Prior art keywords
wall
concrete wall
powerful
strengthening rib
metope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520578675.4U
Other languages
Chinese (zh)
Inventor
徐云林
吴关保
刘小炎
林新春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Lush Construction Engineering Co ltd
Original Assignee
Jiangxi Tianfeng Construction Group Co Ltd
Yunlin Construction Group Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Tianfeng Construction Group Co Ltd, Yunlin Construction Group Ltd Co filed Critical Jiangxi Tianfeng Construction Group Co Ltd
Priority to CN201520578675.4U priority Critical patent/CN204919599U/en
Application granted granted Critical
Publication of CN204919599U publication Critical patent/CN204919599U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a hydraulic engineering retaining wall with powerful stiffener, including road bed and concrete wall, concrete wall is including the first wall of slope and the second wall of being connected with the road bed, be equipped with the strengthening rib in the concrete wall, the strengthening rib includes horizontal strengthening rib and vertical strengthening rib, horizontal strengthening rib in stretching into the road bed is in the same place road bed and concrete wall fastening, the part cover that horizontal strengthening rib stretched into in the road bed has the bar chair, the concrete wall upper end is equipped with the overflow pipe, the overflow pipe is equipped with the block with first wall junction, the concrete wall top is equipped with the greenbelt, the greenbelt passes through the drain pipe with unnecessary log raft play. The utility model discloses the sound construction has increased holistic compressive property through horizontal and vertical strengthening rib, and waterproof performance and waterproof volume retaining wall have more in the past had showing and improve to the block makes whole drainage more smooth.

Description

With the retaining wall for hydraulic engineering of powerful stiffener
Technical field
The utility model belongs to hydraulic engineering technical field, relates to a kind of retaining wall for hydraulic engineering with powerful stiffener specifically.
Background technology
Retaining wall refers to that supporting Roadbed Soil or the hillside soil body are in order to prevent water and soil balance, also can reinforced soil slopes or stoneledge, prevents landslide, prevents soil block and stone from falling, to protect the safety of pedestrian and nearby buildings.Often Drainage Design is had, to prevent water from gathering after retaining wall, in order to avoid the excessive retaining wall that makes of hydraulic pressure is to collapsing in retaining wall.
What traditional anti-cob wall adopted is, and stone assembles forms, its structural strength is poor, construction period is long, poor impact resistance, easily cave in, it is arrange reinforcing bar in anti-cob wall inside that one is improved one's methods, but in existing anti-cob wall, the method to set up of reinforcing bar is too simple, its structure is also insecure, can not meet the hard requirement of hydraulic engineering.
Summary of the invention
In order to overcome the deficiency of existing technology, the utility model provides a kind of retaining wall for hydraulic engineering with powerful stiffener.
Technical solutions of the utility model are as described below:
With the retaining wall for hydraulic engineering of powerful stiffener, comprise roadbed and concrete wall, it is characterized in that, the second metope that described concrete wall comprises the first metope and is connected with described roadbed, and described first metope and described second metope are inclined-plane, reinforcing rib is provided with in described concrete wall, described reinforcing rib comprises cross reinforcing and vertical strengthening ribs, described cross reinforcing stretches in described roadbed and is tightened together with described concrete wall by described roadbed, the part cover that described cross reinforcing stretches in described roadbed has bar chair, described concrete wall upper end is provided with bleed off pipe, described bleed off pipe and described first metope junction are provided with block, described concrete wall top is provided with greenbelt, unnecessary water is discharged by gutter by described greenbelt.
Further, the angle of described second metope and horizontal plane is greater than the angle of described first metope and horizontal plane.
Further, described bleed off pipe is higher than described roadbed.
Further, described cross reinforcing and described vertical strengthening ribs are formed in one.
Further, described cross reinforcing undulate.
Further, described vertical strengthening ribs is U-shaped.
According to the utility model of said structure, its beneficial effect is, the utility model sound construction, horizontal and vertical reinforcing rib can by roadbed and very firm the linking together of retaining wall body, add overall compressive property, hydraulic engineering infrastructure or hydraulic engineering reinforcing can be applicable to, meet the requirement of construction of hydro project; The utility model retaining wall body, higher than roadbed, adds the water resistance of body of wall and the anti-water yield; By the application of block, decrease the risk of the foreign material blocking bleed off pipe in current, make whole draining more smooth; The application of greenbelt also contributes to improving greening environment, increases the solidifiability of body of wall.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In the drawings, 1, roadbed; 2, concrete wall; 2-1, the first metope; 2-2, the second metope; 3, greenbelt; 4, gutter; 5, bleed off pipe; 6, block; 7, cross reinforcing; 8, vertical strengthening ribs; 9, bar chair.
Detailed description of the invention
Below in conjunction with accompanying drawing and embodiment, the utility model is conducted further description:
As shown in Figure 1, the utility model provides a kind of retaining wall for hydraulic engineering with powerful stiffener, comprises roadbed 1 and concrete wall 2, and concrete wall 2 top is higher than roadbed 1.
The second metope 2-2 that concrete wall 2 comprises the first metope 2-1 and is connected with roadbed 1, and the first metope 2-1 and the second metope 2-2 is inclined-plane, the angle of the second metope 2-2 and horizontal plane is greater than the angle of the first metope 2-1 and horizontal plane.Be provided with reinforcing rib in concrete wall 2, reinforcing rib comprises cross reinforcing 7 and vertical strengthening ribs 8, and cross reinforcing 7 stretches in roadbed 1 and tightened together with concrete wall 2 by roadbed 1, and the part cover that cross reinforcing 7 stretches in roadbed 1 has bar chair 9.Preferably, cross reinforcing 7 and vertical strengthening ribs 8 are formed in one, and cross reinforcing 7 undulate, vertical strengthening ribs 8 is in U-shaped.
Concrete wall 2 upper end is provided with bleed off pipe 5, and bleed off pipe 5 and the first metope 2-1 junction are provided with block 6, and bleed off pipe 5 is higher than roadbed 1.
Concrete wall 2 top is provided with greenbelt 3, and unnecessary water is discharged by gutter 4 by greenbelt 3.
Should be understood that, for those of ordinary skills, can be improved according to the above description or convert, and all these improve and convert the protection domain that all should belong to the utility model claims.
By reference to the accompanying drawings exemplary description is carried out to the utility model patent above; the realization of obvious the utility model patent is not subject to the restrictions described above; as long as have employed the various improvement that method is conceived and technical scheme is carried out of the utility model patent; or the design of the utility model patent and technical scheme directly applied to other occasion, all in protection domain of the present utility model without to improve.

Claims (6)

1. with the retaining wall for hydraulic engineering of powerful stiffener, comprise roadbed and concrete wall, it is characterized in that, the second metope that described concrete wall comprises the first metope and is connected with described roadbed, and described first metope and described second metope are inclined-plane,
Reinforcing rib is provided with in described concrete wall, described reinforcing rib comprises cross reinforcing and vertical strengthening ribs, described cross reinforcing stretches in described roadbed and is tightened together with described concrete wall by described roadbed, and the part cover that described cross reinforcing stretches in described roadbed has bar chair
Described concrete wall upper end is provided with bleed off pipe, and described bleed off pipe and described first metope junction are provided with block,
Described concrete wall top is provided with greenbelt, and unnecessary water is discharged by gutter by described greenbelt.
2. the retaining wall for hydraulic engineering with powerful stiffener according to claim 1, is characterized in that, the angle of described second metope and horizontal plane is greater than the angle of described first metope and horizontal plane.
3. the retaining wall for hydraulic engineering with powerful stiffener according to claim 1, is characterized in that, described bleed off pipe is higher than described roadbed.
4. the retaining wall for hydraulic engineering with powerful stiffener according to claim 1, is characterized in that, described cross reinforcing and described vertical strengthening ribs are formed in one.
5. the retaining wall for hydraulic engineering with powerful stiffener according to claim 4, is characterized in that, described cross reinforcing undulate.
6. the retaining wall for hydraulic engineering with powerful stiffener according to claim 4, is characterized in that, described vertical strengthening ribs is U-shaped.
CN201520578675.4U 2015-08-05 2015-08-05 Hydraulic engineering retaining wall with powerful stiffener Expired - Fee Related CN204919599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520578675.4U CN204919599U (en) 2015-08-05 2015-08-05 Hydraulic engineering retaining wall with powerful stiffener

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520578675.4U CN204919599U (en) 2015-08-05 2015-08-05 Hydraulic engineering retaining wall with powerful stiffener

Publications (1)

Publication Number Publication Date
CN204919599U true CN204919599U (en) 2015-12-30

Family

ID=54968743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520578675.4U Expired - Fee Related CN204919599U (en) 2015-08-05 2015-08-05 Hydraulic engineering retaining wall with powerful stiffener

Country Status (1)

Country Link
CN (1) CN204919599U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108774960A (en) * 2018-08-30 2018-11-09 中铁六局集团广州工程有限公司 A kind of armored concrete tube coupling and water supply and sewage culvert pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108774960A (en) * 2018-08-30 2018-11-09 中铁六局集团广州工程有限公司 A kind of armored concrete tube coupling and water supply and sewage culvert pipe

Similar Documents

Publication Publication Date Title
CN202644338U (en) Ecological water holding paving brick
CN205711967U (en) A kind of hydraulic engineering protective slope
CN204919599U (en) Hydraulic engineering retaining wall with powerful stiffener
CN201695296U (en) Floor tile with rapid draining
CN203129176U (en) Moistureproof wall structure
CN205171532U (en) Permanent side slope supporting construction
CN203022011U (en) Straw rope type full-ecological slope protection structure
CN205277434U (en) Tunnel portal pre -reinforcing structure
CN204343243U (en) A kind of water conservancy ecosystem wall
CN107401205A (en) A kind of karst depression rainfall utilizes system
CN211228538U (en) Reinforced structure of road side slope
CN207828733U (en) A kind of novel water permeable concrete road
CN204662366U (en) Be provided with the Simple anti-overflow stream blocking dam of verge board
CN204826144U (en) Infiltration drain pipe
CN207537965U (en) A kind of hydraulic engineering earth-retaining bank protection with scour resistance
CN204418212U (en) A kind of Novel retaining wall of hydraulic engineering
CN205000345U (en) Slope planting soil property bearing structure
CN104389316A (en) Pressure-proof structure of underground tunnel
CN206396580U (en) A kind of and catch basin, which is matched somebody with somebody, shares dankness type abutment wall
CN205100354U (en) Side slope with escape canal
CN205259211U (en) Hydraulic engineering retaining wall
CN203821930U (en) Wind resistance drainage housing architecture
CN204001049U (en) High building top layer collection rain and layering water storage system that the prevention waterlogging water saving of a kind of city develops simultaneously
CN204000930U (en) Retaining wall for hydraulic engineering
CN203174671U (en) Fitness groundwater perfusion device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Xu Chengxi

Inventor after: Xu Jinshui

Inventor before: Xu Yunlin

Inventor before: Wu Guanbao

Inventor before: Liu Xiaoyan

Inventor before: Lin Xinchun

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20170120

Address after: 334600 Shangrao Province, Guangfeng District, Feng Shan Street, Chau Road

Patentee after: Jiangxi lush Construction Engineering Co.,Ltd.

Address before: 334600 Jiangxi city of Shangrao province Guangfeng County Luzhou Avenue (Yonghe village, the original stone village)

Patentee before: YUNLIN CONSTRUCTION Group Ltd.

Patentee before: JIANGXI TIANFENG CONSTRUCTION GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230

CF01 Termination of patent right due to non-payment of annual fee