CN204886016U - Big high drop cable machinery of cross -section long distance exhibition system of putting - Google Patents

Big high drop cable machinery of cross -section long distance exhibition system of putting Download PDF

Info

Publication number
CN204886016U
CN204886016U CN201520673861.6U CN201520673861U CN204886016U CN 204886016 U CN204886016 U CN 204886016U CN 201520673861 U CN201520673861 U CN 201520673861U CN 204886016 U CN204886016 U CN 204886016U
Authority
CN
China
Prior art keywords
cable
coaster
high drop
machinery
drop cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520673861.6U
Other languages
Chinese (zh)
Inventor
龚祖春
姚卫星
徐海林
李晓明
高鹏飞
刘玉杰
刘世华
侯德权
徐军
王静
刘世雄
李怀志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEZHOUBA GROUP'S ELECTRIC POWER Co Ltd
Original Assignee
GEZHOUBA GROUP'S ELECTRIC POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEZHOUBA GROUP'S ELECTRIC POWER Co Ltd filed Critical GEZHOUBA GROUP'S ELECTRIC POWER Co Ltd
Priority to CN201520673861.6U priority Critical patent/CN204886016U/en
Application granted granted Critical
Publication of CN204886016U publication Critical patent/CN204886016U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a big high drop cable machinery of cross -section long distance exhibition system of putting is including establishing the electric power transmission machine between cable drum and cable tractor, sharp coaster, loop type coaster, loop type coaster and cable contact surface be equipped with pressure sensors. The utility model has the advantages of, the machinery exhibition that can realize the high drop cable of big cross -section long distance is put, and the efficiency of construction is high, and the quality guarantees with safe can obtaining that the suitability is strong, easily popularizes and applies.

Description

A kind of heavy in section length is apart from high drop cable machinery unfolding system
Technical field
A kind of heavy in section of the utility model length, apart from high drop cable machinery unfolding system, relates to cable uncoiling field in power construction.
Background technology
In large hydropower station construction, usually run into heavy in section length apart from high drop cable unfolding problem, construction in the past adopts manually and strand mill is constructed, and efficiency is low, and construction quality and safety are difficult to guarantee.
Utility model content
For solving the problems of the technologies described above, the utility model provides a kind of heavy in section length apart from high drop cable machinery unfolding system, and can realize heavy in section length and unfold apart from the machinery of high drop cable, efficiency of construction is high, and quality and safety can be guaranteed, and applicability is strong.
Realizing the technical scheme that the utility model takes is: a kind of heavy in section length comprises apart from high drop cable machinery unfolding system the electric power conveyer, straight line coaster, the ring-like coaster that are located between cable hank and cable drawing machine;
Described ring-like coaster and conductive cable contacts face are provided with pressure inductor.
Further, unfolding system also comprises the corner tackle pulley be located between cable hank and cable drawing machine, and described corner tackle pulley is located at turning.
Further, cable hank is the cable hank of braking device.
Further, unfolding system comprises and also comprises data acquisition unit 9, and data acquisition unit 9 is connected with pressure inductor 8.
The utility model has the advantage of, put on exhibition route at high drop, arrange electric power conveyer, straight line coaster, the middle conveying system of ring-like coaster composition, effectively can improve cable and put exhibition efficiency, electric power conveyer is arranged in cable hank outlet section, turnaround section, vertical section and changeover portion, telpher is for strengthening cable at middle conveying system crossing intensity, cable is prevented to be stuck in local, pressure inductor can survey the change value of pressure in ring-like coaster and conductive cable contacts face, by judging the change of force value, can judge that stuck phenomenon appears in that local of middle conveying system, from the out of order speed of raising row.
Accompanying drawing explanation
Fig. 1 is that a kind of heavy in section of the utility model length is apart from high drop cable machinery unfolding system schematic.
Fig. 2 is that a kind of heavy in section of the utility model length is applicable to slope section schematic diagram apart from high drop cable machinery unfolding system.
A kind of heavy in section of Fig. 3 the utility model length is applicable to turnaround section schematic diagram apart from high drop cable machinery unfolding system.
Fig. 4 is that a kind of heavy in section of the utility model length is applicable to cable gallery import and export schematic diagram apart from high drop cable machinery unfolding system.
Fig. 5 is preferred snakelike fixing schematic diagram.
Fig. 6 is that the utility model controls schematic diagram.
As in figure, electric power conveyer 1, cable hank 2, straight line coaster 3, ring-like coaster 4, corner tackle pulley 5, cable drawing machine 6, cable 7, pressure inductor 8, data acquisition unit 9, support 10, fixture 11, coaster 12.
Embodiment
As in Fig. 1, a kind of heavy in section length comprises apart from high drop cable machinery unfolding system the electric power conveyer 1, straight line coaster 3, ring-like coaster 4, the corner tackle pulley 5 that are located between cable hank 2 and cable drawing machine 6, and corner tackle pulley 5 is located at turning;
Be provided with at each ring-like coaster 4 and cable 7 contact-making surface and pressure inductor 8 is all set, as in Fig. 5, it is No. 1 that pressure inductor 8 is compiled successively, No. 2 ... to No. N, preferably, data acquisition unit 9 is connected with pressure inductor 8, and collect the pressure value of the pressure inductor 8 of each ring-like coaster 4, ring-like coaster 4 often rotates a circle, pressure inductor 8 at least can gather a cable 7 and ring-like coaster 4 pressure value, if there is cable drawing machine 6 cannot trailing cable 7 time, namely when cable 7 cannot move, first few minutes pressure value change curve can be checked, on adjacent two ring-like coasters 4, occur that a pressure value declines, the situation that another pressure value rises, namely can prove, the stuck picture occurred between these two ring-like coasters 4 is existing.
Preferably, cable hank 2 is the cable hank of braking device.
as in Fig. 2, arrange one respectively at the discrepancy in elevation two endcable drawing machine 6, is provided with straight line coaster 3 on the slope, and slope two end arranges a ring-like coaster 4 respectively.
As in Fig. 3, set up a cable drawing machine 6 separately on limit, turning two, between the cable drawing machine 6 of two, turning, be provided with corner tackle pulley 5.
In Fig. 4, in cable gallery mouth, establish a cable drawing machine 6, at cable gallery mouth peripheral hardware cable hank 2, in cable gallery mouth place and road junction, at least respectively establish an annular coaster 4.
In Fig. 5, preferred snakelike fixing, comprise support 10 that at least three groups are parallel to each other, support 10 be located at fixture 11, cable 7 under coaster 12 guides successively through fixture 11.
implementation step:
1, the preparation of construction equipment, equipment
By required facility, material before construction, detect, the instrument and meter of test on deck, and the equipment come into operation to all, facility, instrument and meter carefully all should check, clean, clean and check.
2, channel cleanup
Cleaning clean thus on cable trace must to clean out all stones or other may damage the object of cable.Check that bending radius when cable trace must guarantee that cable is installed meets the demands.Arrange construction power supply and lighting along cable run, the security protection of the scaffold used when checking that cable rack is installed, guarantees to use safely.
3, coaster and telpher are installed
Corner tackle pulley, annular coaster are arranged in all turnings, and the layout of corner tackle pulley should guarantee the bending radius > 15D of cable, and radius of turn should be large as far as possible; Corner tackle pulley adopts angle steel, expansion bolt etc. and structures fixation around.Arrange telpher according to stressing conditions, typical facility are arranged and are seen Fig. 1 ~ Fig. 5.Facility should arrange each control cabinet while arranging, and control cables, and facility deploy, and carry out wiring to control loop, and charged debugging, finally need to carry out Coupled motion debugging.
4, cable hank is in place
Laying starting point layout cable hank.Make cable draw from the top of cable hank when should notice that cable hank is in place, avoid in laid processes, when stopping traction, the cable that dish relaxes and earth surface and be scratched or make Cable Bending Radius too small.After cable hank is in place on cable rack, starts brake apparatus is installed, install and debug, guarantee that braking effect is good.For guaranteeing the stable of cable hank, adopting earth anchor and bracing wire attached cable frame, preventing from toppling.
5, cable laying
In all gallerys, along cable trace, 1 controllers is set every 30 meters, is responsible for control cables and normally advances on all coasters, control coaster and normally work (keeping correct direction), and control cables does not produce with body of wall or metallic support and rubs.
6, cable is fixed
(1) at tunnel horizontal cable interlayer internal fixtion cable
According to construction plan installing cables, form snakelike layout (vertical snakelike sagging: to be about D, the D=outside diameter of cable), fix with fixture.In addition, the cable needs that also a minimum range 100mm should be had to expand to meet cable with metope or support.Cable is installed into slight sine curve when moving towards, and cable, under longitudinal thermal expansion influence, can make it move freely by increasing or reduce wave amplitude.
(2) cable is in the shaft fixed
From bottom cable end, fasten fixture upwards extend to top cable end one by one, gradually slight from top releases cable to form the sag of an about 150mm between two continuous print fixtures.Where necessary, winch and conveyer can be used gently to draw forward cable snakelike to become.

Claims (4)

1. heavy in section length is apart from a high drop cable machinery unfolding system, it is characterized in that: described unfolding system comprises the electric power conveyer (1), straight line coaster (3), the ring-like coaster (4) that are located between cable hank (2) and cable drawing machine (6);
Described ring-like coaster (4) and cable (7) contact-making surface are provided with pressure inductor (8).
2. a kind of heavy in section according to claim 1 length is apart from high drop cable machinery unfolding system, it is characterized in that: described unfolding system also comprises the corner tackle pulley (5) be located between cable hank (2) and cable drawing machine (6), described corner tackle pulley (5) is located at turning.
3. a kind of heavy in section according to claim 1 length is apart from high drop cable machinery unfolding system, it is characterized in that: the cable hank that described cable hank (2) is braking device.
4. a kind of heavy in section length, apart from high drop cable machinery unfolding system, is characterized in that: described unfolding system comprises and also comprises data acquisition unit (9), and data acquisition unit (9) is connected with pressure inductor (8) according to claim 1.
CN201520673861.6U 2015-09-02 2015-09-02 Big high drop cable machinery of cross -section long distance exhibition system of putting Active CN204886016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520673861.6U CN204886016U (en) 2015-09-02 2015-09-02 Big high drop cable machinery of cross -section long distance exhibition system of putting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520673861.6U CN204886016U (en) 2015-09-02 2015-09-02 Big high drop cable machinery of cross -section long distance exhibition system of putting

Publications (1)

Publication Number Publication Date
CN204886016U true CN204886016U (en) 2015-12-16

Family

ID=54830348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520673861.6U Active CN204886016U (en) 2015-09-02 2015-09-02 Big high drop cable machinery of cross -section long distance exhibition system of putting

Country Status (1)

Country Link
CN (1) CN204886016U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105870841A (en) * 2016-06-07 2016-08-17 国网山东省电力公司经济技术研究院 Automatic cable traction device
CN106099772A (en) * 2016-08-19 2016-11-09 中国葛洲坝集团机电建设有限公司 A kind of brakes for cable laying and braking method
CN108988215A (en) * 2018-08-07 2018-12-11 国网江苏省电力有限公司无锡供电分公司 High pressure electric cable with large cross-section route can right position height adjustment laying engineering method
CN111711122A (en) * 2020-06-04 2020-09-25 国网山东省电力公司德州供电公司 Laying device for underground cable line
CN112478908A (en) * 2020-12-31 2021-03-12 扬州国电通用电力机具制造有限公司 Large-tonnage cable drum unfolding traction platform and unfolding traction method thereof
CN112838530A (en) * 2020-12-07 2021-05-25 石家庄铁道大学 Wiring unit for long-distance wire and wiring method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105870841A (en) * 2016-06-07 2016-08-17 国网山东省电力公司经济技术研究院 Automatic cable traction device
CN105870841B (en) * 2016-06-07 2018-02-06 国网山东省电力公司经济技术研究院 A kind of cable automatic traction device
CN106099772A (en) * 2016-08-19 2016-11-09 中国葛洲坝集团机电建设有限公司 A kind of brakes for cable laying and braking method
CN106099772B (en) * 2016-08-19 2018-07-06 中国葛洲坝集团机电建设有限公司 A kind of braking system and braking method for cable laying
CN108988215A (en) * 2018-08-07 2018-12-11 国网江苏省电力有限公司无锡供电分公司 High pressure electric cable with large cross-section route can right position height adjustment laying engineering method
CN111711122A (en) * 2020-06-04 2020-09-25 国网山东省电力公司德州供电公司 Laying device for underground cable line
CN112838530A (en) * 2020-12-07 2021-05-25 石家庄铁道大学 Wiring unit for long-distance wire and wiring method thereof
CN112478908A (en) * 2020-12-31 2021-03-12 扬州国电通用电力机具制造有限公司 Large-tonnage cable drum unfolding traction platform and unfolding traction method thereof

Similar Documents

Publication Publication Date Title
CN204886016U (en) Big high drop cable machinery of cross -section long distance exhibition system of putting
CN104993422A (en) Line inspection robot on-line and off-line device and line inspection robot on-line and off-line system provided with same
CN103633583B (en) Bridge running line method under cable based on combined type running line cage
CN104167694A (en) Method for laying cable with hemp ropes in vertical shaft of mine
CN203747311U (en) Large-diameter superhigh voltage cable extending placing apparatus
KR101261458B1 (en) many cable pulling equipment of underground cable
CN103241586A (en) Opened cable conveyor, transformation method and novel cable laying construction method
CN203932810U (en) Walk on overhead ground wire drive saddle line inspection device and this device across tower guide rail
CN201758254U (en) Horizontal double-roller cable guiding device
CN103730866B (en) A kind of cable-laying gear
CN103574158A (en) Super-large diameter pressure steel tube inclined shaft three-hanging-point installation method
CN210286511U (en) Ground cable guiding device for high-voltage cable of crane
CN107238907A (en) Aerial optical cable laying system and aerial optical cable laying method
CN103775734A (en) Large-diameter underground gas drainage pipeline system construction method
CN214660350U (en) Split initial tunneling pipeline extension supporting device of shield tunneling machine
CN204851329U (en) Interim handing equipment of crag pipeline
CN209805306U (en) Simple cable paying-off support using bridge stand column
CN205016942U (en) Novel rotatory electric cable frame
CN103264709B (en) Underground mine automatic tramcar stopper for inclined shaft and inclined shaft automatic car stopping system
CN205565554U (en) Testing and maintenance device of power shovel cable in pit
CN209488135U (en) A kind of equipment for Electrical Equipments of Coal Mine installing engineering
CN212366782U (en) Support device for ground cable
CN205319664U (en) Supporting mechanism and ground wire disconnect device of ground wire disconnect ware
CN110282486A (en) Power construction actinobacillus device
CN203151017U (en) Linear support for cable laying