CN204877483U - Bucket that excavator was used - Google Patents

Bucket that excavator was used Download PDF

Info

Publication number
CN204877483U
CN204877483U CN201520649429.3U CN201520649429U CN204877483U CN 204877483 U CN204877483 U CN 204877483U CN 201520649429 U CN201520649429 U CN 201520649429U CN 204877483 U CN204877483 U CN 204877483U
Authority
CN
China
Prior art keywords
bucket
blade
corner
pair
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520649429.3U
Other languages
Chinese (zh)
Inventor
王振强
林波
魏奇科
朱平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201520649429.3U priority Critical patent/CN204877483U/en
Application granted granted Critical
Publication of CN204877483U publication Critical patent/CN204877483U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model relates to a bucket that excavator was used, including the bucket main part, the bucket main part includes two curb plates and bottom plate, two curb plates all have the cambered surface limit, and bottom plate fixed connection is between the cambered surface limit of two curb plates, one side edge of bottom plate is fixed with the labial lamina, is fixed with the bucket tooth on the labial lamina, still includes a pair of blade and a pair of horn, a pair of blade sets up respectively on the lateral wall of two curb plates, and the top of blade up, the horn sets firmly in the bucket main part top outside, and a pair of horn sets up the front and back both sides at bucket main part top. This bucket can improve excavation efficiency, realizes mechanical secondary and maintain that it is safer to be under construction, and efficiency is higher, has very big commonality in tunnel construction owes to dig the processing, can be widely used.

Description

A kind of bucket of excavator
Technical field
The utility model relates to engineering machinery field, is specifically related to the bucket of excavator.
Background technology
First existing earth tunnel adopts excavator to excavate usually, excavation work mainly uses bucket to carry out, see Fig. 1, existing bucket mainly comprises bucket main body, bucket main body comprises two side plates 11 and base plate 13, two side plates 11 to be had cambered surface limit 11a base plate 13 respectively and is fixedly connected between the cambered surface limit 11a of two side plates; One side of base plate 13 is fixed with labial lamina 15, labial lamina 15 is fixed with bucket tooth 14.
When adopting above-mentioned bucket to excavate, because position, corner, tunnel cannot operate, manual amendment therefore must be adopted to process owing to dig position, when carrying out manual amendment process, loosen owing to excavating the Rock And Soil caused, workman is extremely dangerous when repairing, particularly work as rock crusher, when intensity is poor; Top, tunnel and arch crown part owe to dig process simultaneously needs by chassis construction, and finishing required time is longer.Artificial process of owing to dig to tunnel is crisis construction worker safety always, causes a construction speed difficult point slowly.
Utility model content
For the problems referred to above that prior art exists, the purpose of this utility model is: provide a kind of convenient excavation, and excavate the bucket of the high excavator of efficiency.
For achieving the above object, the utility model adopts following technical scheme: a kind of bucket of excavator, comprises bucket main body, and bucket main body comprises two side plates and base plate; Two side plates all have cambered surface limit, and base plate is fixedly connected between the cambered surface limit of two side plates; One side of base plate is fixed with labial lamina, labial lamina is fixed with bucket tooth, it is characterized in that: also comprise a pair blade and a pair corner; Described a pair blade is separately positioned on the lateral wall of two side plates, and the top of blade upward; Described corner is installed in outside bucket body top, and a pair corner is arranged on the both sides, front and back of bucket body top.
As preferably, described side plate lateral wall is installed with the buckle for clamping blade.
As preferably, described blade two sides are respectively equipped with the projection to extending away from blade side, and projection is positioned at the top of blade.
As preferably, the top of described blade is reclinate hook assembling structure.
As preferably, the bottom in described corner has leg-of-mutton groove.
As preferably, the front-rear side walls in described corner is connected to reinforcing steel bar, the welded top of two solid steel bars is fixed.
Relative to prior art, the utility model tool has the following advantages: this bucket can improve excavation efficiency, and realize mechanical secondary finishing, construct safer, efficiency is higher, and owing to dig in process at constructing tunnel has great versatility, can widely use.Avoid falling rocks when artificial secondary is owed to dig finishing, cave in the threat of workman's life, ensure that the safety of owing to dig finishing, also accelerate finishing express delivery, improve efficiency of construction.
Accompanying drawing explanation
Fig. 1 is the structural representation of existing bucket.
Fig. 2 is the structural representation of a kind of bucket in the utility model.
Fig. 3 is the structural representation of blade described in Fig. 2.
Fig. 4 is the structural representation in corner described in Fig. 2.
The structural representation of another kind of bucket in Fig. 5 the utility model.
Fig. 6 is the structural representation of blade described in Fig. 5.
Fig. 7 is the structural representation in corner described in Fig. 5.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
See Fig. 2-Fig. 7, a kind of bucket of excavator, comprises bucket main body, and bucket main body comprises two side plates 11 and base plate 13; Two side plates 11 all have cambered surface limit 11a, and base plate 13 is fixedly connected between the cambered surface limit 11a of two side plates 11; One side of base plate 13 is fixed with labial lamina 15, labial lamina 15 is fixed with bucket tooth 14, also comprise a pair blade 30 and a pair corner 20; Corner is mainly used in face excavation, finishing and sidewall bottom finishing, and blade is used for excavation and the finishing of side wall upper part camber line position of tunnel tunnel face upper space.
A pair blade 30 is separately positioned on the lateral wall of two side plates 11, and the top of blade 30 upward; Conveniently fixed blade 30, when specifically implementing, side plate 11 lateral wall is installed with the buckle 11b for clamping blade 30, during use, the bottom of blade 30 is stuck in buckle 11b, and conveniently, it is bigger that buckle 11b can do, buckle 11b is coordinated with the bottom gap of blade 30, thus when bucket down, namely blade top down time, this blade 30 can come off under its Action of Gravity Field from buckle 11b, do not need specially to dismantle, easy to use.
When earth tunnel rock integrity better, intensity is lower, crack is comparatively grown, without underground water, during the short 0.5 ~ 1.0m of cyclic advance, blade and corner can adopt the structure in Fig. 3 and 4.
Blade 30 two sides are respectively equipped with the projection 31 to extending away from blade 30 side, and projection 31 is positioned at the top of blade 30.Projection 31 can make triangular structure.And with the side of blade, there is the angle of 30-60 °.
The longitudinal section in corner 20 is trapezoidal, has leg-of-mutton groove 21 bottom it.Conveniently be welded on outside bucket body top.Corner 20 is installed in outside bucket body top, and a pair corner 20 is arranged on the both sides, front and back of bucket body top (see Fig. 2, before sight line can be seen that the direction of side plate is defined as, paper extends internally, the direction of the side plate that sight line be can't see is defined as rear), during concrete enforcement, the both sides, front and back of what corner was passable be welded on bucket body top, the angle of corner and bucket body top camber line is 135 °.When front is when digging, the soil of bucket front and side can well be repaired.
When earth tunnel rock integrity is good, intensity is higher, crack agensis, and during the larger 1.0 ~ 2.0m of cyclic advance, corner and blade can adopt the structure in Fig. 6 and 7.
Blade 30 two sides are respectively equipped with the projection 31 to extending away from blade 30 side, and projection 31 is positioned at the top of blade 30, and projection 31 can make triangular structure.And with the side of blade, there is the angle of 30-60 °.Projection 31 its booster action main, can play reinforcement excavation effect, simultaneously when repairing sidewall, can also play the effect of subsidy finishing.The top of blade 30 is reclinate hook assembling structure 33, when soil property is harder, is more conducive to the soil property excavating bucket top and side.Blade 30 thickness is at about 5cm.
The longitudinal section in described corner 20 be trapezoidal, such structure in digging process, the damage area of its corner to the soil body can be improved on the one hand, on the other hand, the degree of wear in corner can be reduced, improve the useful life in corner.There is bottom corner leg-of-mutton groove 21, the front-rear side walls in corner 20 is connected to the welded top of reinforcing the solid steel bar 22 of steel bar 22, two and fixes.Conveniently install additional and dismantle and reinforce steel bar 22, multiple bolt hole can be set on the front-rear side walls in corner, by bolt and bolt hole, reinforcing steel bar 22 be fixed on the front-rear side walls of corner 20.Reinforce arranging of steel bar and enhance the destructive power of corner to the soil body on the one hand, add the scope of this corner finishing on the other hand, improve the applicability in corner.
Earth tunnel mechanical equivalent of light excavation and owe the process of digging finishing: during tunnel excavation, bucket moves downward excavation, returns when moving upward and utilizes corner to excavate, improves excavation efficiency, needs to carry out face and the deficient of side edge angular position digs process after excavation.Face is surrounding corner mainly, and sidewall is top and bottom mainly.When carrying out owing to dig process, first revise face, adopt the corner on transformation bucket both sides to process, processing sequence is first top, then surrounding, last bottom; The deficient of tunnel-side digs process, owes excavator body, then install blade in bucket side, by the deficient excavator body of blade cut side wall upper part, repair by the corner process lower sidewall of bucket.
Adopt the bucket after repacking to excavate tunnel and owe to dig finishing process, excavation efficiency can be improved, substitute the finishing of artificial secondary, ensure construction safety, also accelerate the speed of finishing simultaneously, save time, steel arch-shelf can be established as early as possible, support in time, guarantee the stable of tunnel.Simple to the method for modifying of bucket, to owe to dig finishing operation simple and direct, workable and safety is high.
What finally illustrate is, above embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, although be described in detail the utility model with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify to the technical solution of the utility model or equivalent replacement, and not departing from aim and the scope of technical solutions of the utility model, it all should be encompassed in the middle of right of the present utility model.

Claims (6)

1. a bucket for excavator, comprises bucket main body, and bucket main body comprises two side plates (11) and base plate (13); Two side plates (11) all have cambered surface limit (11a), and base plate (13) is fixedly connected between the cambered surface limit (11a) of two side plates (11); One side of base plate (13) is fixed with labial lamina (15), labial lamina (15) is fixed with bucket tooth (14), it is characterized in that: also comprise a pair blade (30) and a pair corner (20);
Described a pair blade (30) is separately positioned on the lateral wall of two side plates (11), and the top of blade (30) upward;
Described corner (20) is installed in outside bucket body top, and a pair corner (20) is arranged on the both sides, front and back of bucket body top.
2. bucket as claimed in claim 1, is characterized in that: described side plate (11) lateral wall is installed with the buckle (11b) for clamping blade (30).
3. bucket as claimed in claim 1 or 2, is characterized in that: described blade (30) two sides are respectively equipped with the projection (31) to extending away from blade (30) side, and projection (31) is positioned at the top of blade (30).
4. bucket as claimed in claim 3, is characterized in that: the top of described blade (30) is reclinate hook assembling structure (33).
5. bucket as claimed in claim 1, is characterized in that: the bottom of described corner (20) has leg-of-mutton groove (21).
6. the bucket as described in claim 1 or 5, is characterized in that: the front-rear side walls of described corner (20) is connected to and reinforces steel bar (22), and the welded top of two solid steel bars (22) is fixed.
CN201520649429.3U 2015-08-26 2015-08-26 Bucket that excavator was used Active CN204877483U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520649429.3U CN204877483U (en) 2015-08-26 2015-08-26 Bucket that excavator was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520649429.3U CN204877483U (en) 2015-08-26 2015-08-26 Bucket that excavator was used

Publications (1)

Publication Number Publication Date
CN204877483U true CN204877483U (en) 2015-12-16

Family

ID=54821866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520649429.3U Active CN204877483U (en) 2015-08-26 2015-08-26 Bucket that excavator was used

Country Status (1)

Country Link
CN (1) CN204877483U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105065006A (en) * 2015-08-26 2015-11-18 中冶建工集团有限公司 Bucket and excavator
CN106640095A (en) * 2016-12-15 2017-05-10 中建海峡建设发展有限公司 Standardbucket with scraper

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105065006A (en) * 2015-08-26 2015-11-18 中冶建工集团有限公司 Bucket and excavator
CN106640095A (en) * 2016-12-15 2017-05-10 中建海峡建设发展有限公司 Standardbucket with scraper
CN106640095B (en) * 2016-12-15 2019-08-27 中建海峡建设发展有限公司 A kind of excavator-type shovel clamshell excavator with scraper

Similar Documents

Publication Publication Date Title
CN102182472B (en) Backfill repairing method for tunnel collapse cavity
CN102268993B (en) Method for excavating tunnel in high liquid limit soil
CN105065006A (en) Bucket and excavator
CN205024740U (en) Civil engineering uses multi -functional excavating machinery
CN104594910A (en) Hydraulic rock-soil milling and excavating equipment and method for tunnel in soft and weak surrounding rock
CN103205923B (en) Quick and micro-seismic breaking method for bridge deck pavement concrete
CN204877483U (en) Bucket that excavator was used
CN103343688B (en) Surface mine clear end machine
CN203248165U (en) Excavating machine tool suitable for excavating at loess tunnel contour
CN203394529U (en) Foundation clearing machine for opencast mine
CN203494549U (en) Novel fixed hydraulic stone crusher
CN205188936U (en) Novel manual work of combination formula is dug hole rectangle friction pile and is protected concrete wall
CN106761800A (en) Support System in Soft Rock Tunnels excavation construction process
CN209443459U (en) Cut-pff wall assembled leads wall
CN208650130U (en) A kind of mini-excavator bucket
CN204715434U (en) A kind of excavator
CN202250096U (en) Bucket of tunnel excavator
CN203668994U (en) Ditcher
CN203531028U (en) Multifunctional auxiliary loading device integrating crushing and excavation
CN203145070U (en) Tree-clearing dozer blade used with bulldozer
CN202544007U (en) Loading shovel
CN205329753U (en) Weak broken surrounding rock tunnel excavator excavation auxiliary device
CN102561415A (en) Excavator
CN201810324U (en) Steel frame for supporting and protecting lower part of middle separation wall in early tunnel period
CN205532609U (en) Loess tunnel excavates dedicated excavator bucket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant