CN204826007U - 一种桩基托换结构 - Google Patents
一种桩基托换结构 Download PDFInfo
- Publication number
- CN204826007U CN204826007U CN201520578971.4U CN201520578971U CN204826007U CN 204826007 U CN204826007 U CN 204826007U CN 201520578971 U CN201520578971 U CN 201520578971U CN 204826007 U CN204826007 U CN 204826007U
- Authority
- CN
- China
- Prior art keywords
- pile foundation
- roof beam
- transform beams
- underpin
- cable wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Foundations (AREA)
Abstract
本实用新型公开了一种桩基托换结构,包括托换桩(2)和托换梁(3),托换梁(3)的两端分别放置在托换桩(2)上,并与原有桩基(1)注筑在一起,位于托换梁(3)下方的原有桩基(1)被部分截断,并在截断后的原有桩基(1)下端设置索孔,钢索(4)穿过索孔后张拉于托换梁(3)的两端,从而使托换梁(3)、钢索(4)及位于托换梁(3)下方的部分原有桩基(1)共同构成张弦梁结构。通过增设钢索,并保留托换梁下方的部分原有桩基用于打设索孔,同时与托换梁形成张弦梁结构,达到了减小托换梁弯矩的目的,在具体施工时,可减小托换梁的横截面尺寸,相应地减小土方开挖量,减小施工对周围环境的影响,加快施工进度。
Description
技术领域
本实用新型属于隧道施工技术领域,具体涉及一种桩基托换结构。
背景技术
隧道在下穿桥梁、房屋等建构筑物时,往往遇到这些建构筑物的桩基侵入隧道或位于隧道正上方,需要对建构筑物进行拆除或对其桩基进行托换处理。现目前采用的桩基托换结构,是在原有桩基附近建设托换桩和托换梁,托换梁的两端分别放置在各自对应的托换桩上,并与原有桩基注筑在一起,将原有桩基上的荷载通过托换梁转移到托换桩上,最后截除托换梁下方的原有桩基。
当隧道的横截面较大时,两根托换桩之间的间距也较大,托换梁所受的弯矩也随之增大,势必增加托换梁的截面尺寸,以保证托换梁承受足够的弯矩;若托换梁在地下布置时,需要较大的土方开挖量,施工量大,施工时间长,对周围影响较大。
实用新型内容
为克服现有技术的不足,本实用新型的目的在于提供一种桩基托换结构,可减小托换梁的弯矩及其截面尺寸,减小土方开挖量,减少对周围环境的影响。
为此,本实用新型所采用的技术方案为:一种桩基托换结构,包括两根托换桩和一根托换梁,两根所述托换桩对称布置在原有桩基的两侧,托换梁的两端分别放置在各自对应的托换桩上,并与原有桩基注筑在一起,位于所述托换梁下方的原有桩基被部分截断,并在截断后的原有桩基下端设置索孔,钢索穿过索孔后张拉于托换梁的两端,从而使托换梁、钢索及位于托换梁下方的部分原有桩基共同构成张弦梁结构。
作为上述方案的优选,所述托换梁的下方还设置有支撑杆,支撑杆对称布置在原有桩基的两侧,并与原有桩基平行,支撑杆的上端固定在托换梁上,支撑杆的下端与钢索相连;可进一步减小托换梁的内力,减小托换梁的横截面尺寸。
本实用新型的有益效果:通过增设钢索,并利用托换梁下方的部分原有桩基作为支撑,与托换梁形成张弦梁结构,从而达到了减小托换梁弯矩的目的,在具体施工时,可减小托换梁的横截面尺寸,相应地减小土方开挖量,减小施工对周围环境的影响,加快施工进度。
附图说明
图1为本实用新型第一较佳实施例的轴侧图。
图2为图1的正视图。
图3为本实用新型的第二较佳实施例的轴侧图。
具体实施方式
下面通过实施例并结合附图,对本实用新型作进一步说明:
结合图1~图2所示,一种桩基托换结构,主要由托换桩2、托换梁3、钢索4和部分原有桩基1组成。
两根托换桩2对称布置在原有桩基1的两侧,托换梁3的两端分别放置在各自对应的托换桩2上,两根托换桩2用于支撑托换梁3,托换梁3与原有桩基1注筑在一起,以上所述与现有结构相同,在此不再赘述。
区别在于:位于托换梁3下方的原有桩基1被部分截断,即原有桩基1位于托换梁3下方的部分不被全部截断,仍保留一部分,一则是为了打设索孔,再则是为了作为张弦梁结构的组成部分。在截断后的原有桩基1下端设置索孔,钢索4穿过索孔后张拉于托换梁3的两端,从而使托换梁3、钢索4及位于托换梁3下方的部分原有桩基1共同构成张弦梁结构。
最好是,如图3所示,在托换梁3的下方还设置有支撑杆5,支撑杆5对称布置在原有桩基1的两侧,并与原有桩基1平行,支撑杆5的上端固定在托换梁3上,支撑杆5的下端与钢索4相连。
具体施工按以下步骤进行:
第一步,打设托换桩2,可以采用钻孔灌注桩或人工挖孔桩等;
第二步,开挖托换梁3所在位置的土方,开挖原有桩基1周边土方至索孔下方一定距离;
第三步,在原有桩基1上钻设索孔,将钢索4穿过索孔;
第四步,在原有桩基1上植筋,绑扎托换梁3的钢筋,在索孔内布置供钢索4穿过的波绞管;
第五步,浇筑托换梁3的混凝土,养护到足够强度;
第六步,张拉钢索4,并将钢索4锚固于托换梁3的梁端;
第七步,用微膨胀混凝土填充索孔的空隙;
第八步,截断索孔下方的原有桩基1;
第九步,回填土方。
根据实际情况,对桩基采用主动托换或被动托换。
Claims (2)
1.一种桩基托换结构,包括两根托换桩(2)和一根托换梁(3),两根所述托换桩(2)对称布置在原有桩基(1)的两侧,托换梁(3)的两端分别放置在各自对应的托换桩(2)上,并与原有桩基(1)注筑在一起,其特征在于:位于所述托换梁(3)下方的原有桩基(1)被部分截断,并在截断后的原有桩基(1)下端设置索孔,钢索(4)穿过索孔后张拉于托换梁(3)的两端,从而使托换梁(3)、钢索(4)及位于托换梁(3)下方的部分原有桩基(1)共同构成张弦梁结构。
