CN204947494U - Comprehensive wiring system in a kind of intelligent building - Google Patents
Comprehensive wiring system in a kind of intelligent building Download PDFInfo
- Publication number
- CN204947494U CN204947494U CN201520672009.7U CN201520672009U CN204947494U CN 204947494 U CN204947494 U CN 204947494U CN 201520672009 U CN201520672009 U CN 201520672009U CN 204947494 U CN204947494 U CN 204947494U
- Authority
- CN
- China
- Prior art keywords
- subsystem
- cable
- equipment
- equipment room
- intelligent building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model discloses the comprehensive wiring system in a kind of intelligent building, comprise equipment room, service area, directorial area, horizontal subsystem, riser backbone subsystem and Campus Subsystem, in described equipment room, be placed with equipment cable and relevant connection hardware and application system equipment; The line that described service area is connected to telecommunications outlet by terminal equipment forms; Described directorial area is arranged in the distribution area of wiring closet or equipment room; Described horizontal subsystem comprises cable and socket; One end of described cable is connected on the distributing frame of wiring closet, and the other end is connected on socket; Described riser backbone subsystem is made up of the stube cable between equipment room and floor distributor; Described Campus Subsystem is made up of the trunk cable connected between each building.Comprehensive wiring system in intelligent building of the present utility model, each part in six parts is separate, can independent design, construct separately, when changing one of them subsystem, all containing affect other subsystems, opening, flexibility and practical.
Description
Technical field
The utility model relates to a kind of comprehensive wiring system, is specifically related to the comprehensive wiring system in a kind of intelligent building, belongs to comprehensive wiring technical field.
Background technology
Civil construction project of vital and lasting importance, one-time investment is very large, when current national power is still not rich, round Realization building intelligent is difficult, but can not wait until that again fund is all on board, go again to put into operation, because time and opportunity can be lost like this, be not only skyscraper development in the future and bring a lot of sequelae, and draw close once plan to intelligent building, spend more investment, this is very irrational, but for each skyscraper, once condition maturity needs transformation and upgrade to be intelligent building, also be indubitable, these may be conspicuous contradiction palm fibre conjunction wirings of the general distant existence of current skyscraper is solve the current optimal path with unifying this lance matter future.Comprehensive wiring is the information transfer channel in a kind of modular, building that flexibility is high or between groups of building, voice device, data equipment, switching equipment and various control appliance and information management system can be made to couple together by it, the comprehensive wiring simultaneously also making these equipment be connected with external communication network, it also comprises the tie point of building external network or telecommunication line and all cables between application system equipment and relevant link.
Comprehensive wiring is a part for intelligent building, it is just as the highway of in intelligent building, can unified planning, Uniting, 3% ~ 5% of whole building fund is accounted at building multi-stage invest, by connection cable comprehensive wiring in building, as for installing in building or setting up what application system, this just according to time and needs, development and may be able to decide completely.Especially the tall and big housing-group built at present how with times, how to adapt to the needs of development in science and technology, do not increase too much investment again, comprehensive wiring platform is optimal selection.
Utility model content
(1) technical problem that will solve
For solving the problem, the utility model proposes the comprehensive wiring system in a kind of intelligent building, each part in six each and every one parts is separate, can independent design, construct separately, when changing one of them subsystem, all containing affect other subsystems, opening, flexibility and practical.
(2) technical scheme
Comprehensive wiring system in intelligent building of the present utility model, comprises equipment room, service area, directorial area, horizontal subsystem, riser backbone subsystem and Campus Subsystem, is placed with equipment cable and relevant connection hardware and application system equipment in described equipment room; The line that described service area is connected to telecommunications outlet by terminal equipment forms; Described directorial area is arranged in the distribution area of wiring closet or equipment room; Described horizontal subsystem comprises cable and socket; One end of described cable is connected on the distributing frame of wiring closet, and the other end is connected on socket; Described riser backbone subsystem is made up of the stube cable between equipment room and floor distributor; Described Campus Subsystem is made up of the trunk cable connected between each building.
Further, described equipment room is arranged on the second layer or the third layer of building.
Further, described horizontal subsystem is in same floor; Described riser backbone subsystem is positioned between vertical light current.
Further, the cable of described horizontal subsystem is 4 pairs of pair cables; The cable of described riser backbone subsystem is large logarithm pair cable or million cables.
(3) beneficial effect
Compared with prior art, the comprehensive wiring system in intelligent building of the present utility model, each part in six each and every one parts is separate, can independent design, construct separately, when changing one of them subsystem, all containing affect other subsystems, opening, flexibility and practical.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is workspace architecture schematic diagram of the present utility model;
Fig. 3 is directorial area of the present utility model and horizontal subsystem structural representation.
Parts in accompanying drawing are labeled as: equipment room-1, service area-2, directorial area-3, horizontal subsystem-4, riser backbone subsystem-5, Campus Subsystem-6, terminal equipment-21, telecommunications outlet-22, cable-41, socket-42.
Embodiment
Comprehensive wiring system in a kind of intelligent building as shown in Figure 1 to Figure 3, comprise equipment room 1, service area 2, directorial area 3, horizontal subsystem 4, riser backbone subsystem 5 and Campus Subsystem 6, in described equipment room 1, be placed with equipment cable and relevant connection hardware and application system equipment; The line that described service area 2 is connected to telecommunications outlet 22 by terminal equipment 21 forms; Described directorial area 3 is arranged in the distribution area of wiring closet or equipment room; Described horizontal subsystem 4 comprises cable 41 and socket 42; Described line, an end of 42 is connected on the distributing frame of wiring closet, and the other end is connected on socket 42; Described riser backbone subsystem 5 is made up of the stube cable between equipment room 1 and floor distributor; Described Campus Subsystem 6 is made up of the trunk cable connected between each building.
Described equipment room 1 is arranged on the second layer or the third layer of building.
Described horizontal subsystem 4 is in same floor; Described riser backbone subsystem 5 is positioned between vertical light current.
The cable 41 of described horizontal subsystem 4 is 4 pairs of pair cables; The cable of described riser backbone subsystem 5 is large logarithm pair cable or million cables.
Embodiment recited above is only be described preferred implementation of the present utility model, not limits design of the present utility model and scope.Under the prerequisite not departing from the utility model design concept; the various modification that this area ordinary person makes the technical solution of the utility model and improvement; protection range of the present utility model all should be dropped into; the technology contents of the utility model request protection, all records in detail in the claims.
Claims (4)
1. the comprehensive wiring system in an intelligent building, it is characterized in that: comprise equipment room, service area, directorial area, horizontal subsystem, riser backbone subsystem and Campus Subsystem, in described equipment room, be placed with equipment cable and relevant connection hardware and application system equipment; The line that described service area is connected to telecommunications outlet by terminal equipment forms; Described directorial area is arranged in the distribution area of wiring closet or equipment room; Described horizontal subsystem comprises cable and socket; One end of described cable is connected on the distributing frame of wiring closet, and the other end is connected on socket; Described riser backbone subsystem is made up of the stube cable between equipment room and floor distributor; Described Campus Subsystem is made up of the trunk cable connected between each building.
2. the comprehensive wiring system in intelligent building according to claim 1, is characterized in that: described equipment room is arranged on the second layer or the third layer of building.
3. the comprehensive wiring system in intelligent building according to claim 1, is characterized in that: described horizontal subsystem is in same floor; Described riser backbone subsystem is positioned between vertical light current.
4. the comprehensive wiring system in intelligent building according to claim 1, is characterized in that: the cable of described horizontal subsystem is 4 pairs of pair cables; The cable of described riser backbone subsystem is large logarithm pair cable or million cables.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520672009.7U CN204947494U (en) | 2015-09-02 | 2015-09-02 | Comprehensive wiring system in a kind of intelligent building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520672009.7U CN204947494U (en) | 2015-09-02 | 2015-09-02 | Comprehensive wiring system in a kind of intelligent building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204947494U true CN204947494U (en) | 2016-01-06 |
Family
ID=55014883
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520672009.7U Expired - Fee Related CN204947494U (en) | 2015-09-02 | 2015-09-02 | Comprehensive wiring system in a kind of intelligent building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204947494U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108663760A (en) * | 2018-05-10 | 2018-10-16 | 柳州市恒利电子科技有限公司 | A kind of computer network comprehensive wiring implementation |
-
2015
- 2015-09-02 CN CN201520672009.7U patent/CN204947494U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108663760A (en) * | 2018-05-10 | 2018-10-16 | 柳州市恒利电子科技有限公司 | A kind of computer network comprehensive wiring implementation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100515100C (en) | System and method for exchanging modules in switch | |
CN202886983U (en) | Intelligent comprehensive building wiring system | |
CN111952963A (en) | Construction area power distribution network fine planning method | |
CN103955870A (en) | Automatic distribution method for optical cables of process layer of intelligent substation secondary system | |
CN204947494U (en) | Comprehensive wiring system in a kind of intelligent building | |
CN103187801A (en) | Optical fiber distribution frame port configuration method in intelligent transformer substation secondary system | |
CN103474923A (en) | Premise distribution system of composite department type office building | |
CN107528253A (en) | The design method of computer network comprehensive wiring | |
CN207354524U (en) | A kind of electronic wiring frame wire connection structure | |
CN106486937A (en) | A kind of comprehensive wiring system in intelligent building | |
CN105530556B (en) | Electric power dispatching exchange system | |
CN204009561U (en) | Intelligent substation comprehensive wiring system | |
CN210605143U (en) | Intelligent comprehensive wiring system for building | |
CN201266948Y (en) | System for implementing multi-networking mode of monitoring transmission system based on E1 | |
CN204214960U (en) | A kind of device detected for merge cells | |
CN204945459U (en) | A kind of comprehensive wiring wire jumper management distributing frame | |
CN205809604U (en) | A kind of power scheduling intelligence multitask stipulations device | |
CN208673332U (en) | A kind of Android system core control panel of band LTE communication function | |
CN205040038U (en) | Multifunctional communication device | |
CN103529913B (en) | Communication equipment distributed system and backboard BASE bus self adaptation implementation method thereof | |
CN204462481U (en) | A kind of one side intersects jumping fiber main distribution frame for fiber entirely | |
CN205104769U (en) | Double -deck built on stilts GIS combined electrical apparatus of being qualified for next round of competitions and distribution lines layout structure thereof | |
CN107546664A (en) | A kind of building intellectualization comprehensive wiring system | |
CN107579485A (en) | A kind of Premises Distribution System | |
CN203933842U (en) | The communication structure that a kind of thermal power plant information system is optimized |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160106 Termination date: 20160902 |
|
CF01 | Termination of patent right due to non-payment of annual fee |