CN204980156U - Power supply unit of coal tower gyration feed - Google Patents
Power supply unit of coal tower gyration feed Download PDFInfo
- Publication number
- CN204980156U CN204980156U CN201520777314.2U CN201520777314U CN204980156U CN 204980156 U CN204980156 U CN 204980156U CN 201520777314 U CN201520777314 U CN 201520777314U CN 204980156 U CN204980156 U CN 204980156U
- Authority
- CN
- China
- Prior art keywords
- feed
- motor
- coal
- carbon brush
- trolley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a power supply unit of coal tower gyration feed, clock body guard shield is equipped with to the below of feed dolly one end, material feeding unit is installed to the top, the other end of feed dolly is installed the feed motor and is walked capable motor, walk capable motor and set up on the rail, the feed motor with walk capable motor and pass through the power cord and be connected with the current collector carbon brush, the current collector carbon brush passes through the wiping line and is connected with the power. The wiping line is installed alone outside coal tower gyration feed dolly, draw to get off to be connected to by the power cord and walk capable motor and feed motor on the feed dolly, therefore can not take place the raw materials coal because of ooze the coal, the chute blockage leads to short circuit or circular motion non -synchronous phenomenon. Wiping line, the dismouting of current collector carbon brush are simple, and the point can audio -visually be seen when examining and measure running state, can not influence production during the overhaul of the equipments.
Description
Technical field
The utility model relates to coal tower feeding device in Ferrous Metallurgy coke oven, particularly the electric supply installation of coal tower revolution feed.
Background technology
The coal feed process of coking by coke oven is the important component part that coking chemical is produced.Standby coal operation press processing compound, and after the coal feeding coal tower prepared, and by coal tower feeding device coal carried in an orderly manner the feed bin under coal supply tower, charging car takes out appropriate shove charge coal and carries out follow-up coking process under arriving coal tower more according to plan.
In whole technological process, due to the shove charge coal after various feed coal and preparation, all there is the physical propertys such as cohesiveness, grain size, moisture, volatile matter, metamorphic grade, coke-oven coal tower there will be the phenomenon such as bridging, scaffold, sticky wall, delay, feed bin blocking, under causing coal difficulty, coalingging has some setbacks, affect coke oven balanced, this situation is especially more outstanding in rainy season.And reduce the revolution on coal tower to the fault of trolley with significantly reduce fault handling time, key role is served to the equilibrium of guarantee coke oven.
It is adopt slip ring and carbon brush power supply mode that existing coal tower turns round to trolley.That is: with the power supply mode using carbon brush fixture block to clamp copper slip ring, drive running motor action, make to trolley traveling in fixing circular orbit, simultaneously copper slip ring is powered and to be moved reciprocatingly to the feed motor be arranged on dolly, makes dolly can evenly back and forth blanking while circular movement on rail.Because carbon brush and slip ring are placed on the heavy clock body rotating shroud inside that one carries threading aperture, and the aperture on clock body penetrates for the power lead from power distribution station, is connected respectively on six carbon brush, to keep the driving of running motor and feed motor.The communication port position walking power lead due to clock body guard shield is packing less, operation hours one is long, from the coal overheap that power lead communication port infilters, when coal viscosity is combined into greatly relatively large shape, easily making on the one hand is obstructed when internal copper slip ring does circumference rotation causes load to become large, even causes short circuit between lock; On the other hand clamp because inner chute blockage too much can increase fixture block the load that annulus moves in a circle, make the circular movement in clock body guard shield asynchronous to the motion of the big circumference of trolley with revolution, even drawing crack power connector end, causes larger heavy fault.And this electric supply installation, after a period of time is run, the long-time wearing and tearing between its carbon brush fixture block and copper slip ring, can make copper coin ring or fixture block distortion, depart from original track, easily cause motor phase failure to run.Add copper coin ring, fixture block, power connector end etc. in device by feed coal medium sulphide content, muriatic corrosion oxidation, conducting position bad contact can be made, can not normally start and stop and losing efficacy.And when keeping in repair, then need overall pulling down clock body guard shield, and check that inside, replacing carbon brush or copper slip ring are all very difficult, need the work capacity costed a lot of money, time-consuming.So, once et out of order will have a strong impact on coke oven balanced production.
Utility model content
For the problems referred to above, the utility model provides a kind of coal tower to turn round the electric supply installation of feed, can change spare part under the prerequisite not affecting production, significantly reduces the time and the labour intensity that need to spend a large amount of stop production to overhaul when power supply trouble occurs for it, increase work efficiency, ensure the normal production of coke oven.
The utility model realizes above-mentioned purpose by the following technical solutions.The electric supply installation of coal tower revolution feed, to the below of trolley one end, clock body guard shield is housed, top is provided with pay-off, to the other end of trolley, feed motor and running motor are installed, running motor is arranged on rail, feed motor is connected with current colector carbon brush by power lead with running motor, and current colector carbon brush is connected with power supply by trolley.
The beneficial effects of the utility model are, trolley is arranged separately in coal tower and turns round to outside trolley, being drawn by power lead gets off to be connected to the running motor on trolley and feed motor, therefore feed coal can not occur because oozing coal, chute blockage and cause short circuit or the nonsynchronous phenomenon of circular movement.Trolley is safe and reliable, can not be out of shape cause phase shortage because of long-time wearing and tearing.The material of trolley is owing to directly can not contact with feed coal, and the oxidation that can not be corroded causes bad contact.Trolley, the dismounting of current colector carbon brush simply, can be seen intuitively and measure running state during spot check, can not affect production during overhaul of the equipments.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is birds-eye view of the present utility model.
In figure: 1. clock body guard shield, 2. trolley, 3. current colector carbon brush, 4. power lead, 5. feed motor, 6. running motor, 7. rail, 8. give trolley, 9. pay-off.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.See Fig. 1 and Fig. 2, the electric supply installation of coal tower revolution feed, to the below of trolley 8 one end, clock body guard shield 1 is housed, top is provided with pay-off 9, to the other end of trolley 8, feed motor 5 and running motor 6 are installed, running motor 6 is arranged on rail 7, and feed motor 5 is connected with current colector carbon brush 3 by power lead 4 with running motor 6, and current colector carbon brush 3 is connected with power supply by trolley 2.
Turn round to the trolley 2 of the work stall roof of trolley fixed installation six roots of sensation annular at coal tower, trolley 2 is connected with power lead 4, realizes two groups of power supply supply running motors 6 and feed motor 5 around the power supply mode that trolley 2 moves with current colector carbon brush 3.After the coal prepared sends into coal tower, coal tower turns round the feed bin carried in an orderly manner to trolley under coal supply tower, running motor 6 drives and to trolley 8, clock body guard shield 1 is housed around below and rotates and according to the orbital motion of rail 7, feed motor 5 drives pay-off 9 to carry coal charge.
embodiment:now introduce a better embodiment of the present utility model.The electric supply installation of coal tower revolution feed, wherein, Y160M2-65.5KW selected by feed motor 5, and running motor 6 selects Y132M2-65.5kw.The trolley 2 of six roots of sensation annular is fixedly welded on the preset steel structure on roof.Common easily changeable TRTIII type selected by current colector carbon brush 3, is arranged on on the fixed support of trolley 8 one end welding, and keeps certain contact position with trolley 2.The power cable of two VV3*4+1*2.5 selected by power lead 4, from being welded in support bracket fastened galvanized pipe after poling, then connects the electric source connecting box of feeding material motor 5 and running motor 6 respectively.
Claims (1)
1. the electric supply installation of coal tower revolution feed, to the below of trolley one end, clock body guard shield is housed, top is provided with pay-off, to the other end of trolley, feed motor and running motor are installed, running motor is arranged on rail, it is characterized in that, feed motor is connected with current colector carbon brush by power lead with running motor, and current colector carbon brush is connected with power supply by trolley.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520777314.2U CN204980156U (en) | 2015-10-09 | 2015-10-09 | Power supply unit of coal tower gyration feed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520777314.2U CN204980156U (en) | 2015-10-09 | 2015-10-09 | Power supply unit of coal tower gyration feed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204980156U true CN204980156U (en) | 2016-01-20 |
Family
ID=55114547
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520777314.2U Active CN204980156U (en) | 2015-10-09 | 2015-10-09 | Power supply unit of coal tower gyration feed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204980156U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109226709A (en) * | 2018-10-26 | 2019-01-18 | 山东钢铁集团日照有限公司 | A kind of online slab transfer cart power of conticaster is superimposed conduction device with communication |
CN111653911A (en) * | 2020-05-25 | 2020-09-11 | 湖北三江航天万峰科技发展有限公司 | Current collector, electric equipment, sectional type mobile power supply device and method |
-
2015
- 2015-10-09 CN CN201520777314.2U patent/CN204980156U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109226709A (en) * | 2018-10-26 | 2019-01-18 | 山东钢铁集团日照有限公司 | A kind of online slab transfer cart power of conticaster is superimposed conduction device with communication |
CN111653911A (en) * | 2020-05-25 | 2020-09-11 | 湖北三江航天万峰科技发展有限公司 | Current collector, electric equipment, sectional type mobile power supply device and method |
CN111653911B (en) * | 2020-05-25 | 2021-08-27 | 湖北三江航天万峰科技发展有限公司 | Current collector, electric equipment, sectional type mobile power supply device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207304457U (en) | A kind of photovoltaic power generation apparatus | |
CN204980156U (en) | Power supply unit of coal tower gyration feed | |
CN206254017U (en) | Pipeline outer wall derusting device | |
CN103056132B (en) | Automatic cleaning device of insulator for artificial contamination test | |
CN203068402U (en) | High-daylighting solar street light | |
CN210279998U (en) | Portable insulator cleaning device | |
CN217590183U (en) | Transmission line icing removing device | |
CN103204368A (en) | Spiral cleaning device | |
CN203922331U (en) | Twine pipe car | |
CN105268671B (en) | Adhesion type insulator body cleaning device | |
CN203265450U (en) | Punch press waste material automatic recovery system | |
CN210635260U (en) | Paper tube or spinning cake transfer device | |
CN204491504U (en) | A kind of semi-automatic moss scavenger along the river | |
CN203246835U (en) | Spiral cleaning device | |
CN217894216U (en) | Coal device is scraped to colliery belt feeder tail that can maintain | |
CN206211240U (en) | A kind of slip ring and rotor outgoing cable mounting structure | |
CN205681018U (en) | A kind of distribution line cleaning device | |
CN212275272U (en) | Coke sampling device | |
CN207579624U (en) | Vertical circulation stereo garage and its charging pile power supply connecting mechanism | |
CN213619695U (en) | Be used for colliery transport vechicle residual cleaning device | |
CN203722181U (en) | A special full-automatic cable winch for a downhole television | |
CN209777738U (en) | Rotary distributor convenient to hoist and mount transportation | |
CN210404286U (en) | Safe lapping device for coke quenching car current collector and sliding contact line | |
CN212863286U (en) | Synchronous dust extraction of multipolar safe slide-wire | |
CN108879470B (en) | Cable foreign matter cleaning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |