CN204980839U CN201520640501.6U CN201520640501U CN204980839U CN 204980839 U CN204980839 U CN 204980839U CN 201520640501 U CN201520640501 U CN 201520640501U CN 204980839 U CN204980839 U CN 204980839U
Authority
CN
China
Prior art keywords
fixture block
suspender
box
block
chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520640501.6U
Other languages
Chinese (zh)
Inventor
张维刚
刘世奇
孙飞
王全伟
刘野
王可鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201520640501.6U priority Critical patent/CN204980839U/en
Application granted granted Critical
Publication of CN204980839U publication Critical patent/CN204980839U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an inboard top surface reinforcement girder hoist device of defeated coal strage way of box has solved the problem that will consolidate hole top surface that the steel I -beam hoisted the box plank road and meet difficulty. Include be provided with respectively in box plank road hole (2) before, the after -fixing support, in the front, all be connected with chain block on the after -fixing support, be provided with four hoist fixture blocks respectively on the bottom surface of box plank road hole (2), all be provided with I -steel joint groove (19) and lewis hole (20) on every hoist fixture block, the front end difference joint of I -steel (10) is on left front hoist fixture block (8) and right front hoist fixture block (9), the rear end difference joint of I -steel (10) is on left back hoist fixture block (16) and left back hoist fixture block (17), promotion steel chain on chain block (6) links together with the lewis hole on the hoist fixture block. The utility model discloses simple structure, convenient to use, it is with low costs.

