CN204960315U - Positioning groove structure of combined material template - Google Patents

Positioning groove structure of combined material template Download PDF

Info

Publication number
CN204960315U
CN204960315U CN201520686560.7U CN201520686560U CN204960315U CN 204960315 U CN204960315 U CN 204960315U CN 201520686560 U CN201520686560 U CN 201520686560U CN 204960315 U CN204960315 U CN 204960315U
Authority
CN
China
Prior art keywords
material template
detent
tab
piece
pulling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520686560.7U
Other languages
Chinese (zh)
Inventor
杨翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Jiachen New Materials Co., Ltd.
Original Assignee
杨翔
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 杨翔 filed Critical 杨翔
Priority to CN201520686560.7U priority Critical patent/CN204960315U/en
Application granted granted Critical
Publication of CN204960315U publication Critical patent/CN204960315U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a positioning groove structure of combined material template for place pulling -on piece and square pipe strap utensil, be equipped with the spacer on the square pipe strap utensil, the cladding all around of combined material template has a connection box, and the connection box lateral surface violently is equipped with a plurality of positioning groove, positioning groove is by block portion and constitute the portion of drawing, block portion center is equipped with connect the via hole, to draw the portion inner with block portion links to each other as an organic wholely, the outer end with the working face of combined material template is in the coplanar, just the degree of depth to drawing the portion equals thickness to the pulling -on piece, the degree of depth of block portion equals to the pulling -on piece with the thickness sum of spacer. The utility model has the advantages of, the can not only be simultaneously nimble places pulling -on piece and square pipe strap utensil, makes things convenient for connection and location between the template, can guarantee moreover when not placing pulling -on piece and square pipe strap utensil, also can not increase the hourglass thick liquid position of wall, and furthest reduces the hourglass thick liquid problem on concrete surface.

Description

A kind of detent structure of composite material template
[technical field]
The utility model relates to construction formwork field, more particularly, relates to a kind of detent structure of composite material template.
[background technology]
Existing composite material template, as shown in Figure 1, connection box 11 ' arranges a plurality of detent 12 ', pull-tab is placed to complete being connected drawing of composite material template 100 ' and other composite material template by detent 12 ', also can fix square tube to ensure wall leveling at the upper square tube jig of placing of detent 12 ' simultaneously, but, detent 12 ' on existing connection box 11 ' is normally penetrating, namely with the lateral surface of same depth penetration connection box, when above-mentioned detent 12 ' do not used by pull-tab or square tube jig, (pull-tab and square tube jig are all selective placements like this, be not that each detent needs to place pull-tab or square tube jig), the detent penetrating when building concrete just easily causes concrete outwards to flow out along detent 12 ', thus cause spillage.
[summary of the invention]
The technical problems to be solved in the utility model, be the detent structure that a kind of composite material template is provided, pull-tab and square tube jig can not only be placed flexibly simultaneously, make the connection between template and locate convenient, and can ensure when pull-tab and square tube jig are not placed, also can not increase the spillage point position of metope, reduce the spillage problem on concrete surface to greatest extent.
The utility model is achieved in that a kind of detent structure of composite material template, for placing pull-tab and square tube jig, described square tube jig is provided with spacer, described composite material template surrounding is coated with connection box, connection box lateral surface has been horizontally set with a plurality of detent, described detent forms by holding section with to the portion of drawing, center, described holding section is provided with connecting through hole, it is described that to drawing, portion is inner to be connected as one with described holding section, the work plane of outer end and described composite material template is in same plane, and the described thickness to drawing the degree of depth in portion to equal described pull-tab, the degree of depth of described holding section equals the thickness sum of described pull-tab and described spacer.
The utility model has the advantage of:
1, the spacer of square tube jig can be placed flexibly by holding section, thus square tube jig is firmly fastened in detent, pull-tab also can be placed drawing in portion to being located at simultaneously, such detent just can place pull-tab and square tube jig simultaneously, facilitates the connection between template and location;
2, by detent being divided into the holding section of different depth and to drawing portion, be connected with holding section to drawing one end, portion, the work plane of free end and composite material template is in same plane, and the portion degree of depth of drawing is only to the thickness of pull-tab, like this in template to when drawing connection, due to pull-tab can just to be located at detent to drawing in portion polishing, shuttering work face is made to keep smooth, water concrete when smashing concrete would not spill in shuttering work face, even if at the detent place of not placing pull-tab or square tube jig, due to limited to drawing the degree of depth in portion, also the spillage point position of metope can not be increased when watering and smashing concrete, the spillage problem on concrete surface can be reduced to greatest extent.
[accompanying drawing explanation]
The utility model is further described with reference to the accompanying drawings in conjunction with the embodiments.
Fig. 1 is the structural representation of existing composite material template groove.
Fig. 2 is structural representation one (back side of composite material template is front) of the present utility model.
Fig. 3 is the enlarged diagram of local A in Fig. 2.
Fig. 4 is structural representation two (work plane of composite material template is front) of the present utility model.
Fig. 5 is that the utility model is for placing the schematic diagram of pull-tab and square tube jig.
Accompanying drawing marks
100-composite material template 11-connection box 12-detent
121-holding section 122-is to drawing portion 123-connecting through hole
200-first composite material template 21-first detent 211-first holding section
212-first is to drawing portion 300-second composite material template
31-second detent 311-second holding section 312-second detent
400-pull-tab 500-square tube jig 501-spacer
600-connector
[detailed description of the invention]
Refer to Fig. 2, shown in Fig. 3 and Fig. 4, the detent structure of a kind of composite material template of the utility model, for placing pull-tab (as shown in Fig. 5 400, lower with) and square tube jig (as shown in Fig. 5 500, lower same), described square tube jig is provided with spacer (as in figure in 5 shown in 501, lower same), described composite material template 100 surrounding is coated with connection box 11, connection box 11 lateral surface has been horizontally set with a plurality of detent 12, described detent 12 is by holding section 121 with to drawing portion 122 to form, center, described holding section 121 is provided with connecting through hole 123, it is described that to drawing, portion 122 is inner to be connected as one with described holding section 121, the work plane of outer end and described composite material template 100 is in same plane, and described to drawing the degree of depth D1 in portion 122 to equal the thickness of described pull-tab, (thickness of described pull-tab is in Fig. 5 shown in H1, lower same), the degree of depth D2 of described holding section 121 equals thickness (thickness of described spacer is H2 in Fig. 5) sum of described pull-tab and described spacer.
As shown in Figure 5, operating principle of the present utility model is:
When the first composite material template 200 and the second composite material template 300 carry out to draw be connected time, the spacer 501 of a square tube jig 500 is inserted in first holding section 211 of first first detent 21 on the first composite material template 200, being horizontally set with pull-tab 400 one end draws in portion 212 the first couple of the first detent 21 again, the second couple that the other end is horizontally set with corresponding second detent 31 on the second composite material template 300 draws in portion 312, stack the spacer 501 of the opposing party's pipe clamp tool 500 in the second holding section 311 simultaneously, connect to drawing the pull-tab 400 at two ends and lock to be fixedly connected with square tube jig 200 finally by connector 600 respectively, complete the first composite material template 200 and the second composite material template 300 to drawing connection and positioning.The utility model is owing to being divided into the holding section of different depth and to drawing portion by detent, square tube jig and pull-tab can not only be placed flexibly like this, and the portion degree of depth of drawing is only to the thickness of pull-tab, like this in template to when drawing connection, due to pull-tab can just to be located at detent to drawing in portion polishing, shuttering work face is made to keep smooth, water concrete when smashing concrete would not spill in shuttering work face, even if at the detent place of not placing pull-tab or square tube jig, due to limited to drawing the degree of depth in portion, also the spillage point position of metope can not be increased when watering and smashing concrete, the spillage problem on concrete surface can be reduced to greatest extent.
The above, be only the utility model preferred embodiment, therefore the scope that the utility model implements can not be limited according to this, the equivalence namely done according to the utility model the scope of the claims and description change with modify, all should still belong in scope that the utility model contains.