2.根据权利要求1所述的桩基托换结构,其特征在于:所述托换梁(3)的下方还设置有支撑杆(5),支撑杆(5)对称布置在原有桩基(1)的两侧,并与原有桩基(1)平行,支撑杆(5)的上端固定在托换梁(3)上,支撑杆(5)的下端与钢索(4)相连。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520578971.4U CN204826007U (zh) | 2015-08-04 | 2015-08-04 | 一种桩基托换结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520578971.4U CN204826007U (zh) | 2015-08-04 | 2015-08-04 | 一种桩基托换结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204826007U true CN204826007U (zh) | 2015-12-02 |
Family
ID=54683623
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520578971.4U Active CN204826007U (zh) | 2015-08-04 | 2015-08-04 | 一种桩基托换结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204826007U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672347A (zh) * | 2016-01-25 | 2016-06-15 | 济南轨道交通集团有限公司 | 盾构穿越既有桩基的预制桩-板托换结构及施工方法 |
-
2015
- 2015-08-04 CN CN201520578971.4U patent/CN204826007U/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672347A (zh) * | 2016-01-25 | 2016-06-15 | 济南轨道交通集团有限公司 | 盾构穿越既有桩基的预制桩-板托换结构及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102839675B (zh) | 一种基坑支护用大跨度预应力鱼腹梁的安装方法 | |
CN203639942U (zh) | 拱形挡土墙 | |
CN101225661A (zh) | 桩加锚基坑支护工法 | |
CN104047613A (zh) | 煤矿巷道底板用锚固方法 | |
CN105155548B (zh) | 一种拉索式双排桩(墙)支护结构 | |
CN104878835A (zh) | 条形基础房屋后增地下室结构 | |
CN104294769B (zh) | 一种补桩与增大台帽组合加固已建桥台结构的施工方法 | |
CN103352582B (zh) | 内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法 | |
CN208235555U (zh) | 预制装配式沉井 | |
CN202627000U (zh) | 一种拉锚式双排桩基坑支护结构 | |
CN109024562A (zh) | 一种分级推进的大直径长预制管桩及其施工方法 | |
CN109898521A (zh) | 一种用于基坑阳角的桩锚支护结构及施工方法 | |
CN104532856A (zh) | 一种用于基坑支护的装配式格构单元及安装方法 | |
CN216515697U (zh) | 一种钻岩锚索与承台组合的抗震式基础 | |
CN105649091A (zh) | 一种高边坡支护方法及结构 | |
CN204826007U (zh) | 一种桩基托换结构 | |
CN204097889U (zh) | 一种补桩与增大台帽组合加固已建桥台结构 | |
CN212129160U (zh) | 一种桩顶斜拉基坑支护结构 | |
CN104632246B (zh) | 一种大跨度地下结构 | |
CN104532852A (zh) | 对拉式预应力管桩基坑支护结构及其安装方法 | |
CN114892674A (zh) | 一种临近既有建筑基坑支护结构及其施工方法 | |
CN105133664B (zh) | 一种组合框架式隔离保护体系及其施工方法 | |
CN211900659U (zh) | 浅埋大跨度地下洞室开挖支护布置结构 | |
CN212404803U (zh) | 隧道仰拱结合型索道桥桥台 | |
CN204435389U (zh) | 一种用于基坑支护的装配式格构单元 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100078 Beijing city Fengtai District park is a district 15 building five floor 501, 503 Patentee after: ZHONGCHE CONSTRUCTION ENGINEERING CO., LTD. Address before: 100078 Beijing city Fengtai District park is a district 15 building five floor 501, 503 Patentee before: CNR Construction Engineering Co., Ltd. |