CN204827225U - Tunnel tunnelling equipment - Google Patents
Tunnel tunnelling equipment Download PDFInfo
- Publication number
- CN204827225U CN204827225U CN201520497551.3U CN201520497551U CN204827225U CN 204827225 U CN204827225 U CN 204827225U CN 201520497551 U CN201520497551 U CN 201520497551U CN 204827225 U CN204827225 U CN 204827225U
- Authority
- CN
- China
- Prior art keywords
- platform
- oil cylinder
- expansion link
- fixedly installed
- oscillating oil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model provides a tunnel tunnelling equipment, includes platform truck, control center, firm platform, moving platform, telescopic link, swing hydro -cylinder, rock drill, supporting beam, support tripod and carries quick -witted crossbeam. The utility model discloses an equipment has improved the drilling precision, although platform truck itself is relatively heavier, the economization time, realize rock drilling machinery ization, improved work efficiency, reduced labour cost, eliminated the personal safety problem, complete equipment easy operation is convenient, the practicality is strong.
Description
Technical field
The utility model belongs to constructing tunnel field, is specifically related to a kind of tunneling equipment.
Background technology
In ore extraction process, rock drilling is primary job step.As shown in Figure 3, in the prior art, first building platform, workman's nager stands on working platform and carries out rock drilling driving, many people are needed to work together, hammer drill weighs more than 50 kilograms, expends workman physical in a large number, and due to human factor boring inequality, cost is caused to waste, miner's long working, can cause danger in possible use procedure, and drivage efficiency is not high yet.
Utility model content
For solving above technology Problems existing, the utility model provides the development machine chassis that a kind of automaticity is high, drivage efficiency is high, safe and practical.
Its technical scheme is:
A kind of tunneling equipment, it is characterized in that, comprise chassis, control centre, stable platform, mobile platform, expansion link, oscillating oil cylinder, hammer drill, supporting traverse, support tripod and carrier aircraft crossbeam, described chassis is provided with stable platform, stable platform is provided with control centre, stable platform comprises vertical pillars, vertical pillars is provided with mobile platform, articulated expansion link one end, mobile platform both sides, expansion link is fixedly installed multiple hammer drill, expansion link is near one end of the articulated oscillating oil cylinder in the position of mobile platform, the oscillating oil cylinder other end is fixedly installed on a mobile platform, supporting traverse is provided with between vertical pillars, hinged with support triangle frame summit in the middle part of supporting traverse, one end of an articulated oscillating oil cylinder in limit of support triangle frame, the oscillating oil cylinder other end is fixedly installed in stable platform, support triangle frame is fixedly installed two expansion links, expansion link top is fixedly installed carrier aircraft crossbeam, carrier aircraft crossbeam is provided with multiple hammer drill.
After construction has been got rid of the danger, staff drives chassis and falls back and enter job site, direction is retracted into according to infrared rays adjustment chassis, expansion link is launched when moving to construction part, constructor enters control centre's adjustment hammer drill angle, start hammer drill work, mobile platform moves up and down and flexiblely with oscillating oil cylinder makes hammer drill increase rock drilling work plane, and improve boring precision, such design, although chassis itself is heavier, but economization time, realize rock drilling machinery, improve operating efficiency, decrease labour cost, eliminate human safety issues, complete equipment is simple to operation, practical.
Accompanying drawing explanation
Fig. 1 is tunneling equipment working state schematic representation;
Fig. 2 is tunneling equipment off working state schematic diagram;
Fig. 3 is for manually holding hammer drill driving schematic diagram;
Wherein, 1-chassis, 2-control centre, 3-stable platform, 4-mobile platform, 5-expansion link, 6-oscillating oil cylinder, 7-hammer drill, 8-supporting traverse, 9-support tripod, 10-carrier aircraft crossbeam.
Detailed description of the invention
As shown in Figure 1, a kind of tunneling equipment, comprise chassis 1, control centre 2, stable platform 3, mobile platform 4, expansion link 5, oscillating oil cylinder 6, hammer drill 7, supporting traverse 8, support tripod 9 and carrier aircraft crossbeam 10, described chassis 1 is provided with stable platform 3, stable platform 3 is provided with control centre 2, stable platform 3 comprises vertical pillars, vertical pillars is provided with mobile platform 4, articulated expansion link 5 one end, mobile platform 4 both sides, expansion link 5 is fixedly installed multiple hammer drill 7, one end of expansion link 5 articulated oscillating oil cylinder 6 near the position of mobile platform 4, oscillating oil cylinder 6 other end is fixedly installed on mobile platform 4, supporting traverse 8 is provided with between vertical pillars, hinged with support triangle frame 9 summit in the middle part of supporting traverse 8, one end of the articulated oscillating oil cylinder 6 in a limit of support triangle frame 9, oscillating oil cylinder 6 other end is fixedly installed in stable platform 3, support triangle frame 9 is fixedly installed two expansion links 5, expansion link 5 top is fixedly installed carrier aircraft crossbeam 10, carrier aircraft crossbeam 10 is provided with multiple hammer drill 7.