Description

End face reinforcement hanging apparatus inside the defeated coal strage road of box-shaped
Technical field
The present invention relates to the hanging apparatus of the reinforcement of end face inside a kind of box-shaped coal transporting trestle.
Background technology
In thermal powerplant is produced, the coal transporting trestle of coal handling system is generally aerial construction, it is the major equipment for boiler of power plant transfer the fuel, the occupation of land of coal transporting trestle is larger, upgrade expanding due to some power plant is subject to the restriction of area occupied, existing defeated coal strage road is needed again to be planned to travel way, need to reinforce the inside top surface of existing box-shaped plank road, with satisfied driving requirement, the reinforcement means of normal employing installs at the endoporus end face of box-shaped plank road to reinforce steel I-beam, endoporus end face reinforcing steel I-beam being lifted into box-shaped plank road is needed to weld, due to the restriction of the endoporus by box-shaped plank road of existing hanging device, endoporus end face reinforcing steel I-beam being lifted into box-shaped plank road is met difficulty.
Summary of the invention
The invention provides end face reinforcement hanging apparatus inside the defeated coal strage road of a kind of box-shaped, solve the technical matters of being met difficulty by the endoporus end face that reinforcing steel I-beam is lifted into box-shaped plank road.
The present invention solves above technical matters by the following technical programs:
End face reinforcement hanging apparatus inside a kind of defeated coal strage road of box-shaped, comprise box-shaped plank road, fixed support and rear fixed support before being respectively arranged with in box-shaped plank road endoporus, front fixed support is respectively arranged with left front suspender fixed orifice and right front suspender fixed orifice, rear fixed support is respectively arranged with left back suspender fixed orifice and right back suspender fixed orifice, left front suspender fixed orifice is connected with left front chain block, right front suspender fixed orifice is connected with right front chain block, left back suspender fixed orifice is connected with left back chain block, right back chain block is connected with in right back suspender fixed orifice, the bottom surface of box-shaped plank road endoporus is respectively arranged with left front suspender fixture block, right front suspender fixture block, left back suspender fixture block and right back suspender fixture block, every block suspender fixture block is provided with I-beam section buckling groove and lifting hole(eyelet), the front end of I-beam section is connected on left front suspender fixture block and right front suspender fixture block respectively, the rear end of I-beam section is connected on left back suspender fixture block and right back suspender fixture block respectively, lifting hole(eyelet) on lifting steel chain on left front chain block and left front suspender fixture block links together, lifting hole(eyelet) on lifting steel chain on right front chain block and right front suspender fixture block links together, lifting hole(eyelet) on lifting steel chain on left back chain block and left back suspender fixture block links together, lifting hole(eyelet) on lifting steel chain on right back chain block and right back suspender fixture block links together.
The bottom surface lifting the I-beam section put in place is supported with support steel beam.
Structure of the present invention is simple, and easy to use, cost is low.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention in front apparent direction;
Fig. 2 is the structural representation of the present invention in rear apparent direction;
Fig. 3 is the fiting relation figure of suspender fixture block of the present invention and I-beam section 10.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in detail:
End face reinforcement hanging apparatus inside a kind of defeated coal strage road of box-shaped, comprise box-shaped plank road 1, fixed support 3 and rear fixed support 11 before being respectively arranged with in box-shaped plank road endoporus 2, front fixed support 3 is respectively arranged with left front suspender fixed orifice 4 and right front suspender fixed orifice 5, rear fixed support 11 is respectively arranged with left back suspender fixed orifice 12 and right back suspender fixed orifice 13, left front suspender fixed orifice 4 is connected with left front chain block 6, right front suspender fixed orifice 5 is connected with right front chain block 7, left back suspender fixed orifice 12 is connected with left back chain block 14, right back chain block 15 is connected with in right back suspender fixed orifice 13, the bottom surface of box-shaped plank road endoporus 2 is respectively arranged with left front suspender fixture block 8, right front suspender fixture block 9, left back suspender fixture block 16 and right back suspender fixture block 17, every block suspender fixture block is provided with I-beam section buckling groove 19 and lifting hole(eyelet) 20, the front end of I-beam section 10 is connected on left front suspender fixture block 8 and right front suspender fixture block 9 respectively, the rear end of I-beam section 10 is connected on left back suspender fixture block 16 and right back suspender fixture block 17 respectively, lifting hole(eyelet) on lifting steel chain on left front chain block 6 and left front suspender fixture block 8 links together, lifting hole(eyelet) on lifting steel chain on right front chain block 7 and right front suspender fixture block 9 links together, lifting hole(eyelet) on lifting steel chain on left back chain block 14 and left back suspender fixture block 16 links together, lifting hole(eyelet) on lifting steel chain on right back chain block 15 and right back suspender fixture block 17 links together.By the chain block straining four orientation make suspender card fast on I-beam section slowly rise, finally arrive fastening height, and carry out positioning welding.
The bottom surface lifting the I-beam section 10 put in place is supported with support steel beam 18.

Claims (2)

1. end face reinforcement hanging apparatus inside the defeated coal strage road of box-shaped, comprise box-shaped plank road (1), front fixed support (3) and rear fixed support (11) is respectively arranged with in box-shaped plank road endoporus (2), front fixed support (3) is respectively arranged with left front suspender fixed orifice (4) and right front suspender fixed orifice (5), rear fixed support (11) is respectively arranged with left back suspender fixed orifice (12) and right back suspender fixed orifice (13), left front suspender fixed orifice (4) is connected with left front chain block (6), right front suspender fixed orifice (5) is connected with right front chain block (7), left back suspender fixed orifice (12) is connected with left back chain block (14), right back chain block (15) is connected with in right back suspender fixed orifice (13), it is characterized in that, the bottom surface of box-shaped plank road endoporus (2) is respectively arranged with left front suspender fixture block (8), right front suspender fixture block (9), left back suspender fixture block (16) and right back suspender fixture block (17), every block suspender fixture block is provided with I-beam section buckling groove (19) and lifting hole(eyelet) (20), the front end of I-beam section (10) is connected on left front suspender fixture block (8) and right front suspender fixture block (9) respectively, the rear end of I-beam section (10) is connected on left back suspender fixture block (16) and right back suspender fixture block (17) respectively, lifting hole(eyelet) on lifting steel chain on left front chain block (6) and left front suspender fixture block (8) links together, lifting hole(eyelet) on lifting steel chain on right front chain block (7) and right front suspender fixture block (9) links together, lifting hole(eyelet) on lifting steel chain on left back chain block (14) and left back suspender fixture block (16) links together, lifting hole(eyelet) on lifting steel chain on right back chain block (15) and right back suspender fixture block (17) links together.
2. end face reinforcement hanging apparatus inside the defeated coal strage road of a kind of box-shaped according to claim 1, is characterized in that, the bottom surface lifting the I-beam section (10) put in place is supported with support steel beam (18).
CN201520640501.6U 2015-08-24 2015-08-24 Inboard top surface reinforcement girder hoist device of defeated coal strage way of box Withdrawn - After Issue CN204980839U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520640501.6U CN204980839U (en) 2015-08-24 2015-08-24 Inboard top surface reinforcement girder hoist device of defeated coal strage way of box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520640501.6U CN204980839U (en) 2015-08-24 2015-08-24 Inboard top surface reinforcement girder hoist device of defeated coal strage way of box

Publications (1)

Publication Number Publication Date
CN204980839U true CN204980839U (en) 2016-01-20

Family

ID=55115229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520640501.6U Withdrawn - After Issue CN204980839U (en) 2015-08-24 2015-08-24 Inboard top surface reinforcement girder hoist device of defeated coal strage way of box

Country Status (1)

Country Link
CN (1) CN204980839U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105152004A (en) * 2015-08-24 2015-12-16 中铁十九局集团第六工程有限公司 Hoisting device for reinforcing beam of top surface inside box-shaped coal conveying gallery road

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105152004A (en) * 2015-08-24 2015-12-16 中铁十九局集团第六工程有限公司 Hoisting device for reinforcing beam of top surface inside box-shaped coal conveying gallery road
CN105152004B (en) * 2015-08-24 2017-04-19 中铁十九局集团第六工程有限公司 Hoisting device for reinforcing beam of top surface inside box-shaped coal conveying gallery road

Similar Documents

Publication Publication Date Title
CN103669216A (en) Steel box girder scattered-splicing sliding device and installation method
CN102140779B (en) Movable cast-in-situ support and movable construction method of box girder cast-in-situ support
CN105484162B (en) Suspension bridge construction stiff girder secondary on the bank swings moving device and method
CN201635012U (en) Bridge box girder erection machine
CN102127987B (en) Guide rail system for assembling flange connection tower sections of power transmission line iron tower through helicopter
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN103669218B (en) Novel steel-concrete combined section steel box girder module and assembling method thereof
CN209144659U (en) A kind of modular support system being adapted to SPMT vehicle group
CN105152004A (en) Hoisting device for reinforcing beam of top surface inside box-shaped coal conveying gallery road
CN102817342A (en) Construction technology of in-situ assembly under pile foundation construction platform of double-wall steel cofferdam
CN204980839U (en) Inboard top surface reinforcement girder hoist device of defeated coal strage way of box
CN203419675U (en) Traveling track for girder crane
CN203461693U (en) Ultrahigh steel support leg for combined gantry crane with Bailey truss
CN205241086U (en) Template hoist and mount and ann gun carriage of disassembling and using
CN202130527U (en) Auxiliary vehicle device of novel beam transport car
CN204151665U (en) A kind of cable-stayed type opens trestle
CN201605110U (en) Device for hoisting waveform steel webs at the front end of truss in cantilever construction
CN107988909B (en) Railway is just roof beam rapid transit erects and uses trailer
CN102108801A (en) Guide rail system for use on end part of cross arms of helicopter-assembled power transmission line iron tower
CN202337945U (en) Outer side in-place beam body lifting device
CN205838319U (en) A kind of integral lifting device of emergency mobile diesel generating set
CN205369040U (en) Suspension bridge is under construction on bank stiffening beam secondary and is swung and move device
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN203782573U (en) Drag runway structure for erecting steel pipe arch bridge
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160120

Effective date of abandoning: 20170419