CN204960504U - Gardens are with installing guardrail fast - Google Patents

Gardens are with installing guardrail fast Download PDF

Info

Publication number
CN204960504U
CN204960504U CN201520752179.6U CN201520752179U CN204960504U CN 204960504 U CN204960504 U CN 204960504U CN 201520752179 U CN201520752179 U CN 201520752179U CN 204960504 U CN204960504 U CN 204960504U
Authority
CN
China
Prior art keywords
shackle member
card interface
horizontal bar
fast installation
gardens
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520752179.6U
Other languages
Chinese (zh)
Inventor
徐玲玲
金春茂
金丽娜
童东福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Yuan Jing Built Environment Co Ltd
Original Assignee
Hangzhou Yuan Jing Built Environment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Yuan Jing Built Environment Co Ltd filed Critical Hangzhou Yuan Jing Built Environment Co Ltd
Priority to CN201520752179.6U priority Critical patent/CN204960504U/en
Application granted granted Critical
Publication of CN204960504U publication Critical patent/CN204960504U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a gardens are with installing guardrail fast has solved the low and inconvenient problem of dismouting of current guardrail security, and its technical scheme main points are including the stake, go up horizontal bar, horizontal bar and vertical stroke fence down, upward be provided with first joint mouth and second joint mouth on horizontal bar and the lower horizontal bar respectively, be provided with first joint spare and second joint spare on the perpendicular fence, anatrepsis went up horizontal bar and the fixed fence that erects of lower horizontal bar after first joint mouth and second joint mouth passed first joint spare and second joint spare respectively, the both ends of last horizontal bar, lower horizontal bar can be dismantled fixed connection and on the stake, reached simple structure, simple to operate, the swift and high effect of security.

