洗水对桁架腹杆4的侵蚀,并且挡水墙5的高度在墙体窗口的下沿以下,不影响采光。
挡水墙5虽然穿过楼板,但该位置被挡水墙5隔开,输煤栈桥冲洗水无法到达此处,解决了传统钢结构输煤栈桥在此处的防水问题。
该挡水墙5的高度接近窗台下沿,有效防止了冲洗水溅起的水花对压型钢板的栈桥墙面1有害侵蚀作用,使栈桥墙面1的耐久性更好。
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。

Claims (3)

1.一种新型输煤栈桥防冲洗水型式钢结构,包括栈桥墙面、栈桥楼板、桁架腹杆和挡水墙,其特征在于,所述栈桥墙面的内壁上设置桁架腹杆,所述栈桥墙面的底部设置栈桥楼板,且桁架腹杆的底部贯穿栈桥楼板并固定设置;所述桁架腹杆的内侧浇钢筋混凝土挡水墙,且挡水墙与栈桥楼板一体浇筑而成。
2.根据权利要求1所述的一种新型输煤栈桥防冲洗水型式钢结构,其特征在于,所述栈桥墙面的顶部安装栈桥屋面。
3.根据权利要求1所述的一种新型输煤栈桥防冲洗水型式钢结构,其特征在于,所述挡水墙的高度为500mm,厚度为100mm。
CN201520351777.2U 2015-05-27 2015-05-27 一种新型输煤栈桥防冲洗水型式钢结构 Expired - Fee Related CN204982634U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520351777.2U CN204982634U (zh) 2015-05-27 2015-05-27 一种新型输煤栈桥防冲洗水型式钢结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520351777.2U CN204982634U (zh) 2015-05-27 2015-05-27 一种新型输煤栈桥防冲洗水型式钢结构

Publications (1)

Publication Number Publication Date
CN204982634U true CN204982634U (zh) 2016-01-20

Family

ID=55117016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520351777.2U Expired - Fee Related CN204982634U (zh) 2015-05-27 2015-05-27 一种新型输煤栈桥防冲洗水型式钢结构

Country Status (1)

Country Link
CN (1) CN204982634U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193337A (zh) * 2016-08-31 2016-12-07 长沙远大住宅工业集团股份有限公司 叠合夹心墙侧墙与预制底板的连接节点
CN106193127A (zh) * 2016-08-31 2016-12-07 长沙远大住宅工业集团股份有限公司 叠合夹心墙侧墙与现浇底板的连接节点
CN114834859A (zh) * 2022-05-25 2022-08-02 华电重工股份有限公司 一种输煤栈桥清扫系统

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193337A (zh) * 2016-08-31 2016-12-07 长沙远大住宅工业集团股份有限公司 叠合夹心墙侧墙与预制底板的连接节点
CN106193127A (zh) * 2016-08-31 2016-12-07 长沙远大住宅工业集团股份有限公司 叠合夹心墙侧墙与现浇底板的连接节点
CN114834859A (zh) * 2022-05-25 2022-08-02 华电重工股份有限公司 一种输煤栈桥清扫系统
CN114834859B (zh) * 2022-05-25 2024-05-03 华电重工股份有限公司 一种输煤栈桥清扫系统

Similar Documents

Publication Publication Date Title
CN204982634U (zh) 一种新型输煤栈桥防冲洗水型式钢结构
CN103351769B (zh) 一种丙烯酸酯单组份防水涂料
CN204690679U (zh) 一种水电站上的缓冲回流式护坡
CN204571433U (zh) 防冲蚀硫酸槽
CN203878622U (zh) 一种地下室底板后浇带
CN204401907U (zh) 预制阳台檐口
CN205242873U (zh) 一种山墙挑檐
CN204212443U (zh) 一种建筑外墙阻水结构
CN104328793B (zh) 筏板结构
CN204225317U (zh) 干挂铝板幕墙节点连接结构
CN203145122U (zh) 一种排水管预埋座
CN202047537U (zh) 倒置式屋面沿沟结构
CN203977726U (zh) 一种钢结构厂房彩瓦包边排水结构
CN203924038U (zh) 一种建筑木桩安装结构
CN205259488U (zh) 一种用于连体建筑的屋面结构
CN204001479U (zh) 安装于房屋墙体上阳角的抗污构件
CN202866153U (zh) 钢结构雨棚
CN104975678A (zh) 一种防水隔音轻质隔墙板
CN203296218U (zh) 一种现场立模预制水泥砂浆墙面的轻质结构墙体
CN204385922U (zh) 卫生间防渗水施工结构
CN204626452U (zh) 地下结构预留洞口临时封堵结构
CN204626663U (zh) 一种新型家装工程中的防水结构
CN106149903B (zh) 一种幕墙首层与结构接驳位置处的防水板装置的使用方法
CN204475355U (zh) 封堵结构
CN203347080U (zh) 钢结构高低跨处低跨钢屋面节点构造

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Wu Haijie

Inventor after: Wang Qiuhong

Inventor after: Liu Xiaojun

Inventor after: He Yanfeng

Inventor after: Wang Yaohua

Inventor after: Jiang Baogang

Inventor before: Wu Haijie

Inventor before: Wang Qiuhong

Inventor before: Liu Xiaojun

Inventor before: He Yanfeng

Inventor before: Wang Yaohua

Inventor before: Jiang Baogang

COR Change of bibliographic data
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20200527

CF01 Termination of patent right due to non-payment of annual fee