CN204875523U - Arm installation is chosen with supplementary strutting arrangement and supporting component to bridge - Google Patents

Arm installation is chosen with supplementary strutting arrangement and supporting component to bridge Download PDF

Info

Publication number
CN204875523U
CN204875523U CN201520432989.3U CN201520432989U CN204875523U CN 204875523 U CN204875523 U CN 204875523U CN 201520432989 U CN201520432989 U CN 201520432989U CN 204875523 U CN204875523 U CN 204875523U
Authority
CN
China
Prior art keywords
connecting portion
bridge
fixed part
support apparatus
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520432989.3U
Other languages
Chinese (zh)
Inventor
李周
危媛丞
张鹏
郑荧光
李佳伦
祝荣杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201520432989.3U priority Critical patent/CN204875523U/en
Application granted granted Critical
Publication of CN204875523U publication Critical patent/CN204875523U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a bridge construction field discloses a bridge and has chosen arm installation with supplementary strutting arrangement, should supplementary strutting arrangement including being used for supporting base on the basis, being used for supporting the bridge is chosen the supporting part of arm and is connected the base with connecting portion between the supporting part, wherein, connecting portion include interconnect's first connecting portion and second connecting portion at least, first connecting portion and second connecting portion have the connection structure who mutually supports each other, in order to pass through connection structure makes first connecting portion with the second connecting portion can be connected on the position of difference and be fixed by with respect to each other, thereby adjust the length of connecting portion. The utility model provides a pair of the bridge is chosen the arm installation and with supplementary strutting arrangement, should assisted strutting arrangement's length to adjust as required to the in -process of assembling in advance at the box beam provides stable, reliable support for the arm of choosing of the box beam that has isostructure not.

