CN204959580U - Steel pipe arched bridge closure connecting device - Google Patents

Steel pipe arched bridge closure connecting device Download PDF

Info

Publication number
CN204959580U
CN204959580U CN201520735743.3U CN201520735743U CN204959580U CN 204959580 U CN204959580 U CN 204959580U CN 201520735743 U CN201520735743 U CN 201520735743U CN 204959580 U CN204959580 U CN 204959580U
Authority
CN
China
Prior art keywords
steel pipe
backing plate
arched bridge
closure
center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520735743.3U
Other languages
Chinese (zh)
Inventor
王建军
高荣峰
李勇
任亚杰
王振
姚予东
刘文杰
贾占磊
尹国梁
王雷
王颜鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China State Railway Group Co Ltd
China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
China Railway Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd, China Railway Corp filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN201520735743.3U priority Critical patent/CN204959580U/en
Application granted granted Critical
Publication of CN204959580U publication Critical patent/CN204959580U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility mode relates to a steel pipe arched bridge closure connecting device, solved that current steel pipe arched bridge closure exists that precision internal force is not up to standard, during the operating cost difficultly and the lower problem of factor of safety. All be provided with flange in the steel pipe arched bridge port, every flange all includes the backing plate, and the center of backing plate is fixed with interior bushing pipe, and is provided with the stiffening rib that uses its center to distribute as centre of a circle equipartition and fix with interior bushing pipe and steel pipe arched bridge on the backing plate, be provided with adjusting nut between two backing plates, the dextrorotation screw rod that has the left -handed screw of fixing with the left side backing plate and contact is twisted with the right side backing plate at both ends about adjusting nut, the inboard of two backing plates all is fixed with the stiffener. The utility model has the advantages of reasonable design reliably, convenient quick realization the instantaneous closure of steel pipe arched bridge, precision, internal force are all up to standard moreover, have stopped the emergence of potential safety hazard, have simple structure, processing is convenient and advantage with low costs.

Description

Steel pipe arch bridge closure linkage
Technical field
The utility model relates to steel pipe arch bridge closure construction equipment, is specially a kind of steel pipe arch bridge closure linkage.
Background technology
Along with the raising of expanding economy, environmental requirement, when crossing over great river, great river, deep valley, Long Span Railway steel pipe arch bridge obtains increasing application.Railway transportation load is heavy, vibration is large, railway steel tube arch is had higher requirement, in the installation of free cantilever erection, huge structure, long-span Steel Arch sections that weight is overweight, linear, the Internal force control of particularly steel pipe arch bridge closure must become the key of steel pipe arch bridge success or failure.
The mode that current domestic tubular arch closure adopts common built-in gad joint or minimum temperature directly to weld usually is to complete the instantaneous closure of tubular arch.These two kinds of methods not only cannot meet the requirement that the linear precision of free cantilever erection large diameter steel pipe arch bridge is high, internal force is large, and the operating time is long, need use lot of materials, equipment and labour, and complex process operation is not convenient, and safety factor is low.
Summary of the invention
In order to solve the closure of existing steel pipe arch bridge, the utility model exists that precision internal force is not up to standard, operation is wasted time and energy and the lower problem of safety factor, provide a kind of steel pipe arch bridge closure linkage.
The utility model adopts following technical scheme to realize: steel pipe arch bridge closure linkage, comprise about two adjacent steel pipe arch bridges, adpting flange is provided with in steel pipe arch bridge port, each adpting flange includes backing plate, the center of backing plate is fixed with internal lining pipe, and backing plate is provided with its center for the uniform distribution in the center of circle and the stiffening rib fixing with internal lining pipe and steel pipe arch bridge; Be provided with adjusting nut between two backing plates, the two ends, left and right of adjusting nut are screwed with the left-handed screw fixed with left side backing plate and the right handed screw with right side pad contact; The inner side of two backing plates is all fixed with stiffener.
When carrying out steel pipe arch bridge closure opertation, adpting flange is welded on steel pipe arch bridge inwall in advance, left-handed screw one end is welded with left side backing plate, rotating adjusting nut, right handed screw is extended until hold out against with right side backing plate, by adjusting nut adjustment closure mouth size, reach after designing requirement until environment temperature, weld right handed screw and right side backing plate immediately, complete instantaneous closure, overcome the closure of existing steel pipe arch bridge and have that precision internal force is not up to standard, operation is wasted time and energy and the lower problem of safety factor.
The utility model reasonable in design is reliable, achieves the instantaneous closure of steel pipe arch bridge easily and fast, and precision, internal force are all up to standard, have stopped the generation of potential safety hazard, has simple, the easy to process and advantage that cost is low of structure.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1-steel pipe arch bridge, 2-backing plate, 3-internal lining pipe, 4-stiffening rib, 5-adjusting nut, 6-left-handed screw, 7-right handed screw, 8-stiffener.
Detailed description of the invention
Steel pipe arch bridge closure linkage, comprise about two adjacent steel pipe arch bridges 1, adpting flange is provided with in steel pipe arch bridge 1 port, each adpting flange includes backing plate 2, the center of backing plate 2 is fixed with internal lining pipe 3, and backing plate 2 is provided with its center for the uniform distribution in the center of circle and with internal lining pipe 3 and the fixing stiffening rib 4 of steel pipe arch bridge 1; Be provided with adjusting nut 5 between two backing plates 2, the two ends, left and right of adjusting nut 5 are screwed with the left-handed screw 6 fixed with left side backing plate 2 and the right handed screw 7 contacted with right side backing plate 2; The inner side of two backing plates 2 is all fixed with stiffener 8.
In specific implementation process, arch rib adopts cable crane integral hoisting, the symmetrical free cantilever erection in two sides, and stayed knotting method is installed, and arch rib middle part is stayed and established closure section; After free cantilever erection completes, accurate adjustment arc rib alignment, joins according to actual measurement closure mouth size and cuts adjusting nut 5 and install adpting flange, complete instantaneous closure at closure temperature.