Description

Gardens Fast Installation guardrail
Technical field
The utility model relates to a kind of guardrail, and more particularly, it relates to a kind of gardens Fast Installation guardrail.
Background technology
Gardens guardrail plays an important role in protection gardens are not damaged, and guardrail connects composition primarily of pile, the perpendicular parts such as hurdle, horizontal bar.It connects assembling form primarily of following two kinds of forms: 1, board plug type connector: board plug type connector is mounted on perpendicular hurdle, and be positioned at the outside of horizontal bar, when horizontal bar be subject to external force deformation bending after, plate on perpendicular hurdle can take off, perpendicular hurdle is taken out from horizontal bar, such fence is just damaged, and has potential safety hazard.2, welded type connects: transport material to job site by construction corps, carry out Site Welding installation, intersects owing to often mixing with other work post and operation in welded and installed process.Therefore, this traditional Site Welding installs quality, quality and the outward appearance that both cannot ensure railing, takes a lot of work again, requires great effort, time-consuming, and operating efficiency is low, and maintenance is also inconvenient in the future.
Utility model content
For the deficiency that prior art exists, the purpose of this utility model is to provide a kind of gardens Fast Installation guardrail, and it is to solve the problem that existing guardrail safety is low and dismounting is inconvenient.
For achieving the above object, the utility model provides following technical scheme: a kind of gardens Fast Installation guardrail, comprise pile, upper rail, bottom rail and perpendicular hurdle, described upper rail and bottom rail are respectively arranged with the first card interface and the second card interface, described perpendicular hurdle is provided with the first shackle member and the second shackle member, described first card interface and the second card interface be reverse mobile upper rail and the fixing perpendicular hurdle of bottom rail after being each passed through the first shackle member and the second shackle member, and the two ends of described upper rail, bottom rail are detachably fixedly connected on pile.
The utility model is set to further: described first shackle member and the second shackle member have included connector and shackle member.
The utility model is set to further: described first shackle member and the second shackle member are all in L-shaped structure, and the direction of described first shackle member and the second shackle member is contrary.
The utility model is set to further: described connector and shackle member are two vertically disposed straight plates, and described first shackle member and the second shackle member are fixedly connected on perpendicular hurdle.
The utility model is set to further: described first shackle member and the second shackle member are all arranged in bolt shape, and described connector is a joint pin, and described shackle member is a nut.
The utility model is set to further: described first card interface and the second card interface include the through hole and chute that are communicated with, and described through hole can pass for bolt, and the width of described chute is identical with the diameter of joint pin.
The utility model is set to further: described joint pin is a threaded column, and described first shackle member and the second shackle member are threaded with perpendicular hurdle.
The utility model is set to further: described upper rail, be bolted between bottom rail and pile.
In sum, the utility model gardens Fast Installation guardrail is by after being each passed through the first card interface and the second card interface by the first shackle member and the second shackle member, reverse mobile upper rail and bottom rail, the first shackle member and the second shackle member is made to block fixing by perpendicular hurdle, now more upper and lower horizontal bar is installed to the installation that pile can realize guardrail, this makes install or dismantle very convenient, quick; And guardrail after the installing perpendicular hurdle on it, upper and lower horizontal bar all not easily disassemble, safety is high.
Accompanying drawing explanation
Fig. 1 is the structural representation of gardens Fast Installation guardrail;
Fig. 2 is the structural representation of the embodiment one of gardens Fast Installation guardrail;
Fig. 3 is the structural representation of the embodiment one on perpendicular hurdle;
Fig. 4 is the structural representation of the embodiment two of gardens Fast Installation guardrail;
Fig. 5 is the structural representation of the embodiment two on perpendicular hurdle.
Reference numeral: 1, pile; 2, perpendicular hurdle; 21, the first shackle member; 22, the second shackle member; 3, upper rail; 31, the first card interface; 4, bottom rail; 41, the second card interface.
Detailed description of the invention
Referring to figs. 1 through Fig. 5, the utility model gardens Fast Installation guardrail is described further.
Be a kind of embodiment of the utility model gardens Fast Installation guardrail as shown in Figure 1 to Figure 3, it comprises pile 1, upper rail 3, bottom rail 4 and perpendicular hurdle 2, upper rail 3 and bottom rail 4 are respectively arranged with the first card interface 31 and the second card interface 41, first card interface 31 and the second card interface 41 are all set to several, and be evenly distributed, perpendicular hurdle 2, first card interface 31 is identical with the quantity of the second card interface 41, perpendicular hurdle 2 is provided with the first shackle member 21 and the second shackle member 22, first shackle member 21 and the second shackle member 22 and has included connector and shackle member.
After the first shackle member 21 and the second shackle member 22 are each passed through the first card interface 31 and the second card interface 41, reverse mobile upper rail 3 and bottom rail 4 are namely by the fixing perpendicular hurdle 2 of shackle member, the two ends of upper rail 3, bottom rail 4 are detachably fixedly connected on pile 1, upper rail 3 in the utility model, to be bolted between bottom rail 4 and pile 1, bolt installation easy to connect and the detachable maintaining in later stage.
In the present embodiment, the first shackle member 21 and the second shackle member 22 are all in L-shaped structure, and the direction of the first shackle member 21 and the second shackle member 22 is contrary.Wherein, connector and shackle member are two vertically disposed straight plates, and connector and shackle member are wholely set, and the first shackle member 21 is fixedly connected with on perpendicular hurdle 2 with the second shackle member 22.
Mounting method: the two ends of upper rail 3 are first arranged on pile 1, again multiple perpendicular hurdle 2 is arranged on upper rail 3 by the first shackle member 21, after installing perpendicular hurdle 2, bottom rail 4 is connected with perpendicular hurdle 2, on move or move down bottom rail 4 and make it relative with the screwed hole on pile 1, can realize installing by bolt upper rail 3 being fixed on pile 1.
As Fig. 1, Fig. 4 and the another kind of embodiment that Figure 5 shows that the utility model gardens Fast Installation guardrail, it comprises pile 1, upper rail 3, bottom rail 4 and perpendicular hurdle 2, upper rail 3 and bottom rail 4 are respectively arranged with the first card interface 31 and the second card interface 41, first card interface 31 and the second card interface 41 are all set to several, and be evenly distributed, perpendicular hurdle 2, first card interface 31 is identical with the quantity of the second card interface 41, perpendicular hurdle 2 is provided with the first shackle member 21 and the second shackle member 22, first shackle member 21 and the second shackle member 22 have included connector and shackle member.
After the first shackle member 21 and the second shackle member 22 are each passed through the first card interface 31 and the second card interface 41, reverse mobile upper rail 3 and bottom rail 4 are namely by the fixing perpendicular hurdle 2 of shackle member, the two ends of upper rail 3, bottom rail 4 are detachably fixedly connected on pile 1, upper rail 3 in the utility model, to be bolted between bottom rail 4 and pile 1, bolt installation easy to connect and the detachable maintaining in later stage.
In the present embodiment, the first shackle member 21 and the second shackle member 22 are all arranged in bolt shape, and connector is a joint pin, and shackle member is a nut, and joint pin and nut are in being wholely set.First card interface 31 includes with the second card interface 41 through hole and chute that are communicated with, and through hole can pass for bolt, and the width of chute is identical with the diameter of joint pin.
Wherein, joint pin is a threaded column, and the first shackle member 21 and the second shackle member 22 are threaded with perpendicular hurdle 2.
Mounting method is the same.
The above is only preferred embodiment of the present utility model, protection domain of the present utility model be not only confined to above-described embodiment, and all technical schemes belonged under the utility model thinking all belong to protection domain of the present utility model.It should be pointed out that for those skilled in the art, do not departing from the some improvements and modifications under the utility model principle prerequisite, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (8)

