CN103205923B - Quick and micro-seismic breaking method for bridge deck pavement concrete - Google Patents

Quick and micro-seismic breaking method for bridge deck pavement concrete Download PDF

Info

Publication number
CN103205923B
CN103205923B CN201310118452.5A CN201310118452A CN103205923B CN 103205923 B CN103205923 B CN 103205923B CN 201310118452 A CN201310118452 A CN 201310118452A CN 103205923 B CN103205923 B CN 103205923B
Authority
CN
China
Prior art keywords
concrete
beam body
mating formation
hammer
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310118452.5A
Other languages
Chinese (zh)
Other versions
CN103205923A (en
Inventor
付香才
张奎
秦林
张家新
周建设
武伟华
张新明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Third Construction Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201310118452.5A priority Critical patent/CN103205923B/en
Publication of CN103205923A publication Critical patent/CN103205923A/en
Application granted granted Critical
Publication of CN103205923B publication Critical patent/CN103205923B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses a method for quickly and slightly breaking bridge deck pavement concrete, which utilizes the characteristics that bridge deck pavement and a beam body are poured in several times and have natural junction surfaces. The invention adopts mechanical operation, reduces the manual workload and greatly accelerates the construction speed; the breaking hammer is horizontally beaten, the action point is mainly on the demolished paved concrete, the vibration to the beam body is small, and the beam body is protected by the breaking hammer; the removed concrete is blocky, and the bridge floor has no slag, so that the concrete is convenient to clean; the concrete blocks are intensively broken, and the mixed ballast can be used in other projects, so that the energy conservation and the environmental protection are facilitated; the existing mature equipment is utilized, the popularization is facilitated, and the cost is low.

Description

A kind of deck paving of concrete is quick, microseism restructuring bankrupt
Technical field:
The present invention relates to bridge construction engineering field, particularly relate to a kind of deck paving of concrete fast, microseism restructuring bankrupt.
Background technology:
Along with the increase of existing highway bridge working life, reconstruction overhauled by the many needs of deck paving of concrete, and artificial pneumatic pick is abolished, hydraulic breaking hammer is abolished, splitting machine is abolished three kinds of modes and constructed in main employing at present. Artificial pneumatic pick is abolished to be needed in a large number manually, and efficiency is low; It is big that hydraulic breaking hammer abolishes vibration, easily the beam body of old bridge is caused damage, and some place forbids adopting; Splitting machine is abolished needs specific equipment, and cost height, efficiency is low. And above several method is after concrete is abolished, disintegrating slag dispersion is difficult to cleaning. Therefore imagination provides one method to address this problem.
Summary of the invention:
It is an object of the invention to provide a kind of invention, it is for avoiding the weak point existing for above-mentioned prior art, one is provided to utilize deck paving and beam body gradation to build, there is the feature in natural combination face, concrete cutting machine concrete cutting of mating formation becomes block, cut off reinforced mesh, reduce the cohesive force once removed, hydraulic breaking hammer is utilized to squeeze into bonding surface by the wedge shape tup after improvement, concrete of mating formation is caused to be separated with beam body, reaching the object abolished, the concrete blocks abolished adopts the shipment of fork truck monoblock. Be a kind of construction technology simply, rapidly and efficiently, to the old little constructional method of bridge shock damage.
The technical solution used in the present invention is:
A kind of deck paving of concrete is quick, microseism restructuring bankrupt, it is characterised in that, comprise the following steps:
A, according to the block size size formulated, at point ruling mated formation and release cutting on concrete.
B, artificial traction concrete cutting machine are along dividing a ruling, the vertical cutting whole into sections of concrete of mating formation.
The fragmentation of c, usage mining machine band is hammered into shape along mating formation concrete and beam body junction surface, by the dynamic concrete of mating formation of block sled, and separated concrete blocks moves side and concentrates stacking.
D, fork truck, by the concrete blocks entrucking of concentrated stacking, are transported to appointed place.
The piecemeal of described formulation is rectangular block, and its length of side is 100CM-200CM.
Described artificial traction concrete cutting machine is along dividing a ruling, the vertical cutting whole into sections of concrete of mating formation; Depth of cut to cut off reinforced mesh be advisable, control at about 2cm apart from beam body at the bottom of joint-cutting, prevent from switching to beam body.
Described usage mining machine band fragmentation hammer, along mating formation concrete and beam body junction surface, moves, by block sled, concrete of mating formation; First allowing excavator band fragmentation hammer in place, excavator to layout, retreats operation along abolishing direction along bridge; Secondly adjustment big arm of digger angle, breaking hammer head is made to be directed at mat formation concrete and beam body junction surface, wedge shape tup inclined-plane is parallel with bridge floor, start broken hammer, wedge shape tup is squeezed into bonding surface by level, causing concrete of mating formation to be separated with beam plate, every block concrete selects two point of application to squeeze into, and the concrete that can make to mat formation is separated completely with beam plate; Last excavator band fragmentation hammer stirs concrete blocks, is removed by concrete blocks, carries out next block and abolish, and separated concrete blocks moves side and concentrates stacking.
Compared with prior art, the useful effect of the present invention is:
The present invention adopts mechanized, reduces labor workload, greatly accelerates speed of application; Broken hammer level is hit and is beaten, and point of application is mainly mated formation on concrete in dismounting, and the vibrations of beam body are little, utilizes beam body to protect; The concrete removed is in block, and bridge floor, without disintegrating slag, is convenient to cleaning; Concrete blocks is concentrated and is abolished, and the mixed tiny fragments of stone, coal, etc. can use other engineerings, is conducive to energy-conserving and environment-protective; Utilizing existing mature equipment, be conducive to promoting, cost is low.
Accompanying drawing illustrates:
Accompanying drawing 1 is concrete piecemeal schematic diagram orthographic plan of the present invention;
Accompanying drawing 2 is concrete piecemeal schematic diagram sectional view of the present invention;
Accompanying drawing 3 is digging machine disintegrating hammer level of the present invention wedging schematic diagram;
Accompanying drawing 4 is concrete blocks of the present invention stripping schematic diagram;
Accompanying drawing 5 is concrete blocks of the present invention shipment schematic diagram.
Embodiment:
Below in conjunction with accompanying drawing, by embodiment, the present invention is described in further detail:
The first step, according to the block size size formulated, divides ruling what releasing on concrete of mating formation was cut.
First concrete cutting machine concrete 3 of mating formation is adopted to be cut into bulk, size control, at about 150cm �� 150cm, makes the appropriate adjustments according to practical situation, depth of cut to cut off reinforced mesh 2 be advisable, joint-cutting 1 end, controls at about 2cm apart from beam body 4, prevents from switching to beam body 4.
Then excavator band fragmentation hammer is in place, and excavator to layout, retreats operation along abolishing direction along bridge. Adjustment big arm of digger angle, breaking hammer head is made to be directed at mat formation concrete 3 and beam body 4 junction surface, wedge shape tup inclined-plane is parallel with bridge floor, start broken hammer, wedge shape tup is squeezed into bonding surface by level, causing concrete 3 of mating formation to be separated with beam plate 4, every block concrete selects two point of application to squeeze into, and the concrete 3 that can make to mat formation is separated completely with beam plate 4.
Last excavator band fragmentation hammer stirs concrete blocks, is removed by concrete, carries out next block and abolish.
The concrete blocks 5 abolished adopts fork truck entrucking, is transported to appointed place.
In the present embodiment, the operations such as unwrapping wire, cutting, dismounting, shipment linearly arrange, and unwrapping wire is front, and cutting following closely, is then that excavator is abolished, and are finally fork truck shipments, and each procedure does not interfere with each other, and forms streamline operration, and operating efficiency is accelerated greatly.
Above-described embodiment is only the preferably enforcement mode of the present invention, and in addition, the present invention can also have other implementations. It should be noted that, under the prerequisite not departing from present inventive concept, any apparent improvement and modification all should fall within protection scope of the present invention.