Claims (1)

1. the detent structure of a composite material template, for placing pull-tab and square tube jig, described square tube jig is provided with spacer, described composite material template surrounding is coated with connection box, connection box lateral surface has been horizontally set with a plurality of detent, it is characterized in that: described detent forms by holding section with to the portion of drawing, center, described holding section is provided with connecting through hole, it is described that to drawing, portion is inner to be connected as one with described holding section, the work plane of outer end and described composite material template is in same plane, and the described thickness to drawing the degree of depth in portion to equal described pull-tab, the degree of depth of described holding section equals the thickness sum of described pull-tab and described spacer.
CN201520686560.7U 2015-09-07 2015-09-07 Positioning groove structure of combined material template Active CN204960315U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520686560.7U CN204960315U (en) 2015-09-07 2015-09-07 Positioning groove structure of combined material template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520686560.7U CN204960315U (en) 2015-09-07 2015-09-07 Positioning groove structure of combined material template

Publications (1)

Publication Number Publication Date
CN204960315U true CN204960315U (en) 2016-01-13

Family

ID=55055389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520686560.7U Active CN204960315U (en) 2015-09-07 2015-09-07 Positioning groove structure of combined material template

Country Status (1)

Country Link
CN (1) CN204960315U (en)

Similar Documents

Publication Publication Date Title
CN204960315U (en) Positioning groove structure of combined material template
CN203879516U (en) Sequential and segmentation grouting device of tunnel grouting model test
CN205421322U (en) Pre -buried rag bolt crowd's positioning tool
CN206957068U (en) A kind of concrete protective layer pad
CN107143057B (en) A kind of building masonry structure and its construction method
CN205314534U (en) Frame post can't harm drawknot steel form structure
CN205534632U (en) Structure is buried underground to waterproof wall pipe
CN204059665U (en) A kind of prefabricated round type shear wall
CN103912289A (en) Tunnel grouting model test sequential segmented grouting device and using method thereof
CN204756168U (en) Multi -functional elevator structure of zenith
CN209881341U (en) Pre-buried positioner of water and electricity pipeline
CN210086825U (en) Plastic formwork plug for fixing reserved steel bars
CN205135253U (en) Prefabricated window board that joint strength is high
CN209025469U (en) A kind of housing construction bar spacing marking device
CN206620409U (en) Doubly-linked joint fast assembled hoe
CN205776280U (en) A kind of L-type slope protection device
CN109768510A (en) A kind of communication cable laying pipe
CN217629810U (en) Novel grid convenient to install and use
CN205530136U (en) Modular water conservancy ditch rapid prototyping device
CN217642491U (en) Spool location frock
CN205571255U (en) Angle bending machine of crooked round pin rack is decided to ring
CN204940671U (en) A kind of civil construction fragment of brick
CN220928670U (en) Novel embedded type outer shear wall connecting wall piece
CN211646741U (en) Building engineering concrete prefabricated component convenient to operation
CN205290930U (en) Shaped steel is positioner for flange drilling

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200122

Address after: 350000 Fujian Province Fuzhou Taijiang District Aofeng Road 20 Hongxing Court Phase III Aofeng Square Building 10 stories 03A

Patentee after: Fuzhou Jiachen New Materials Co., Ltd.

Address before: 1, 803, 350000, Tong Xin Village, drum West Road, 306 Drum Tower Road, Gulou District, Fujian, Fuzhou

Patentee before: Yang Xiang