CN204958135U - Hoist of handling modularization wall body - Google Patents

Hoist of handling modularization wall body Download PDF

Info

Publication number
CN204958135U
CN204958135U CN201520612539.2U CN201520612539U CN204958135U CN 204958135 U CN204958135 U CN 204958135U CN 201520612539 U CN201520612539 U CN 201520612539U CN 204958135 U CN204958135 U CN 204958135U
Authority
CN
China
Prior art keywords
hole
wall
shaped steel
suspender
handling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520612539.2U
Other languages
Chinese (zh)
Inventor
孙占利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wendeng Landao Construction Engineering Co Ltd
Original Assignee
Wendeng Landao Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wendeng Landao Construction Engineering Co Ltd filed Critical Wendeng Landao Construction Engineering Co Ltd
Priority to CN201520612539.2U priority Critical patent/CN204958135U/en
Application granted granted Critical
Publication of CN204958135U publication Critical patent/CN204958135U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a hoist of handling modularization wall body, it includes the lifting hook, hang ring, wire rope, rings, hanging beam, suspender, n shaped steel area, strengthen through -hole, connect the via hole and strengthening stud and nut, be provided with the wall body through -hole, be provided with the galvanizing coat, install the spirit level, the utility model provides the intensity of high hoist prevents to warp safe and reliable, processing is convenient, and easy dismounting is swift, prevent the hoist corrosion, use safe and reliable, when lifting by crane, guarantee the steady of handling and safety through the spirit level.

Description

A kind of suspender of handling modularization body of wall
Technical field
The utility model relates to a kind of suspender of handling modularization body of wall, is specifically related to the modularization lifting field, displaying room in a kind of housing construction more than 120 square meters.
Background technology
At present, the aim of displaying room designs more than 120 square meters is to realize modularization integral disassembly, assembly, realizes the construction of efficient quick special quality.The suspender of current handling modularization body of wall needs specially according to the suspender of the wall surface design different size of different size size, and by thread tapping, suspender is connected with metope, dismounting is inconvenient, suspender needs in strict accordance with drawing simmering and bending, be not suitable for on-the-spot fast and efficient construction, have a strong impact on construction speed.
Utility model content
For the deficiencies in the prior art, technical problem to be solved in the utility model is to provide a kind of compact conformation, reasonable in design, with low cost, rapidly and efficiently and the suspender of safe and reliable handling modularization body of wall.
The technical solution of the utility model is as follows:
The utility model comprises the suspension hook be connected with hoisting crane, what be connected with suspension hook hangs circle, install the steel rope hung on circle, two suspension ring be connected with steel rope two ends respectively, the hanging beam that two ends are bolted with corresponding suspension ring lower end respectively, two suspender belts be connected with both sides, hanging beam lower end respectively, be installed on the N-shaped steel band of two suspender belt lower ends respectively, be arranged on the reinforcement through hole on N-shaped steel band two side elevation top, the connecting through hole and being installed on being arranged on N-shaped steel band two side elevation bottom strengthens strengthening stud on through hole and nut, modularization lightweight steel construction body of wall is provided with the body of wall through hole corresponding with connecting through hole, and described connecting through hole is connected by body of wall screw bolt and nut with body of wall through hole, described N-shaped steel strip surface is provided with zinc coating, and described suspender belt passes from the gap between body of wall bolt and strengthening stud, and hanging beam is provided with level indicator.
The beneficial effects of the utility model are as follows:
The utility model, by being arranged on N-shaped steel band, strengthening stud, improves the intensity of suspender, prevents distortion, safe and reliable; By arranging body of wall through hole, easy to process, body of wall bolt disassembly is convenient and swift; N-shaped steel strip surface is provided with zinc coating, prevents suspender corrosion, and suspender belt passes from the gap between body of wall bolt and strengthening stud, prevent the side sharp edge of N-shaped steel band and burr from damaging suspender belt, safe and reliable, during lifting, ensure the steady of handling and safety by level indicator.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model N-shaped steel band;
In accompanying drawing: 1, modularization lightweight steel construction body of wall; 2, N-shaped steel band; 3, suspender belt; 4, hanging beam; 5, circle is hung; 6, suspension hook; 7, suspension ring; 8, body of wall bolt; 9, strengthening stud; 10, body of wall through hole; 11, connecting through hole; 12, through hole is strengthened; 13, steel rope; 14, level indicator.
Detailed description of the invention
For making the technical problems to be solved in the utility model, technical scheme and beneficial effect clearly, be described in detail below in conjunction with the drawings and specific embodiments.
As Fig. 1, shown in 2: the utility model comprises the suspension hook 6 be connected with hoisting crane, what be connected with suspension hook 6 hangs circle 5, install the steel rope 13 hung on circle 5, two suspension ring 7 be connected with steel rope 13 two ends respectively, the hanging beam 4 that two ends are bolted with corresponding suspension ring 7 lower end respectively, two suspender belts 3 be connected with both sides, hanging beam 4 lower end respectively, be installed on the N-shaped steel band 2 of two suspender belt 3 lower ends respectively, be arranged on the reinforcement through hole 12 on N-shaped steel band 2 liang of side elevation tops, the connecting through hole 11 and being installed on being arranged on N-shaped steel band 2 liang of side elevation bottoms strengthens strengthening stud 9 on through hole 12 and nut, the intensity being improved suspender by N-shaped steel band 2 prevents distortion, safe and reliable, the intensity of further raising N-shaped steel band 2 prevents distortion, safe and reliable, modularization lightweight steel construction body of wall 1 is provided with the body of wall through hole 10 corresponding with connecting through hole 11, easy to process, connecting through hole 11 is connected by body of wall bolt 8 and nut with body of wall through hole 10, only needs to be loaded onto from bolt by nut or pull down during dismounting, convenient and swift, N-shaped steel band 2 surface is provided with zinc coating, prevents suspender corrosion, and suspender belt 3 passes from the gap between body of wall bolt 8 and strengthening stud 9, prevents the side sharp edge of N-shaped steel band 2 and burr from damaging suspender belt 3, safe and reliable.Hanging beam 4 is provided with level indicator 14, ensures the steady of lifting and safety by level indicator 14.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the utility model.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein when not departing from spirit or scope of the present utility model, can realize in other embodiments.Therefore, the utility model can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (1)