Claims (1)

1. a deck paving of concrete fast, microseism restructuring bankrupt, it is characterised in that, comprise the following steps:
A, according to the block size size formulated, at point ruling mated formation and release cutting on concrete; The piecemeal of described formulation is rectangular block, and its length of side is 100CM-200CM;
B, artificial traction concrete cutting machine are along dividing a ruling, the vertical cutting whole into sections of concrete of mating formation; To cut off, reinforced mesh is as the criterion depth of cut, controls at about 2cm apart from beam body, prevent from switching to beam body at the bottom of joint-cutting;
The fragmentation of c, usage mining machine band is hammered into shape along mating formation concrete and beam body junction surface, by the dynamic concrete of mating formation of block sled, and separated concrete blocks moves side and concentrates stacking; Described usage mining machine band fragmentation hammer, along mating formation concrete and beam body junction surface, by the dynamic concrete of mating formation of block sled is: first allow excavator band fragmentation hammer in place, and excavator to layout, retreats operation along abolishing direction along bridge; Secondly adjustment big arm of digger angle, breaking hammer head is made to be directed at mat formation concrete and beam body junction surface, wedge shape tup inclined-plane is parallel with bridge floor, start broken hammer, wedge shape tup is squeezed into bonding surface by level, causing concrete of mating formation to be separated with beam plate, every block concrete selects two point of application to squeeze into, and the concrete that can make to mat formation is separated completely with beam plate; Last excavator band fragmentation hammer stirs concrete blocks, is removed by concrete blocks, carries out next block and abolish, and separated concrete blocks moves side and concentrates stacking;
D, fork truck, by the concrete blocks entrucking of concentrated stacking, are transported to appointed place.
CN201310118452.5A 2013-04-07 2013-04-07 Quick and micro-seismic breaking method for bridge deck pavement concrete Active CN103205923B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310118452.5A CN103205923B (en) 2013-04-07 2013-04-07 Quick and micro-seismic breaking method for bridge deck pavement concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310118452.5A CN103205923B (en) 2013-04-07 2013-04-07 Quick and micro-seismic breaking method for bridge deck pavement concrete

Publications (2)

Publication Number Publication Date
CN103205923A CN103205923A (en) 2013-07-17
CN103205923B true CN103205923B (en) 2016-06-01

