CN204898705U - Embedded tower crane basis - Google Patents

Embedded tower crane basis Download PDF

Info

Publication number
CN204898705U
CN204898705U CN201520576121.0U CN201520576121U CN204898705U CN 204898705 U CN204898705 U CN 204898705U CN 201520576121 U CN201520576121 U CN 201520576121U CN 204898705 U CN204898705 U CN 204898705U
Authority
CN
China
Prior art keywords
tower crane
fixed form
wood
described fixed
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520576121.0U
Other languages
Chinese (zh)
Inventor
岑禹翰
高阔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201520576121.0U priority Critical patent/CN204898705U/en
Application granted granted Critical
Publication of CN204898705U publication Critical patent/CN204898705U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to an embedded tower crane basis, including the fixed die plate that is used for concreting's cube shape, the wall of the fixed die plate outside is equipped with in proper order that a plurality of wood are stupefied, steel pipe and split bolt, wood is stupefied evenly enclose locate the fixed die plate around, and stupefied vertical setting of all following the fixed die plate of every wood, the steel pipe is followed respectively the level of fixed die plate to with vertical setting, two steel pipes that are parallel to each other that are located the fixed die plate both sides pass through split bolt fixed connection, the bottom surface elevation of basement bottom plate with the bottom surface elevation on the tower crane basis after the fixed die plate is pour is flat mutually, still be equipped with a plurality ofly along the level to the reinforcing bar that sets up in the fixed die plate, the structure reinforcing bar rigid coupling of reinforcing bar and mat foundation. The utility model discloses in, in the tower crane basis embedding basement bottom plate, form in unison wholly, when satisfying foundation engineering measure nature needs and functional demand, saved concrete and reinforcing bar quantity to the time limit for a project has been shortened.

Description

Embedded tower crane
Technical field
The utility model relates to building engineering field, particularly relates to a kind of embedded tower crane being applicable to basement.
Background technology
In recent years along with the prosperity and development of builing industry, the large-scale synthesis body of the office business that some function synthesizeds are strong is built widely, under own characteristic and economic benefit require to make the environment that its many places are little in construction plant, difficulty of construction is large; Meanwhile, the situations such as the construction of large-scale synthesis body also many constructions with huge foundation base plate, form of structure is complicated, measure is great in constructing amount.
The form of construction work of traditional tower crane, is the handling scope according to scene and transportation by lighter ability, tower crane is arranged on below basement sole plate, or tower crane end face is consistent with raft foundation end face.Above-mentioned form of construction work comprises following shortcoming:
One, if tower crane is arranged on below basement sole plate, then tower crane joint needs through raft foundation and waterproofing course, will certainly affect the waterproof effect on basis; Tower crane joint can produce constuction joint through raft foundation, and crack is easily expanded, and affects construction safety; Waterproofing work need be done by tower crane joint place, and welding steel plate for sealing water also carries out the paving of flexible waterproof material, and operation is difficulty very, time-consuming; Can waste tower crane one during raft foundation concrete construction and save base section, and after tower crane dismounting, the bar material in basis is not easy to reclaim, and causes the waste of cost and material.
Its two, if tower crane end face and the same absolute altitude of raft foundation end face, then raft plate is stressed indefinite, affects construction speed; And tower crane periphery to add do patching and bar splice work for the treatment of; First do raft foundation with the tower crane of lower part, such as plank thickness is less than tower crane height, then tower crane is built at twice, there is horizontal construction joint during construction, affects the overall function of tower crane; Equally, after tower crane is removed, the reinforcing bar in basis is not easy to reclaim, and causes the wasting of resources.
Therefore, how to provide a kind of safe and practical, construction quality good, the embedded tower crane of cost-saving, duration and material, become the technical problem that those skilled in the art are urgently to be resolved hurrily.
Utility model content
The utility model provides a kind of embedded tower crane, to solve the problems of the technologies described above.
For solving the problems of the technologies described above, the utility model provides embedded tower crane, comprise the fixed form of the cubic shaped for concreting, be provided with outside the wall of described fixed form that some wood is stupefied successively, steel pipe and split bolt, described wood is stupefied to be evenly located in around described fixed form, and each wood is stupefied all along the vertical setting of described fixed form; Described steel pipe respectively along described fixed form level to vertical setting; Be parallel to each other two steel pipes being positioned at described fixed form both sides are fixedly connected with by described split bolt; The bottom surface absolute altitude of basement bottom board build with described fixed form after the bottom surface absolute altitude on tower crane basis equal; Also be provided with some reinforcing bars horizontally arranged in described fixed form, the structure reinforcing bars of described reinforcing bar and mat foundation is affixed.
Preferably, described fixed form build after tower crane basis around be welded with the thick steel plate for sealing water of 4mm, in the pre-buried concrete to described tower crane of described steel plate for sealing water, the pre-buried degree of depth is 1/2 of concrete thickness.
Preferably, described tower crane hangs mould respectively from described steel plate for sealing water.
Preferably, described fixed form adopts veneer to be formed by stacking, and the thickness of described veneer is 18mm, and the horizontal section of the fixed form of described cubic shaped is the rectangle of 6m × 6m, is highly 2m.
Preferably, described fixed form inside is equipped with split bolt, vertically arranges two-layer, and the transverse and longitudinal direction of every layer arranges three roads.
Preferably, described reinforcing bar forms three layers of two-way steel mesh reinforcement in described fixed form, is followed successively by basement bottom board end face arrangement of reinforcement, basement bottom board temperature distributing bar and basement bottom board bottom surface reinforcing bar from top to bottom.
Preferably, the stupefied employing sectional dimension of described wood is the lumps of wood of 50mm × 100mm, spacing 150mm between every two lumps of wood.
Preferably, described tower crane comprises high building portion and podium portion, the C35 concrete contour with described king-tower building is built in the position that described tower crane is corresponding with king-tower building, and the thick C15 plain concrete anti-floating counterweight of 1m is built in the position that described tower crane is corresponding with podium.
Compared with prior art, the embedded tower crane tool that the utility model provides has the following advantages:
1, the utility model is by adopting the mode of the embedded tower crane of basement bottom board, first build tower crane, after-pouring basement bottom board, and basement bottom board bottom surface absolute altitude is built equal with tower crane bottom surface absolute altitude, form Unified Global, to meet the functional requirements of Foundation Design measure needs and structure;
2, tower crane basis is embedded in basement bottom board by the utility model, greatly saves the consumption of concrete and reinforcing bar, and ensure that the safety and reliability of tower crane, also shortens the construction period simultaneously;
3, after tower crane is removed, the recyclable recycling of the reinforcing bar in basis, cost-saving further.
Accompanying drawing explanation
Fig. 1 is the top view of the embedded tower crane of the utility model one specific embodiment mode;
Fig. 2 is the lateral view of the embedded tower crane of the utility model one specific embodiment mode;
Fig. 3 is the longitudinal sectional drawing of the embedded tower crane of the utility model one specific embodiment mode;
Fig. 4 is the transverse cross-sectional view of the embedded tower crane of the utility model one specific embodiment mode;
Fig. 5 is the embedded tower crane of the utility model one specific embodiment mode and the position relationship schematic diagram of basement bottom board.
In figure: 10-fixed form, 11-C35 concrete, 12-C15 plain concrete anti-floating counterweight, 20-wood are stupefied, 30-steel pipe, 40-split bolt, 50-reinforcing bar, 51-basement bottom board end face arrangement of reinforcement, 52-basement bottom board temperature distributing bar, 53-basement bottom board bottom surface reinforcing bar, 60-steel plate for sealing water, 70-basement bottom board.
Detailed description of the invention
In order to the technical scheme of the above-mentioned utility model of more detailed statement, below list specific embodiment and carry out Proof Technology effect; It is emphasized that these embodiments are not limited to for illustration of the utility model limit scope of the present utility model.
The embedded tower crane that the utility model provides, please refer to Fig. 1 to Fig. 5, comprise the fixed form 10 for the cubic shaped of concreting, be provided with outside the wall of described fixed form 10 that some wood is stupefied 20 successively, steel pipe 30 and split bolt 40, described wood stupefied 20 is evenly located in around described fixed form 10, and each wood stupefied 20 is all along the vertical setting of described fixed form 10; Described steel pipe 30 respectively along described fixed form 10 level to vertical setting, for fixing whole fixed form 10; Be parallel to each other two steel pipes 30 being positioned at described fixed form 10 both sides are fixedly connected with by described split bolt 40; The bottom surface absolute altitude of basement bottom board 70 build with described fixed form 10 after the bottom surface absolute altitude on tower crane basis equal; Also be provided with some reinforcing bars 50 horizontally arranged in described fixed form 10, described reinforcing bar 50 is affixed with the structure reinforcing bars of mat foundation.In the utility model, tower crane embeds in basement bottom board 70, forms Unified Global, while meeting Foundation Design measure needs and functional requirements, saves concrete and amount of reinforcement, and shorten the duration.
Preferably, please emphasis referring to figs. 2 to Fig. 4, described fixed form 10 build after tower crane basis around be welded with the thick steel plate for sealing water of 4mm 60, described steel plate for sealing water 60 is pre-buried in the concrete of described tower crane, the pre-buried degree of depth is 1/2 of concrete thickness, in the present embodiment, with electric welding by reinforcing bar 50 firm welding on steel plate for sealing water 60 and tower crane, the weld ripples of weld seam should be even, the defect such as must not have crack, slag inclusion, undercut, burn, like this, when formerly building tower crane basis, the integral waterproofing of mat foundation can be guaranteed.
Preferably, described tower crane hangs mould respectively from described steel plate for sealing water 60, avoid steel plate for sealing water 60 place due to firmness inadequate, cause tower crane to there is potential safety hazard.
Preferably, ask emphasis with reference to figure 1 and Fig. 2, described fixed form 10 adopts veneer to be formed by stacking, the thickness of described veneer is 18mm, the horizontal section of the fixed form 10 of described cubic shaped is the rectangle of 6m × 6m, is highly 2m, equal with the end face of described mat foundation.
Preferably, please continue to refer to Fig. 1 and Fig. 2, described fixed form 10 inside is equipped with split bolt 40, reinforce whole tower crane to run through tower crane, concrete set-up mode is: vertically arrange two-layer, and the transverse and longitudinal direction of every layer arranges three roads, to prevent the mould that rises, preferably, the described split bolt 40 in the present embodiment, adopts the Screw arbor with nut at both-ends drawknot steel pipe of M18.
Preferably, please emphasis with reference to figure 2, described reinforcing bar 50 forms three layers of two-way steel mesh reinforcement in described fixed form 10, be followed successively by basement bottom board end face arrangement of reinforcement 51, basement bottom board temperature distributing bar 52 and basement bottom board bottom surface reinforcing bar 53 from top to bottom, described three layers of two-way steel mesh reinforcement are formed integrated with described mat foundation, certainly, perforate on fixed form 10 is needed to carry out getting rid of muscle process.
Preferably, described wood stupefied 20 adopts sectional dimension to be the lumps of wood of 50mm × 100mm, and spacing 150mm between every two lumps of wood, is designated as 50*100150.
Preferably, please emphasis with reference to figure 3 and Fig. 4, the C35 concrete 11 contour with described king-tower building is built in the position that described tower crane is corresponding with king-tower building, the thick C15 plain concrete anti-floating counterweight 12 of H=1m is built in the position that described tower crane is corresponding with podium, final doors structure ground podium is consistent with king-tower building, therefore tower crane height is lower than basement bottom board 70 height, does not affect the Functional Requirement of main body base plate.
Please continue to refer to Fig. 1 to Fig. 5, the form of construction work of the embedded tower crane that the utility model provides is as follows:
S1: according to the position relationship of tower crane size and tower crane and basement bottom board 70, utilize described fixed form 10 and described wood stupefied 20 to carry out formwork;
S2: steel pipe 30 is set in described wood stupefied 20 peripheries, and fix with described split bolt 40;
S3: concreting in described fixed form 10, and get rid of muscle process;
S4: the reinforcing bar 50 thrown away in described tower crane is mechanically connected with the structure reinforcing bars of described mat foundation, guarantees the globality of basement bottom board 70;
S5: described tower crane and described basement bottom board 70 integral construction.
This tower crane is adopted to embed the form of construction work of basement bottom board 70, the functional requirements of Foundation Design measure needs and structure can either be met, save material, cost greatly, and ensure that the safety and reliability of tower crane, also shorten the construction period simultaneously.
Preferably, after the concrete strength of building when tower crane reaches standard value, carry out form removal, and dabbing process is carried out to the surrounded surface of described tower crane, to make the concrete of building in fixed form 10, there is good globality and connectivity.
In sum, the embedded tower crane that the utility model provides, comprise the fixed form 10 for the cubic shaped of concreting, be provided with outside the wall of described fixed form 10 that some wood is stupefied 20 successively, steel pipe 30 and split bolt 40, described wood stupefied 20 is evenly located in around described fixed form 10, and each wood stupefied 20 is all along the vertical setting of described fixed form 10; Described steel pipe 30 respectively along described fixed form 10 level to vertical setting; Be parallel to each other two steel pipes 30 being positioned at described fixed form 10 both sides are fixedly connected with by described split bolt 40; The bottom surface absolute altitude of basement bottom board 70 build with described fixed form 10 after the bottom surface absolute altitude on tower crane basis equal; Also be provided with some reinforcing bars 50 horizontally arranged in described fixed form 10, described reinforcing bar 50 is affixed with the structure reinforcing bars of mat foundation.In the utility model, tower crane embeds in basement bottom board 70, forms Unified Global, while meeting Foundation Design measure needs and functional requirements, saves concrete and amount of reinforcement, and shorten the duration.
Obviously, those skilled in the art can carry out various change and modification to utility model and not depart from spirit and scope of the present utility model.Like this, if these amendments of the present utility model and modification belong within the scope of the utility model claim and equivalent technologies thereof, then the utility model is also intended to comprise these change and modification.

Claims (8)

1. an embedded tower crane, it is characterized in that, comprise the fixed form of the cubic shaped for concreting, be provided with outside the wall of described fixed form that some wood is stupefied successively, steel pipe and split bolt, described wood is stupefied to be evenly located in around described fixed form, and each wood is stupefied all along the vertical setting of described fixed form; Described steel pipe respectively along described fixed form level to vertical setting; Be parallel to each other two steel pipes being positioned at described fixed form both sides are fixedly connected with by described split bolt; The bottom surface absolute altitude of basement bottom board build with described fixed form after the bottom surface absolute altitude on tower crane basis equal; Also be provided with some reinforcing bars horizontally arranged in described fixed form, the structure reinforcing bars of described reinforcing bar and mat foundation is affixed.
2. embedded tower crane as claimed in claim 1, it is characterized in that, described fixed form build after tower crane basis around be welded with the thick steel plate for sealing water of 4mm, in the pre-buried concrete to described tower crane of described steel plate for sealing water, the pre-buried degree of depth is 1/2 of concrete thickness.
3. embedded tower crane as claimed in claim 2, is characterized in that, described tower crane hangs mould respectively from described steel plate for sealing water.
4. embedded tower crane as claimed in claim 1, is characterized in that, described fixed form adopts veneer to be formed by stacking, and the thickness of described veneer is 18mm, and the horizontal section of the fixed form of described cubic shaped is the rectangle of 6m × 6m, is highly 2m.
5. embedded tower crane as claimed in claim 1, is characterized in that, described fixed form inside is equipped with split bolt, vertically arranges two-layer, and the transverse and longitudinal direction of every layer arranges three roads.
6. embedded tower crane as claimed in claim 1, it is characterized in that, described reinforcing bar forms three layers of two-way steel mesh reinforcement in described fixed form, is followed successively by basement bottom board end face arrangement of reinforcement, basement bottom board temperature distributing bar and basement bottom board bottom surface reinforcing bar from top to bottom.
7. embedded tower crane as claimed in claim 1, is characterized in that, the stupefied employing sectional dimension of described wood is the lumps of wood of 50mm × 100mm, spacing 150mm between every two lumps of wood.
8. embedded tower crane as claimed in claim 1, it is characterized in that, described tower crane comprises high building portion and podium portion, the C35 concrete contour with described king-tower building is built in the position that described tower crane is corresponding with king-tower building, and the thick C15 plain concrete anti-floating counterweight of 1m is built in the position that described tower crane is corresponding with podium.
CN201520576121.0U 2015-08-03 2015-08-03 Embedded tower crane basis Expired - Fee Related CN204898705U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520576121.0U CN204898705U (en) 2015-08-03 2015-08-03 Embedded tower crane basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520576121.0U CN204898705U (en) 2015-08-03 2015-08-03 Embedded tower crane basis

Publications (1)

Publication Number Publication Date
CN204898705U true CN204898705U (en) 2015-12-23

Family

ID=54920894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520576121.0U Expired - Fee Related CN204898705U (en) 2015-08-03 2015-08-03 Embedded tower crane basis

Country Status (1)

Country Link
CN (1) CN204898705U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002923A (en) * 2015-08-03 2015-10-28 上海建工五建集团有限公司 Embedded tower crane foundation and construction mode thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002923A (en) * 2015-08-03 2015-10-28 上海建工五建集团有限公司 Embedded tower crane foundation and construction mode thereof

Similar Documents

Publication Publication Date Title
CN102383443B (en) Connection structures between foundation pit support piles and outer walls of basement and construction method
CN102383418A (en) Anti-seismic prefabricated concrete solid square pile and production method thereof
CN202767522U (en) Shear wall reinforcing system in deformation joint
CN103982199A (en) Plug template, plug node and blocking method for template trolley for secondary lining of tunnel
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN201212148Y (en) Precipitation Well seal structure in foundation slab
CN105002923A (en) Embedded tower crane foundation and construction mode thereof
CN209817249U (en) A compound wallboard of prefabricated foam concrete for building infilled wall
CN215211876U (en) Waterproof hollow wall structure of precast concrete
CN105298015A (en) Light anti-seismic partition plate with integrated architectural surface and wall body and manufacturing method thereof
CN102322149B (en) Full-section overall casting construction method for circulating water pipe ditch of nuclear power plant
CN204898705U (en) Embedded tower crane basis
CN206308707U (en) A kind of city integrated Pipe rack of prefabricated assembled concrete
CN206521768U (en) A kind of shear connector in the double-deck box hat concrete combined structure of immersed tube tunnel
CN203603542U (en) Fabricated electronic workshop
CN207003465U (en) A kind of detachable prefabricated steel body tower crane
CN201915420U (en) Foundation of temporary gate building
CN105822023B (en) Suitable for the prefabricated shear connector, its forming method and loam wall of loam wall
CN213390825U (en) Wall structure of precast concrete double-sided superposed shear wall
CN111021613A (en) Assembled multi-ribbed beam cavity composite floor slab
CN211714180U (en) Assembled concrete frame structure
CN112575886A (en) Low-level and multi-level fully-prefabricated assembled concrete structure and design, production and installation method
CN206987059U (en) Connecting joint
CN102900195A (en) Inner wallboard and its manufacturing method
CN106436647A (en) Assembly type breakwater protective block body

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223