1. the suspender of a handling modularization body of wall, it is characterized in that: comprise the suspension hook (6) be connected with hoisting crane, hanging of being connected with suspension hook (6) is enclosed (5), install the steel rope (13) hung on circle (5), two suspension ring (7) be connected with steel rope (13) two ends respectively, the hanging beam (4) that two ends are bolted with corresponding suspension ring (7) lower end respectively, two suspender belts (3) be connected with hanging beam (4) both sides, lower end respectively, be installed on the N-shaped steel band (2) of two suspender belt (3) lower ends respectively, be arranged on the reinforcement through hole (12) on N-shaped steel band (2) two side elevation top, the connecting through hole (11) and being installed on being arranged on N-shaped steel band (2) two side elevation bottom strengthens strengthening stud (9) on through hole (12) and nut,
Modularization lightweight steel construction body of wall (1) is provided with the body of wall through hole (10) corresponding with connecting through hole (11), and described connecting through hole (11) is connected by body of wall bolt (8) and nut with body of wall through hole (10);
Described N-shaped steel band (2) surface is provided with zinc coating, and described suspender belt (3) passes from the gap between body of wall bolt (8) and strengthening stud (9); Described hanging beam (4) is provided with level indicator (14).
CN201520612539.2U 2015-08-14 2015-08-14 Hoist of handling modularization wall body Expired - Fee Related CN204958135U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520612539.2U CN204958135U (en) 2015-08-14 2015-08-14 Hoist of handling modularization wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520612539.2U CN204958135U (en) 2015-08-14 2015-08-14 Hoist of handling modularization wall body

Publications (1)

Publication Number Publication Date
CN204958135U true CN204958135U (en) 2016-01-13

Family

ID=55053215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520612539.2U Expired - Fee Related CN204958135U (en) 2015-08-14 2015-08-14 Hoist of handling modularization wall body

Country Status (1)

Country Link
CN (1) CN204958135U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107746012A (en) * 2017-11-29 2018-03-02 贵州兴贵恒远新型建材有限公司 Building-brick type wall hanging method
CN112551386A (en) * 2020-11-26 2021-03-26 建峰索具有限公司 Hoisting equipment with typhoon prevention function

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107746012A (en) * 2017-11-29 2018-03-02 贵州兴贵恒远新型建材有限公司 Building-brick type wall hanging method
CN112551386A (en) * 2020-11-26 2021-03-26 建峰索具有限公司 Hoisting equipment with typhoon prevention function

Similar Documents

Publication Publication Date Title
CN203201216U (en) Vertical rod centralizer
CN204958135U (en) Hoist of handling modularization wall body
CN205916895U (en) But chain hoist that multiple spot hung
CN202785251U (en) Crane hook fixture
CN202808173U (en) Lifting device special for lateral columns
CN204958138U (en) Hoist of handling modularization roof truss
CN204958139U (en) Stabilize handling floor beam's hoist
CN208648546U (en) A kind of bull-dozer components assembly hanging apparatus
CN203946824U (en) A kind of shaking draws and hangs device
CN204958144U (en) Handling modularization floor beam's hoist
CN206142665U (en) Detachable steel structural hoisting fixture
CN205973449U (en) Jack -up handling rigging of buffering pulley
CN205045696U (en) Iron tower lower margin cable suspension device for hot -galvanize
CN204416919U (en) A kind of lifting device
CN204727436U (en) A kind of hoisting crane special hanger
CN204702399U (en) A kind of Steel plate hoisting implement
CN204661128U (en) Spraying suspender
CN209635714U (en) A kind of suspender clamping axial workpiece
CN206580218U (en) A kind of belt collet roll change tools
CN202499643U (en) Special lifting head
CN205061329U (en) Lifting tool for steel plate
CN205973450U (en) Electric hoist is lifting hook foundry goods for hoist
CN205820717U (en) A kind of anti-rolling wheel support of pin type
CN204569153U (en) Tubing special hanger peculiar to vessel
CN204454262U (en) A kind of folding arm suspension hook group

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

Termination date: 20170814