Family

ID=48753316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310118452.5A Active CN103205923B (en) 2013-04-07 2013-04-07 Quick and micro-seismic breaking method for bridge deck pavement concrete

Country Status (1)

Country Link
CN (1) CN103205923B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328733B (en) * 2014-10-20 2016-06-15 芜湖市泰能电热器具有限公司 A kind of disintegrating machine
CN106245542A (en) * 2016-08-24 2016-12-21 北京中交桥宇科技有限公司 Quickly cut bridge deck concrete construction technology
CN108103918A (en) * 2017-11-27 2018-06-01 广东和立土木工程有限公司 A kind of construction method for removing reinforced concrete bridge deck
CN108643062A (en) * 2018-05-31 2018-10-12 广东和立土木工程有限公司 A kind of device and method cutting bridge floor armored concrete united layer
CN111424511A (en) * 2020-04-29 2020-07-17 建德托程自动化设备有限公司 Brick dismounting device for road construction
CN113293683B (en) * 2021-05-25 2022-08-09 无锡市盛达建筑安装工程有限公司 Municipal construction is with ground destruction-free underground construction device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003066966A1 (en) * 2002-02-07 2003-08-14 Masao Inuzuka Block having surface layer piece attached thereto
CN101265690A (en) * 2007-10-08 2008-09-17 中铁四局集团有限公司 Method for protectively dismantling arch bridge
CN101415886A (en) * 2006-03-29 2009-04-22 格林安株式会社 Method for removing asphalt pavement, system for removing asphalt pavement, electromagnetic induction coil unit, device for removing asphalt pavement, and method for stripping asphalt pavement
CN102808526A (en) * 2011-06-01 2012-12-05 永升建设集团有限公司 Nondestructive demolition construction method of reinforced concrete frame beam
CN102979032A (en) * 2012-12-27 2013-03-20 南京英达公路养护车制造有限公司 Method for prying and collecting old material of asphalt pavement

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6595718B2 (en) * 2001-09-19 2003-07-22 Works R&D, Inc. Exo-lift

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003066966A1 (en) * 2002-02-07 2003-08-14 Masao Inuzuka Block having surface layer piece attached thereto
CN101415886A (en) * 2006-03-29 2009-04-22 格林安株式会社 Method for removing asphalt pavement, system for removing asphalt pavement, electromagnetic induction coil unit, device for removing asphalt pavement, and method for stripping asphalt pavement
CN101265690A (en) * 2007-10-08 2008-09-17 中铁四局集团有限公司 Method for protectively dismantling arch bridge
CN102808526A (en) * 2011-06-01 2012-12-05 永升建设集团有限公司 Nondestructive demolition construction method of reinforced concrete frame beam
CN102979032A (en) * 2012-12-27 2013-03-20 南京英达公路养护车制造有限公司 Method for prying and collecting old material of asphalt pavement

Also Published As

Publication number Publication date
CN103205923A (en) 2013-07-17

Similar Documents

Publication Publication Date Title
CN103205923B (en) Quick and micro-seismic breaking method for bridge deck pavement concrete
CN108708305B (en) Construction method for dismantling low-pier bridge
CN104929176A (en) Special hydraulic breaking device for pavement breaking
CN105065006A (en) Bucket and excavator
CN204877475U (en) Hydraulic pressure quartering hammer drill rod
CN209816623U (en) Expansion joint cutting mechanism, concrete paving mechanism and concrete paver
CN204456258U (en) With the loader of crushing function
CN204826030U (en) Broken special hydraulic pressure breaker in road surface
CN108487224A (en) A kind of construction site battering ram
CN209816616U (en) Concrete paver
CN204877483U (en) Bucket that excavator was used
CN104032789A (en) Earthwork punning structure used with excavator
CN203531028U (en) Multifunctional auxiliary loading device integrating crushing and excavation
CN204877276U (en) Dig rig drill bit soon and optimize device
CN204023390U (en) A kind of excavator with pavement breaking function
CN203756165U (en) High-frequency vibrating rake device
CN104369165B (en) A kind of pneumatic pick for excavating architectural engineering rock foundation draws hole support frame
CN105926472A (en) Construction method for widening bridge based on water jet milling and concrete removing robot
CN208136894U (en) A kind of multi-functional electric pick head and its manufactured tamping unit
CN205088976U (en) Crisp alkali brick instrument of rejecting of ancient city wall
CN110387802A (en) A kind of road cement road surface live breaking method and road breaker entirely
CN208362876U (en) A kind of voussoir splitter for concrete splitting
CN204385801U (en) A kind of chain hammer that excavates breaks rock device
CN102168495A (en) Recycling of wall bricks of demolished buildings
CN202577405U (en) Scraper knife device and bulldozer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Fu Xiangcai

Inventor after: Zhang Kui

Inventor after: Qin Lin

Inventor after: Zhang Jiaxin

Inventor after: Zhou Jianshe

Inventor after: Wu Weihua

Inventor after: Zhang Xinming

Inventor before: Zhou Jianshe

Inventor before: Zhang Jiaxin

Inventor before: Fu Xiangcai

Inventor before: Wu Weihua

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant