The foundation pit supporting construction of high strength
Technical field
The utility model relates to a kind of building structure, particularly a kind of foundation pit supporting construction of high strength.
Background technology
At present, the supporting and protection structure in shallow foundation hole is all lay bolting with wire mesh in the side of foundation ditch, and the anchor tube that anchor Netcom is crossed on foundation ditch side is solid, and this spline structure, because southern area rainwater is more, easily occurs that supporting intensity is not high enough, there is potential safety hazard.
Summary of the invention
The purpose of this utility model is to provide a kind of foundation pit supporting construction of high strength, and the technical problem that solve improves the intensity of supporting and protection structure.
For solving the problem, the utility model realizes by the following technical solutions: a kind of foundation pit supporting construction of high strength, comprise the anchor net be arranged in the side slope of foundation ditch, be embedded with one respectively in the top of described foundation ditch and the lower end of side slope and ranked first pile for prestressed pipe, second pile for prestressed pipe, described anchor net extends to the lower end of side slope along the side of foundation ditch, the top of described anchor net and the axis being parallel of the first pile for prestressed pipe, the upper end of described anchor net is fixedly connected with the upper end of the first pile for prestressed pipe, the lower end of anchor net is fixedly connected with the upper end of the second pile for prestressed pipe, the described side at foundation ditch and side slope are equipped with anchor tube, in the side that described anchor tube inserts foundation ditch and side slope, the rear end of anchor tube is fixedly connected with anchor net.
First pile for prestressed pipe described in the utility model is equal with the spacing of the second pile for prestressed pipe.
The side surface thereof of foundation ditch described in the utility model is provided with one and ranked third pile for prestressed pipe, and the upper end of described 3rd pile for prestressed pipe withstands on the side of foundation ditch, and the lower end of the 3rd pile for prestressed pipe is inserted in the bottom of foundation ditch.
The spacing of the 3rd pile for prestressed pipe described in the utility model is equal with the spacing of the second pile for prestressed pipe.
Anchor tube described in the utility model adopts resin anchor.
The degree of depth bottom the insertion foundation ditch of the 3rd pile for prestressed pipe lower end described in the utility model is 3 meters.
The utility model compared with prior art, adopt at the top of foundation ditch, the bottom of the lower end of side slope and foundation ditch all arranges row's pile for prestressed pipe, thus improve the intensity of the foundation pit supporting construction of high strength, avoid the potential safety hazard caused because rainwater weather causes supporting intensity not enough.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
As shown in Figure 1, the foundation pit supporting construction of high strength of the present utility model, be included in and be embedded with one respectively in the top of foundation ditch 1 and the lower end of side slope 2 and ranked first pile for prestressed pipe 4, second pile for prestressed pipe 5, first pile for prestressed pipe 4 and the second pile for prestressed pipe 5 respectively one_to_one corresponding are arranged, and spacing is equal, side along foundation ditch 1 is equipped with anchor net 3 to the lower end of side slope 2, the top of anchor net 3 and the axis being parallel of the first pile for prestressed pipe 4, bottom is laid along side slope 2, the upper end of anchor net 3 adopts the mode of welding to be fixedly connected with the pad of the upper end of the first pile for prestressed pipe 4, the lower end of anchor net 3 adopts the mode of welding to be fixedly connected with the pad of the upper end of the second pile for prestressed pipe 5, the side and side slope 2 of foundation ditch 1 are equipped with anchor tube 6, in the side that foundation ditch 1 is inserted in the front end of anchor tube 6 and side slope 2, the rear end of anchor tube 6 is fixedly connected with anchor net 3.
Further, in order to strengthen the intensity of the foundation pit supporting construction of high strength, the side surface thereof of foundation ditch 1 is provided with one and ranked third pile for prestressed pipe 7,3rd pile for prestressed pipe 7 is all arranged with first, second pile for prestressed pipe one_to_one corresponding, and spacing is equal, the upper end of the 3rd pile for prestressed pipe 7 withstands on the side of foundation ditch 1, and the lower end of the 3rd pile for prestressed pipe 7 is inserted in the bottom of foundation ditch 1, and the 3rd pile for prestressed pipe 7 degree of depth inserted bottom foundation ditch 1 is 3 meters.
The spacing of described first pile for prestressed pipe 4, second pile for prestressed pipe 5 and the 3rd pile for prestressed pipe 7 is 3 meters.
The axis of the 3rd pile for prestressed pipe 7 and the domatic parallel of side slope 2.
The utility model has by arranging pile for prestressed pipe in foundation ditch, and strengthen the intensity of the foundation pit supporting construction of high strength, prevent the side of foundation ditch from caving in, it is more regional that this structure is applicable to southern china rainwater.