Claims (1)

1. a steel pipe arch bridge closure linkage, comprise about two adjacent steel pipe arch bridges (1), it is characterized in that: in steel pipe arch bridge (1) port, be provided with adpting flange, each adpting flange includes backing plate (2), the center of backing plate (2) is fixed with internal lining pipe (3), and backing plate (2) is provided with its center for the uniform distribution in the center of circle and the stiffening rib (4) fixing with internal lining pipe (3) and steel pipe arch bridge (1); Be provided with adjusting nut (5) between two backing plates (2), the two ends, left and right of adjusting nut (5) are screwed with the left-handed screw (6) fixed with left side backing plate (2) and the right handed screw (7) contacted with right side backing plate (2); The inner side of two backing plates (2) is all fixed with stiffener (8).
CN201520735743.3U 2015-09-22 2015-09-22 Steel pipe arched bridge closure connecting device Expired - Fee Related CN204959580U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520735743.3U CN204959580U (en) 2015-09-22 2015-09-22 Steel pipe arched bridge closure connecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520735743.3U CN204959580U (en) 2015-09-22 2015-09-22 Steel pipe arched bridge closure connecting device

Publications (1)

Publication Number Publication Date
CN204959580U true CN204959580U (en) 2016-01-13

Family

ID=55054655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520735743.3U Expired - Fee Related CN204959580U (en) 2015-09-22 2015-09-22 Steel pipe arched bridge closure connecting device

Country Status (1)

Country Link
CN (1) CN204959580U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862603A (en) * 2016-06-01 2016-08-17 中交四公局第五工程有限公司 Simple and easy steel pipe arch bridge and arch rib closure device
CN108797313A (en) * 2018-07-31 2018-11-13 中国十七冶集团有限公司 A kind of novel precast bridge arch box and its assemble method
CN109570891A (en) * 2018-12-03 2019-04-05 中铁上海工程局集团有限公司 A kind of high-precision, simply convenient and fast steel pipe butt-jointing device and steel pipe interconnection method
CN109914253A (en) * 2019-03-20 2019-06-21 中交路桥建设有限公司 A kind of aerial Dock With Precision Position system and method for suspension bridge girder steel
CN111424552A (en) * 2020-04-08 2020-07-17 山东交通学院 Continuous section corrugated pipe connecting device for continuous T-beam bridge pier top and using method
CN112323631A (en) * 2020-10-20 2021-02-05 高军 Rapid closure method for large-span steel truss arch bridge inclined bridge
CN112391950A (en) * 2020-10-14 2021-02-23 华南理工大学 Device and method for adjusting center line deviation of closure opening of high-tower and low-tower cable-stayed bridge
CN113186796A (en) * 2021-04-30 2021-07-30 广州文船重工有限公司 Connecting joint and connecting method for closure opening of arch bridge
CN114775437A (en) * 2022-05-05 2022-07-22 中铁大桥局集团第一工程有限公司 Rapid closure method for arch rib of deck type steel tube arch bridge

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862603A (en) * 2016-06-01 2016-08-17 中交四公局第五工程有限公司 Simple and easy steel pipe arch bridge and arch rib closure device
CN105862603B (en) * 2016-06-01 2018-03-09 中交四公局第五工程有限公司 A kind of easy steel pipe arch bridge arch rib closure device
CN108797313A (en) * 2018-07-31 2018-11-13 中国十七冶集团有限公司 A kind of novel precast bridge arch box and its assemble method
CN109570891A (en) * 2018-12-03 2019-04-05 中铁上海工程局集团有限公司 A kind of high-precision, simply convenient and fast steel pipe butt-jointing device and steel pipe interconnection method
CN109570891B (en) * 2018-12-03 2024-04-16 中铁上海工程局集团有限公司 High-precision, simple and convenient steel pipe butt joint device and steel pipe butt joint method
CN109914253A (en) * 2019-03-20 2019-06-21 中交路桥建设有限公司 A kind of aerial Dock With Precision Position system and method for suspension bridge girder steel
WO2021203782A1 (en) * 2020-04-08 2021-10-14 山东交通学院 Corrugated pipe connection device for continuous section at top of continuous t-beam bridge pier and usage method
CN111424552B (en) * 2020-04-08 2021-11-23 山东交通学院 Continuous section corrugated pipe connecting device for continuous T-beam bridge pier top and using method
CN111424552A (en) * 2020-04-08 2020-07-17 山东交通学院 Continuous section corrugated pipe connecting device for continuous T-beam bridge pier top and using method
CN112391950A (en) * 2020-10-14 2021-02-23 华南理工大学 Device and method for adjusting center line deviation of closure opening of high-tower and low-tower cable-stayed bridge
CN112391950B (en) * 2020-10-14 2021-10-26 华南理工大学 Device and method for adjusting center line deviation of closure opening of high-tower and low-tower cable-stayed bridge
CN112323631A (en) * 2020-10-20 2021-02-05 高军 Rapid closure method for large-span steel truss arch bridge inclined bridge
CN113186796A (en) * 2021-04-30 2021-07-30 广州文船重工有限公司 Connecting joint and connecting method for closure opening of arch bridge
CN114775437A (en) * 2022-05-05 2022-07-22 中铁大桥局集团第一工程有限公司 Rapid closure method for arch rib of deck type steel tube arch bridge

Similar Documents

Publication Publication Date Title
CN204959580U (en) Steel pipe arched bridge closure connecting device
CN206591448U (en) Novel bridge widens bracing means
CN105178443A (en) Bolt connecting joint suitable for single-layer latticed shell with rectangular steel pipes
CN204491425U (en) A kind of external prestressing strengthening structure of T-shaped bridge diaphragm
CN105839546A (en) Arch rib buckling and hanging installing structure of steel pipe arch bridge
CN204416913U (en) A kind of shaped steel stone tongs
CN104179256A (en) Rectangular concrete filled steel tube column and steel beam single-side bolt connecting joint and construction method thereof
CN103089010B (en) The suspension bracket construction equipment of topping at the bottom of a kind of alternative reinforced concrete beam and method
CN204059610U (en) Rectangular steel-tube concrete column and the monolateral bolt connection node of girder steel
CN203632117U (en) A rotary type insulation lift
CN204876759U (en) Prestressing force steel pipe component
CN204551751U (en) The syndeton of a kind of new increasing steel beam and concrete column
CN203795605U (en) Connecting device for truss rods
CN208668598U (en) A kind of reinforced aluminum joints of angular member
CN203068042U (en) Simplex articulated type corrugated compensator
CN202323727U (en) Device for adjusting horizontal position of steel box girder
CN204530456U (en) A kind of Novel comb tooth plate stretching device anchor bolt
CN202073897U (en) Steel structure bolt for megawatt unit boiler
CN204826226U (en) Bolted connection node suitable for rectangle steel pipe individual layer net shell
CN206902574U (en) A kind of Filled Steel Tubular Arch Bridge closing device
CN108756949B (en) Positioning device for spacing and protective layer of two lining reinforced layers of tunnel
CN203592422U (en) Cargo boom tool for tower crane
CN206902570U (en) Steel pipe arch bridge arch rib closing device
CN105862603A (en) Simple and easy steel pipe arch bridge and arch rib closure device
CN205100565U (en) But steel pipe concrete jacking of superelevation layer is with retractable pump pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113