CN204827462U - Water pressure blasting snubber construction auxiliary platform - Google Patents

Water pressure blasting snubber construction auxiliary platform Download PDF

Info

Publication number
CN204827462U
CN204827462U CN201520595013.8U CN201520595013U CN204827462U CN 204827462 U CN204827462 U CN 204827462U CN 201520595013 U CN201520595013 U CN 201520595013U CN 204827462 U CN204827462 U CN 204827462U
Authority
CN
China
Prior art keywords
platform
chassis
channel
section steel
stiffening rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520595013.8U
Other languages
Chinese (zh)
Inventor
周兵
夏子沛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201520595013.8U priority Critical patent/CN204827462U/en
Application granted granted Critical
Publication of CN204827462U publication Critical patent/CN204827462U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Water pressure blasting snubber construction auxiliary platform, this platform divide into two bilateral symmetry, each channel -section steel stiffening rib is parallel to each other and installs on the platform truck crossbeam of former platform truck structure through rotatory hinge, and the welding has platform reinforcing bar net piece on the channel -section steel stiffening rib, half working face is constituteed with platform reinforcing bar net piece to each channel -section steel stiffening rib, the bearing structure top of platform truck is equipped with chain block, and chain block passes through wire rope and is connected with platform reinforcing bar net piece, when needs were under construction, control chain block loosened platform reinforcing bar net piece, when the construction was accomplished, control chain block pull -up platform reinforcing bar net piece to bracing department was fixed. The utility model discloses process simple and convenient, safe in utilization, reliable, can greatly reduced the snubber construction degree of difficulty, guarantee snubber construction quality, the expense is low, saves the engineering time, does not occupy unnecessary tunnel construction space.