Claims (1)
1. a tunneling equipment, it is characterized in that, comprise chassis (1), control centre (2), stable platform (3), mobile platform (4), expansion link (5), oscillating oil cylinder (6), hammer drill (7), supporting traverse (8), support tripod (9) and carrier aircraft crossbeam (10), described chassis (1) is provided with stable platform (3), stable platform (3) is provided with control centre (2), stable platform (3) comprises vertical pillars, vertical pillars is provided with mobile platform (4), articulated expansion link (5) one end, mobile platform (4) both sides, expansion link (5) is fixedly installed multiple hammer drill (7), expansion link (5) is near one end of the articulated oscillating oil cylinder in the position (6) of mobile platform (4), oscillating oil cylinder (6) other end is fixedly installed on mobile platform (4), supporting traverse (8) is provided with between vertical pillars, supporting traverse (8) middle part is hinged with a summit of support triangle frame (9), one end of the articulated oscillating oil cylinder in a limit (6) of support triangle frame (9), oscillating oil cylinder (6) other end is fixedly installed in stable platform (3), support triangle frame (9) is fixedly installed two expansion links (5), expansion link (5) top is fixedly installed carrier aircraft crossbeam (10), carrier aircraft crossbeam (10) is provided with multiple hammer drill (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520497551.3U CN204827225U (en) | 2015-07-12 | 2015-07-12 | Tunnel tunnelling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520497551.3U CN204827225U (en) | 2015-07-12 | 2015-07-12 | Tunnel tunnelling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204827225U true CN204827225U (en) | 2015-12-02 |
Family
ID=54684836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520497551.3U Expired - Fee Related CN204827225U (en) | 2015-07-12 | 2015-07-12 | Tunnel tunnelling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204827225U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106089224A (en) * | 2016-07-29 | 2016-11-09 | 重庆格德瑞重工智能装备研究院 | The all-hydraulic rock drilling system of modularity |
CN109519189A (en) * | 2018-12-31 | 2019-03-26 | 中车建设工程有限公司 | A kind of tunnel piercing device |
CN109854265A (en) * | 2019-02-26 | 2019-06-07 | 重庆交通建设(集团)有限责任公司 | Three arm rock drilling jumbos stablize construction method and stablize rack |
-
2015
- 2015-07-12 CN CN201520497551.3U patent/CN204827225U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106089224A (en) * | 2016-07-29 | 2016-11-09 | 重庆格德瑞重工智能装备研究院 | The all-hydraulic rock drilling system of modularity |
CN109519189A (en) * | 2018-12-31 | 2019-03-26 | 中车建设工程有限公司 | A kind of tunnel piercing device |
CN109519189B (en) * | 2018-12-31 | 2024-04-16 | 中车智能交通工程技术有限公司 | Tunnel boring device |
CN109854265A (en) * | 2019-02-26 | 2019-06-07 | 重庆交通建设(集团)有限责任公司 | Three arm rock drilling jumbos stablize construction method and stablize rack |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106837334B (en) | A kind of anchor combined machine set system of full-mechanized roadway multi rack automatic moving type branch | |
CN106837392A (en) | Tunnel gantry type multifunctional supporting chassis | |
CN204827225U (en) | Tunnel tunnelling equipment | |
CN103032091A (en) | Self-moving hydraulic support | |
CN203547736U (en) | Novel continuous coal mining machine | |
CN104863599A (en) | Fully-mechanized mining face synchronous slope expansion and installation method and supporting system | |
CN110219681B (en) | Movable temporary supporting device and construction method thereof | |
CN103114808B (en) | Arch centering pipe shed drilling machine | |
CN202510143U (en) | Onboard timbering machine for heading machine | |
CN204691807U (en) | Fully-mechanized mining working synchronously expands side and installs support system | |
CN104018868A (en) | Integrated gate type fore support | |
CN203756209U (en) | Longitudinal-girder staggered temporary support for heading face | |
CN206448809U (en) | Pick, branch, anchor, drill integrated fully-mechanized digging machine | |
CN203879513U (en) | Heading machine and temporary heading machine support device | |
CN110439600A (en) | A kind of gib equipment and its application based on monorail crane | |
CN203441363U (en) | Self-moving device for full-hydraulic drilling machine | |
CN104727838A (en) | Hydraulic support of coal mining machine | |
CN103552947B (en) | A kind of Foldable hydraulic support upending frame | |
CN208907347U (en) | Tunnel drill carriage | |
CN203855324U (en) | Lifting device for installing and removing underground coal mine working face | |
CN204327141U (en) | Tunnel end hydraulic support pushes away rammer device | |
CN108119173B (en) | Self-moving type telescopic front canopy and supporting method thereof | |
CN203717003U (en) | Novel gob-side entry hydraulic support | |
CN204344147U (en) | A kind of hydraulic shield support | |
CN102587946A (en) | Integrally-moving protective forepoling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151202 Termination date: 20170712 |