Description

Bridge chooses arm installation auxiliary support apparatus and supporting component
Technical field
The utility model relates to field of bridge construction, particularly, relates to a kind of bridge and chooses arm installation auxiliary support apparatus and supporting component.
Background technology
Steel box girder bridge refers to that girder is the beam bridge of thin-walled closed section form, and girder is often called box-girder or box-girder.Compared with the girder truss of routine, box-girder more can play the supporting capacity of steel plate effectively, and larger bending resistance and torsional rigidity can be provided based on the characteristic of its closed hollow section, in addition, the structure of box-girder is simple, paint is convenient, and due to its inside be closed space therefore more difficult corrosion.
Therefore, in field of bridge construction, usually use box-girder as the girder form of bridge, the box-girder also often adopted in Longspan Bridge (as suspension bridge, cable stayed bridge) is as the girder form of bridge.Can shown in reference diagram 1, box-girder is formed as T-shape, and what it comprised web grider 11 and was fixedly connected on web grider 11 both sides chooses arm 12.In actual applications, box-girder has the width (distance between the end referring to choose arm 12 to another end choosing arm 12) of 30-50m usually, and due to construction plant limited space, therefore box-girder needs to carry out in factory assembled in advance usually, that is: first, to need web grider 11 to be placed on moulding bed 13 so that the lifting of steel box-girder and avoid rubbing between steel box-girder and ground 15, afterwards, to arm 12 be chosen be welded on respectively the both sides of web grider 11, finally by haulage device, the box-girder after assembled will be transported to job site.In the pre-splicing process of assembling of box-girder, because the outer length of choosing of choosing arm 12 itself reaches more than 3m, terrain clearance is not less than 4m simultaneously, and the below of therefore choosing arm 12 in the pre-splicing process of assembling of box-girder needs to arrange temporary support, is supported on position to be welded will choose arm 12.In the prior art, usually adopt to have and supported choosing arm 12 by the support member 14 (as shown in fig. 1) with level altitude of shaped steel and Plate Welding.But, when box-girder has different cross sections, shaped steel and steel plate to be reselected according to the structure of choosing arm 12 to make the support member 14 with new height, in this case, not only need repeatedly installing/dismounting, and work consuming be time-consuming, increase cost of manufacture.Therefore, the applicability of support member 14 of the prior art is very low.In addition, the method also having some making factories often to use the backing plate of the rod member and respective numbers with level altitude to superpose in the pre-splicing process of assembling of box-girder supports chooses arm 12, due to rod member and backing plate himself elasticity and the gap that exists between it, therefore the non-constant of the stability of this support member, what support accordingly chooses arm 2 stability also non-constant, this makes the welding of choosing arm 12 there is larger error even mistake, greatly reduces the welding quality of box-girder.
Therefore, in prior art, in the pre-splicing process of assembling of box-girder, support member has some limitations the support of choosing arm.
Utility model content
The purpose of this utility model is to provide a kind of bridge and chooses arm installation auxiliary support apparatus, the length of this auxiliary support apparatus can regulate as required, with in the pre-splicing process of assembling of box-girder for the arm of choosing with the box-girder of different structure provides stable, supports reliably, and its structure is simple, with low cost.
To achieve these goals, the utility model provides a kind of bridge to choose arm installation auxiliary support apparatus, this auxiliary support apparatus comprises the base for being supported on basis, for supporting the support portion that arm chosen by described bridge and the connecting portion be connected between described base and described support portion, wherein, described connecting portion at least comprises interconnective first connecting portion and the second connecting portion, described first connecting portion and the second connecting portion have the syndeton cooperatively interacted each other, from described second connecting portion to be made described first connecting portion by described syndeton can relative to each other connect on different positions and fix, thus regulate the length of described connecting portion.
Preferably, described connecting portion comprises described first connecting portion and described second connecting portion, described support portion is connected to the end of the upper end of described first connecting portion, described base is fixed on the lower end of described second connecting portion, and described first connecting portion can be fixed on the end of the upper end of described second connecting portion on the different parts of the length direction of described first connecting portion by described syndeton.
Preferably, described first connecting portion and described second connecting portion are all formed as sleeve pipe, and the lower end of described first connecting portion is set in described second connecting portion.
Preferably, the cross section of described sleeve pipe is square or circular.
Preferably, described syndeton comprises the first fixed part and the second fixed part, described first connecting portion is provided with multiple described first fixed part be spaced along the length direction of described first connecting portion, the end of the described upper end of described second connecting portion is provided with multiple described second fixed part for matching with described multiple first fixed part along the length direction of described second connecting portion, the first fixed part described in any one of described first connecting portion can by dismountable fixture be fixed on described second connecting portion any one described in the second fixed part.
Preferably, described fixture is bearing pin, and described first fixed part and described second fixed part are all formed as through hole.
Preferably, between adjacent described first fixed part, be spaced apart setpoint distance, and described first connecting portion be provided with the bearing height mark corresponding respectively to the first fixed part described in each.
Preferably, described support portion is formed as tabular.
Preferably, described base is formed as tabular, and is provided with multiple deep floor between described base and described connecting portion.
On the basis of the above, the utility model also provides a kind of supporting component, this supporting component comprises bracing or strutting arrangement and correcting wedge, wherein, described bracing or strutting arrangement chooses arm installation auxiliary support apparatus for the bridge that the utility model provides, and described correcting wedge is placed on described support portion for the soffit supporting described bridge and choose arm.
Pass through technique scheme, arm installation auxiliary support apparatus chosen by the bridge that the utility model provides can adjustably connecting portion thus the whole height of auxiliary support apparatus can be regulated by arranging length, therefore, it is possible to be applicable to stablize, reliably support there is different ground clearances choose arm, there is good versatility.
Other features and advantages of the utility model are described in detail in detailed description of the invention part subsequently.
Accompanying drawing explanation
Accompanying drawing is used to provide further understanding of the present utility model, and forms a part for manual, is used from explanation the utility model, but does not form restriction of the present utility model with detailed description of the invention one below.In the accompanying drawings:
Fig. 1 uses supports support of the prior art to choose the schematic diagram of arm in the pre-splicing process of assembling of steel box-girder;
Fig. 2 is the schematic perspective view of the bracing or strutting arrangement of a kind of detailed description of the invention provided according to the utility model;
Fig. 3 is the schematic diagram of the bracing or strutting arrangement of the another kind of detailed description of the invention provided according to the utility model;
Fig. 4 uses the bracing or strutting arrangement of the detailed description of the invention provided according to the utility model to support the schematic diagram choosing arm in the pre-splicing process of assembling of steel box-girder.
Description of reference numerals
11 web griders; 12 choose arm; 13 moulding beds; 14 support members; 15 ground;
1 base; 2 support portions; 31 first connecting portions; 32 second connecting portions; 41 first fixed parts; 42 second fixed parts; 5 bearing pins; 6 deep floors; 7 correcting wedges.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in detail.Should be understood that, detailed description of the invention described herein, only for instruction and explanation of the utility model, is not limited to the utility model.
In the utility model, when not doing contrary explanation, the noun of locality of use is as upper and lower in " upper and lower " to typically refer to when each parts are under using state in the height direction; " inside and outside " refers to profile inside and outside relative to each parts itself, but the above-mentioned noun of locality is not limited to the utility model.
According to the specific embodiment of the present invention, a kind of bridge is provided to choose arm installation auxiliary support apparatus, this auxiliary support apparatus comprises the base 1 for being supported on basis, for supporting the support portion 2 that arm chosen by described bridge and the connecting portion be connected between described base 1 and described support portion 2, it is characterized in that, described connecting portion at least comprises interconnective first connecting portion 31 and the second connecting portion 32, described first connecting portion 31 and the second connecting portion 32 have the syndeton cooperatively interacted each other, from described second connecting portion 32 to be made described first connecting portion 31 by described syndeton can relative to each other connect on different positions and fix, thus regulate the length of described connecting portion.
In the pre-splicing process of assembling of bridge, just as mentioned in the background art, generally, comprise web grider 11 with assembled bridge and choose arm 12, before assembled, to need web grider 11 to be placed on moulding bed 13 so that the lifting of steel box-girder and avoid rubbing between steel box-girder and ground 15.And be usually supported on ground 15 for supporting the support member choosing arm 12.Therefore, in the auxiliary support apparatus that the utility model provides, described basis can refer to ground 15.By the auxiliary support apparatus using the utility model to provide, what only need to regulate the length of connecting portion just can support as required and have various sizes and height chooses arm, there is good versatility, stably can not only support and choose arm, but also can reuse, and use more for convenience, do not need to carry out to weld and wait comparatively time-consuming assembling procedure, only need adjustment first connecting portion 31 relative to the permanent position of the second connecting portion 32 and on this position, fix the support that namely the first connecting portion 31 can be used for choosing arm.
Detailed description of the invention of the present utility model is described in detail below in conjunction with Fig. 2 to Fig. 4.
In the detailed description of the invention that the utility model provides, the maximum length of connecting portion can be selected according to actual needs, and, when the maximum length of connecting portion is larger, in order to ensure the stability of connecting portion when maximum length, described connecting portion can comprise the first connecting portion, the second connecting portion, the 3rd connecting portion etc.Such as, when the auxiliary support apparatus that the utility model provides for support liftoff about about four meters choose arm time, because this distance is also little, therefore described connecting portion can comprise described first connecting portion 31 and described second connecting portion 32, described support portion 2 is connected to the end of the upper end of described first connecting portion 31, described base 1 is fixed on the lower end of described second connecting portion 32, and described first connecting portion 31 can be fixed on the end of the upper end of described second connecting portion 32 on the different parts of the length direction of described first connecting portion 31 by described syndeton.
In the detailed description of the invention that the utility model provides, as long as can realize the adjustment of connecting portion length, the first connecting portion 31, second connecting portion 32 is the 3rd connecting portion form that can be formed as any appropriate such as not shown even.Such as, when for support above-mentioned choose arm time, described first connecting portion 31 and described second connecting portion 32 all can be formed as sleeve pipe, and the lower end of described first connecting portion 31 is set in described second connecting portion 32.Therefore, the second connecting portion 32 not only for connecting and fixing the first connecting portion 31, also for guiding and limit the movement of the first connecting portion 31, thus is convenient to the adjustment of connecting portion length.
In above-mentioned detailed description of the invention, as long as can guaranteed strength, sleeve pipe can have the cross section of any desired configuration, and such as, the cross section of described sleeve pipe is square or circular.
In the detailed description of the invention that the utility model provides, described syndeton can adopt the set-up mode of any appropriate, as long as can connect relative to the second connecting portion 32 and fix the first connecting portion 31.Preferably, referring to figs. 2 and 3, described syndeton comprises the first fixed part 41 and the second fixed part 42, described first connecting portion 31 is provided with multiple described first fixed part 41 be spaced along the length direction of described first connecting portion 31, the end of the described upper end of described second connecting portion 32 is provided with multiple described second fixed part 42 for matching with described multiple first fixed part 41 along the length direction of described second connecting portion 32, first fixed part 41 described in any one of described first connecting portion 31 can by dismountable fixture be fixed on described second connecting portion 32 any one described in the second fixed part 42.
In above-mentioned detailed description of the invention, described fixture and the first fixed part 41 and the second fixed part 41 can be formed as the form of any appropriate, such as, described fixture is bearing pin 5, described first fixed part 41 is all formed as through hole with described second fixed part 42, when certain first fixed part 41 aligns with certain second fixed part 42, the connection between the first connecting portion 31 and the second connecting portion 32 can be realized in the through hole of bearing pin 5 insertion alignment and fix.
In addition, arm is chosen with what support liftoff known distance for the ease of selecting the height of auxiliary support apparatus, interval between adjacent described first fixed part 41 can be setpoint distance, and described first connecting portion 31 is provided with the bearing height mark corresponding respectively to the first fixed part 41 described in each.In this case, workman, when the auxiliary support apparatus using the utility model to provide, no longer needs to attempt the height regulating auxiliary support apparatus for one time one everywhere, but can be fixed according to corresponding first fixed part 41 of Marker selection.
Generally, described support portion 2 is formed as tabular, may be used on the one hand directly supporting choosing arm, on the other hand, when the soffit choosing arm is inclined surface, the correcting wedge 7 mentioned such as hereinafter can be placed on support portion 2 jointly to coordinate support by accessory.
And for base 1, its major function is for auxiliary support apparatus provides stable support, therefore, described base 1 can be formed as tabular, and is provided with multiple deep floor 6 between described base 1 and described connecting portion to increase the intensity between base 1 and the junction of connecting portion.
On the basis of the above, the utility model also provides a kind of supporting component, this supporting component comprises bracing or strutting arrangement and correcting wedge 7, wherein, described bracing or strutting arrangement chooses arm installation auxiliary support apparatus for the bridge that the utility model provides, and described correcting wedge 7 is placed on described support portion 2 for the soffit (as shown in Figure 4) supporting described bridge and choose arm.In order to stablize, reliably support choose arm, the angle of inclination of footwear type cushion block 7 can be identical with the angle of inclination of choosing the soffit of arm to be supported.
In sum, the height that arm installation auxiliary support apparatus chosen by the bridge that the utility model provides can regulate as required, has good operability and practicality.And when not in use, minimum constructive height can be transferred to deposit, in this case, when needing to be supported on the diverse location choosing arm, can (such as travelling bogie transports it into assigned address, has stronger mobility by the Simple transportation tool in workshop.In addition, it is simple and reliable for structure, with low cost that the utility model provides your bridge to choose arm installation auxiliary support apparatus, and can provide reliable and stable support.Arm installation auxiliary support apparatus chosen by the bridge that the supporting component that the utility model provides comprises the utility model to be provided, and therefore it has above-mentioned advantage equally.
Below preferred embodiment of the present utility model is described by reference to the accompanying drawings in detail; but; the utility model is not limited to the detail in above-mentioned embodiment; within the scope of technical conceive of the present utility model; can carry out multiple simple variant to the technical solution of the utility model, these simple variant all belong to protection domain of the present utility model.
It should be noted that in addition, each concrete technical characteristic described in above-mentioned detailed description of the invention, in reconcilable situation, can be combined by any suitable mode, in order to avoid unnecessary repetition, the utility model illustrates no longer separately to various possible combination.
In addition, also can be combined between various different embodiment of the present utility model, as long as it is without prejudice to thought of the present utility model, it should be considered as content disclosed in the utility model equally.

Claims (10)

1. arm installation auxiliary support apparatus chosen by a bridge, this auxiliary support apparatus comprises the base (1) for being supported on basis, the support portion (2) of choosing arm for supporting described bridge and the connecting portion be connected between described base (1) and described support portion (2), it is characterized in that, described connecting portion at least comprises interconnective first connecting portion (31) and the second connecting portion (32), described first connecting portion (31) and the second connecting portion (32) have the syndeton cooperatively interacted each other, from described second connecting portion (32) to be made described first connecting portion (31) by described syndeton can relative to each other connect on different positions and fix, thus regulate the length of described connecting portion.
2. arm installation auxiliary support apparatus chosen by bridge according to claim 1, it is characterized in that, described connecting portion comprises described first connecting portion (31) and described second connecting portion (32), described support portion (2) is connected to the end of the upper end of described first connecting portion (31), described base (1) is fixed on the lower end of described second connecting portion (32), described first connecting portion (31) can be fixed on the end of the upper end of described second connecting portion (32) on the different parts of the length direction of described first connecting portion (31) by described syndeton.
3. arm installation auxiliary support apparatus chosen by bridge according to claim 2, it is characterized in that, described first connecting portion (31) and described second connecting portion (32) are all formed as sleeve pipe, and the lower end of described first connecting portion (31) is set in described second connecting portion (32).
4. arm installation auxiliary support apparatus chosen by bridge according to claim 3, it is characterized in that, the cross section of described sleeve pipe is square or circular.
5. arm installation auxiliary support apparatus chosen by bridge according to claim 2, it is characterized in that, described syndeton comprises the first fixed part (41) and the second fixed part (42), described first connecting portion (31) is provided with multiple described first fixed part (41) be spaced along the length direction of described first connecting portion (31), the end of the described upper end of described second connecting portion (32) is provided with multiple described second fixed part (42) for matching with described multiple first fixed part (41) along the length direction of described second connecting portion (32), first fixed part (41) described in any one of described first connecting portion (31) can by dismountable fixture be fixed on described second connecting portion (32) any one described in the second fixed part (42).
6. arm installation auxiliary support apparatus chosen by bridge according to claim 5, it is characterized in that, described fixture is bearing pin (5), and described first fixed part (41) and described second fixed part (42) are all formed as through hole.
7. arm installation auxiliary support apparatus chosen by bridge according to claim 5, it is characterized in that, be spaced apart setpoint distance between adjacent described first fixed part (41), and described first connecting portion (31) be provided with the bearing height mark corresponding respectively to the first fixed part (41) described in each.
8. arm installation auxiliary support apparatus chosen by bridge according to claim 1, it is characterized in that, described support portion (2) are formed as tabular.
9. arm installation auxiliary support apparatus chosen by bridge according to claim 1, it is characterized in that, described base (1) is formed as tabular, and is provided with multiple deep floor (6) between described base (1) and described connecting portion.
10. supporting component, this supporting component comprises bracing or strutting arrangement and correcting wedge (7), it is characterized in that, described bracing or strutting arrangement is for choosing arm installation auxiliary support apparatus according to the bridge in the claims 1-9 described in any one, and described correcting wedge (7) is placed into the soffit described support portion (2) being chosen arm for the described bridge of support.
CN201520432989.3U 2015-06-23 2015-06-23 Arm installation is chosen with supplementary strutting arrangement and supporting component to bridge Active CN204875523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520432989.3U CN204875523U (en) 2015-06-23 2015-06-23 Arm installation is chosen with supplementary strutting arrangement and supporting component to bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520432989.3U CN204875523U (en) 2015-06-23 2015-06-23 Arm installation is chosen with supplementary strutting arrangement and supporting component to bridge

Publications (1)

Publication Number Publication Date
CN204875523U true CN204875523U (en) 2015-12-16

Family

ID=54819915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520432989.3U Active CN204875523U (en) 2015-06-23 2015-06-23 Arm installation is chosen with supplementary strutting arrangement and supporting component to bridge

Country Status (1)