Description

Hydraulic pressure demolition snubber construction assistance platform
Technical field
The utility model is tunnel hydraulic pressure demolition snubber construction assistance platform, belongs to tunnel snubber technical field of construction.
Background technology
At present, snubber construction in tunnel adopts the construction of excavation chassis, when ensureing to slag tap vehicle pass-through, in the middle of chassis, cannot operation platform be set, for the larger tunnel of section, middle cut eye construction comparatively difficulty, and snubber angle and branch cannot be ensured evenly, affect hydraulic pressure demolition effect.If separately add a small-sized chassis, increase expense and strengthen, and take constructing tunnel space.
Summary of the invention
In order to overcome a large-span tunnel snubber construction technology difficult problem, the utility model proposes one on original chassis, set up snubber construction assistance platform, this platform reduces large-span tunnel snubber difficulty of construction, and can well ensure snubber construction quality.It is low that this construction assistance platform has cost, and processing is simple, easy-to-use, and does not take the advantages such as constructing tunnel space.
For achieving the above object, the technical solution adopted in the utility model is hydraulic pressure demolition snubber construction assistance platform, this platform is divided into symmetrical two panels, and every sheet platform comprises Chain block 2, platform reinforced mesh 4, platform docking sleeve pipe 6, rotary hinge 7, channel-section steel stiffening rib 8; Chassis crossbeam 1, diagonal brace 3, chassis longeron 5 are former trolley structure, and chassis crossbeam 1, chassis longeron 5 mutually square crossing arrange the braced structures of composition chassis; Diagonal brace 3 is arranged on braced structures side, and diagonal brace 3 is welded between the chassis crossbeam 1 of braced structures, chassis longeron 5; Each channel-section steel stiffening rib 8 is parallel to each other and is arranged on the chassis crossbeam 1 of former trolley structure by rotary hinge 7, channel-section steel stiffening rib 8 is welded with platform reinforced mesh 4; Each channel-section steel stiffening rib 8 forms half work plane with platform reinforced mesh 4; Symmetrical two panels work plane forms the work plane of this construction assistance platform; The platform docking sleeve pipe 6 be welded with respectively bottom the channel-section steel stiffening rib 8 of each half work plane joint on platform docking sleeve pipe 6, two work plane is symmetrical, is located by connecting by half work plane by inserting reinforcing bar in platform docking sleeve pipe 6.
The braced structures top of chassis is provided with Chain block 2, and Chain block 2 is connected with platform reinforced mesh 4 by wire rope; When needs are constructed, control Chain block 2 and unclamp platform reinforced mesh 4; When construction completes, control Chain block 2 pull-up platform reinforced mesh 4 to diagonal brace 3 place and fix.
The beneficial effects of the utility model are, device processing is simple and convenient, use safety, reliable, and can greatly reduce snubber difficulty of construction, ensure snubber construction quality, expense is low, saves the engineering time, does not take unnecessary constructing tunnel space.This structure is applicable to the engineering of large-span tunnel snubber construction, facilitates Long span tunnel snubber to construct, and improves the Angle ambiguity in snubber work progress, ensures that snubber is arranged evenly simultaneously, improves hydraulic pressure demolition whole structure.
Accompanying drawing explanation
Fig. 1 is the elevation of the utility model device using state.
Fig. 2 is the elevation of the utility model device unused state.
Fig. 3 is the use lateral view of the utility model device.
Fig. 4 is the use top view of the utility model device.
Fig. 5 is the dimensional drawing of the utility model device critical piece.
In figure: 1, chassis crossbeam, 2, Chain block, 3, diagonal brace, 4, platform reinforced mesh, 5, chassis longeron, 6, platform docking sleeve pipe, 7, rotary hinge, 8, channel-section steel stiffening rib.
Detailed description of the invention
As Figure 1-5, hydraulic pressure demolition snubber construction assistance platform, it utilizes existing excavation chassis, and chassis increases operation platform; Docked with chassis longeron 5 by rotary hinge 7, platform divides left and right two panels, is completed the folding and unfolding operation of platform by Chain block 2.Assistance platform size is according to the processing of excavation chassis real size.During snubber construction, platform is put down and knows level, constructor stands on this platform and completes snubber construction operation, after having constructed, utilize Chain block to be packed up by platform, and be fixed on the diagonal brace of chassis, do not affect drag-out slag car and run, platform puts down when using by snubber again, so recycles.Land lengths is determined according to the horizontal clear distance of chassis, guarantees left and right two platform docking.
Concrete operations flow process is as follows,
S1 on request size prepares three channel-section steel longerons, and specification is No. 12 channel-section steels.
S2 adopts rotary hinge to be docked with chassis longeron by channel-section steel longeron, and rotary hinge is fixed on chassis longeron, arranges according to shown in figure bis-.
S3 adopts diameter 10mm screw-thread steel platform for making, and screwed pipe transverse and longitudinal spacing is 10cm together, specifically as shown in Figure 3.
S4 utilizes the Chain block be fixed on chassis head piece that platform is placed level, and is docked by platform, sees shown in Fig. 1 and Fig. 2.
S5 constructor stands on platform and carries out snubber construction.
After S6 snubber has been constructed, Chain block is utilized to be packed up by platform, as shown in Figure 1.
S7 repeats S4-S6, recycles platform.

Claims (1)

1. hydraulic pressure demolition snubber construction assistance platform, it is characterized in that: this platform is divided into symmetrical two panels, every sheet platform comprises Chain block (2), platform reinforced mesh (4), platform docking sleeve pipe (6), rotary hinge (7), channel-section steel stiffening rib (8); Chassis crossbeam (1), diagonal brace (3), chassis longeron (5) are former trolley structure, and chassis crossbeam (1), chassis longeron (5) mutually square crossing arrange the braced structures of composition chassis; Diagonal brace (3) is arranged on braced structures side, and diagonal brace (3) is welded between the chassis crossbeam (1) of braced structures, chassis longeron (5); Each channel-section steel stiffening rib (8) is parallel to each other and is arranged on the chassis crossbeam (1) of former trolley structure by rotary hinge (7), channel-section steel stiffening rib (8) is welded with platform reinforced mesh (4); Each channel-section steel stiffening rib (8) and platform reinforced mesh (4) form half work plane; Symmetrical two panels work plane forms the work plane of this construction assistance platform; Channel-section steel stiffening rib (8) bottom of each half work plane joint is welded with platform docking sleeve pipe (6) respectively, platform docking sleeve pipe (6) on two work planes is symmetrical, is located by connecting by half work plane by inserting reinforcing bar in platform docking sleeve pipe (6);
The braced structures top of chassis is provided with Chain block (2), and Chain block (2) is connected with platform reinforced mesh (4) by wire rope.
CN201520595013.8U 2015-08-03 2015-08-03 Water pressure blasting snubber construction auxiliary platform Expired - Fee Related CN204827462U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520595013.8U CN204827462U (en) 2015-08-03 2015-08-03 Water pressure blasting snubber construction auxiliary platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520595013.8U CN204827462U (en) 2015-08-03 2015-08-03 Water pressure blasting snubber construction auxiliary platform

Publications (1)

Publication Number Publication Date
CN204827462U true CN204827462U (en) 2015-12-02

Family

ID=54685073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520595013.8U Expired - Fee Related CN204827462U (en) 2015-08-03 2015-08-03 Water pressure blasting snubber construction auxiliary platform

Country Status (1)

Country Link
CN (1) CN204827462U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108482519A (en) * 2018-06-04 2018-09-04 中国水利水电第五工程局有限公司 A kind of reinforced mesh transport trolley
CN111238328A (en) * 2020-03-02 2020-06-05 中铁十八局集团有限公司 Compound peripheral eye and tunnel efficient vibration reduction and smooth surface smooth bottom blasting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108482519A (en) * 2018-06-04 2018-09-04 中国水利水电第五工程局有限公司 A kind of reinforced mesh transport trolley
CN111238328A (en) * 2020-03-02 2020-06-05 中铁十八局集团有限公司 Compound peripheral eye and tunnel efficient vibration reduction and smooth surface smooth bottom blasting method
CN111238328B (en) * 2020-03-02 2022-08-02 中铁十八局集团有限公司 Compound peripheral eye and tunnel efficient vibration reduction and smooth surface smooth bottom blasting method

Similar Documents

Publication Publication Date Title
CN104265302B (en) Jacking pipe joints stopping device
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN105350454A (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN203679102U (en) Full-automatic hydraulic mesh bending device
CN204827462U (en) Water pressure blasting snubber construction auxiliary platform
CN104533450A (en) One-time-concreting construction method of inverted arch low wall of single-track tunnel
CN205778918U (en) Loess tunnel excavation and just formwork build concrete construction combined type chassis
CN102587918A (en) High-strength reducing template for construction of coal mine freezing vertical shaft
CN204163400U (en) Subway station variable cross section tie template
CN105421341A (en) Large-diameter pile foundation reinforcement cage manufacturing method
CN104947804B (en) A kind of steel bracket and the construction method that beam-column node structure is built using it
CN204552774U (en) A kind of monolithic inverted arch mould bases of locating longitudinal waterstop
CN108506006A (en) The exchange operational method and its device of tunnel excavation trolley and anchor pole Operation Van
CN203795824U (en) Suspension type fastener scaffold erecting device
CN205778915U (en) A kind of soft bridging arrangement of concrete lining trolley
CN204504600U (en) For assistance platform and the bracing or strutting arrangement thereof of the welding of jack up drilling platform spud leg
CN209539376U (en) A kind of positioning device for tunnel-liner steel side sealing belt construction
CN202707076U (en) Double-line railway tunnel trolley
CN208778009U (en) A kind of automation railway single lining trolley device
CN202181728U (en) Foundation reinforcing bar non-connector construction structure for shear wall and attached-wall column
CN207003265U (en) New road bridge formwork support meanss
CN204454347U (en) Tower crane Overbridge device
CN205822799U (en) A kind of electric power raceway groove transformation grouting chute frame
CN205400755U (en) Disconnect -type platform truck
CN204826587U (en) Elevartor shaft instrument formula operation steel platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20210803

CF01 Termination of patent right due to non-payment of annual fee