1. a gardens Fast Installation guardrail, comprise pile, upper rail, bottom rail and perpendicular hurdle, it is characterized in that: described upper rail and bottom rail are respectively arranged with the first card interface and the second card interface, described perpendicular hurdle is provided with the first shackle member and the second shackle member, described first card interface and the second card interface be reverse mobile upper rail and the fixing perpendicular hurdle of bottom rail after being each passed through the first shackle member and the second shackle member, and the two ends of described upper rail, bottom rail are detachably fixedly connected on pile.
2. gardens according to claim 1 Fast Installation guardrail, is characterized in that: described first shackle member and the second shackle member have included connector and shackle member.
3. gardens according to claim 2 Fast Installation guardrail, is characterized in that: described first shackle member and the second shackle member are all in L-shaped structure, and the direction of described first shackle member and the second shackle member is contrary.
4. gardens according to claim 3 Fast Installation guardrail, is characterized in that: described connector and shackle member are two vertically disposed straight plates, and described first shackle member and the second shackle member are fixedly connected on perpendicular hurdle.
5. gardens according to claim 2 Fast Installation guardrail, is characterized in that: described first shackle member and the second shackle member are all arranged in bolt shape, and described connector is a joint pin, and described shackle member is a nut.
6. gardens according to claim 5 Fast Installation guardrail, is characterized in that: described first card interface and the second card interface include the through hole and chute that are communicated with, and described through hole can pass for bolt, and the width of described chute is identical with the diameter of joint pin.
7. gardens according to claim 5 Fast Installation guardrail, it is characterized in that: described joint pin is a threaded column, described first shackle member and the second shackle member are threaded with perpendicular hurdle.
8. gardens according to claim 1 Fast Installation guardrail, is characterized in that: described upper rail, be bolted between bottom rail and pile.
CN201520752179.6U 2015-09-25 2015-09-25 Gardens are with installing guardrail fast Expired - Fee Related CN204960504U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520752179.6U CN204960504U (en) 2015-09-25 2015-09-25 Gardens are with installing guardrail fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520752179.6U CN204960504U (en) 2015-09-25 2015-09-25 Gardens are with installing guardrail fast

Publications (1)

Publication Number Publication Date
CN204960504U true CN204960504U (en) 2016-01-13

Family

ID=55055578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520752179.6U Expired - Fee Related CN204960504U (en) 2015-09-25 2015-09-25 Gardens are with installing guardrail fast

Country Status (1)

Country Link
CN (1) CN204960504U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109750565A (en) * 2019-02-14 2019-05-14 徐倩 A kind of railway cement prefabricated element barrier wall fence

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109750565A (en) * 2019-02-14 2019-05-14 徐倩 A kind of railway cement prefabricated element barrier wall fence
CN109750565B (en) * 2019-02-14 2021-06-22 徐倩 Cement prefabricated component enclosure fence for railway

Similar Documents

Publication Publication Date Title
CN204326698U (en) A kind of protective fence of dimension adjustable
CN202530571U (en) Box type house convenient to dismount and mount
CN204266124U (en) The pre-assembled moulding bed of large sections steel box-girder
CN204960504U (en) Gardens are with installing guardrail fast
CN201581553U (en) Square flange joint of lattice column
CN103883117A (en) Split mounting type staircase used for scaffold
CN204960500U (en) Install guardrail fast
CN204045144U (en) LED display assembling frame
CN106494869A (en) Reversing arrangement is conveyed on assembly line
CN203113845U (en) Protective shed of distribution box
CN105016220A (en) Holding rod joint adding device
CN204139631U (en) The guard rail of building site fast demountable
CN203531482U (en) Protective cover of distribution box
CN205222516U (en) Stand and track crossbeam connection structure between assembled maintenance
CN107965170A (en) Distribution box protection canopy with assembling type base
CN202627275U (en) Keel structure for dry-hanging stone curtain walls
CN203034914U (en) Demountable rail structure
CN104612166A (en) Combined supporting device and method for hole wall supporting
CN202422650U (en) Eight-board two-map conventionalized structure device for construction site
CN206608102U (en) A kind of coal drop inspection platform
CN204370729U (en) Grid step plate mounting structure
CN205275069U (en) Tower crane attaches wall connection structure
CN204312009U (en) Production tree platform and production tree double-decked platform
CN203113817U (en) Stair protective structure
CN203924746U (en) Protection canopy base plate and automatic lifting protection canopy

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

Termination date: 20210925