Country Link
CN (1) CN204875523U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507158A (en) * 2016-01-26 2016-04-20 盈都桥梁钢构工程有限公司 Auxiliary steel box beam inlaying blanking plate mounting device and steel box beam inlaying closure plate mounting method
CN108166393A (en) * 2017-12-18 2018-06-15 王燕 A kind of bridge construction support equipment
CN108316157A (en) * 2018-04-23 2018-07-24 黄宇松 A kind of multi-faceted support device of bridge bearing
CN108561690A (en) * 2018-03-20 2018-09-21 中国工程物理研究院总体工程研究所 Using the Product Assembly structure of Wedge-type flexibility secondary support means
CN114790689A (en) * 2022-04-06 2022-07-26 黎明钢构股份有限公司 Overall assembly jig frame for steel structure bridge

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507158A (en) * 2016-01-26 2016-04-20 盈都桥梁钢构工程有限公司 Auxiliary steel box beam inlaying blanking plate mounting device and steel box beam inlaying closure plate mounting method
CN105507158B (en) * 2016-01-26 2017-04-19 盈都桥梁钢构工程有限公司 Auxiliary steel box beam inlaying blanking plate mounting device and steel box beam inlaying closure plate mounting method
CN108166393A (en) * 2017-12-18 2018-06-15 王燕 A kind of bridge construction support equipment
CN108166393B (en) * 2017-12-18 2020-04-24 湖北工业大学 Supporting equipment for bridge engineering construction
CN108561690A (en) * 2018-03-20 2018-09-21 中国工程物理研究院总体工程研究所 Using the Product Assembly structure of Wedge-type flexibility secondary support means
CN108561690B (en) * 2018-03-20 2023-12-15 中国工程物理研究院总体工程研究所 Product assembling structure adopting wedge block type flexible auxiliary supporting device
CN108316157A (en) * 2018-04-23 2018-07-24 黄宇松 A kind of multi-faceted support device of bridge bearing
CN114790689A (en) * 2022-04-06 2022-07-26 黎明钢构股份有限公司 Overall assembly jig frame for steel structure bridge
CN114790689B (en) * 2022-04-06 2024-03-19 黎明钢构股份有限公司 Steel structure bridge overall assembly jig frame

Similar Documents

Publication Publication Date Title
CN204875523U (en) Arm installation is chosen with supplementary strutting arrangement and supporting component to bridge
JP4985540B2 (en) Vertical beam system for mobile work vehicles for cantilever installation
JP2008545074A (en) Rail-guided climbing system
CN102979108B (en) For locating the location stock of crab-bolt group
JP2019112811A (en) Main leg installation method and anchor frame installation jig
CN103243928B (en) Inclined in two-way V-type column construction method
JP2009108611A (en) Reinforcement erecting tool and reinforcement erecting method
KR100929112B1 (en) Assembling apparatus for architectural modular unit
JP6757279B2 (en) Monorail for trolley
JP2015004213A (en) Panel for suspension scaffold and construction method of panel for suspension scaffold and panel unit for suspension scaffold
CN204675785U (en) A kind of adjustable platform
CN102439247A (en) Adjustable mezzanine floor
CN210684486U (en) Cable tower area beam section support
CN211647444U (en) Steel structure assembling supporting jig frame capable of adjusting elevation
JP2019090266A (en) Installation method of main leg material and installation jig of main leg material
JP3192308U (en) Guide device for supporting pile driving
JP6109123B2 (en) Collapse prevention jig
JP6345869B1 (en) Temporary scaffolding materials
JP6857401B2 (en) How to assemble the center support device
CN105696782A (en) Novel mobile operation platform
Antebi et al. Precision continuous high-strength azimuth track for large telescopes
JP7258664B2 (en) Work scaffold and flange installation member
JP6495846B2 (en) Slope anchor construction method and rail unit set used therefor
JP7181069B2 (en) Reversed strut positioning jig
JP7363522B2 (en) beam reinforcement structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Engineering Group Co., Ltd

Address before: Shenzhen City, Guangdong province water building 518040 Futian District Che Kung Temple Tairan eight road 17-19

Patentee before: China Construction Steel Structure Corp. Ltd.