- Publication number
- CN104532852A CN104532852A CN201410809091.3A CN201410809091A CN104532852A CN 104532852 A CN104532852 A CN 104532852A CN 201410809091 A CN201410809091 A CN 201410809091A CN 104532852 A CN104532852 A CN 104532852A
- Authority
- CN
- China
- Prior art keywords
- pipe pile
- pile
- supporting
- foundation pit
- anchor cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种对拉式预应力管桩基坑支护结构及其安装方法,属于基坑加固结构,在基坑支护结构凸形转角两侧部位支护管桩桩顶和/或桩身设置若干对拉锚索。安装方法在于:支护管桩及桩顶冠梁施工完毕,桩顶埋设预埋钢管和桩顶冠梁混凝土达到设计强度的75%以后,通过开挖成槽或机械钻孔安装支护管桩桩顶对拉锚索并进行预紧张拉锁定;随后,基坑土方开挖至支护管桩桩间锚索设置部位安装或浇筑腰梁,机械成孔后穿置锚索,在锚索两侧锚头部位进行对拉,施加预紧应力并锁定,从而构成锚索两端对拉平衡受理的管桩支护结构。本发明减少管桩支点间跨度和弥补预应力管桩抗弯剪性能不足,扩大预应力管桩不适用8度抗震设防地区的适用性。
Description
技术领域
本发明属于基坑加固结构,尤其涉及基坑支护结构阳角转角处。
背景技术
预应力混凝土管桩可分为后张法预应力管桩和先张法预应力管桩。先张法预应力管桩是采用先张法预应力工艺和离心成型法制成的一种空心筒体细长混凝土预制构件,主要由圆筒形桩身、端头板和钢套箍等组成。
现有的预应力管桩存在抗弯剪性能不足等问题,同时预应力管桩较多仅用于地基基础领域,并能充分发挥其施工速度快捷的优势。
发明内容
本发明的目的在于:提出一种对拉式预应力管桩基坑支护结构及其安装方法,减少支护管桩支点间间距和弥补预应力管桩用于基坑支护中其抗弯剪性能有限的不足,扩大预应力管桩适用性和使用范围,同时,适用于不同土层,减低基坑支护结构造价,缩短同类基坑的施工工期,工艺简单,方便快捷,加固支护效果显著。
本发明目的通过下述技术方案来实现:
一种对拉式预应力管桩基坑支护结构,在基坑支护结构凸形转角两侧部位支护管桩桩顶和/或桩身设置若干对拉锚索,包括在凸形基坑侧壁布设的支护管桩桩顶冠梁上设置预埋钢管和锚头以及管桩桩身中部设置腰梁及锚头,所述对拉锚索穿过所述预埋钢管或腰梁连接凸形转角两侧的对应锚头。
作为选择,所述对拉锚索间平行设置。
上述方案中,桩顶对拉锚索和桩间对拉锚索可根据工程需要同时设置或分别设置。
前述对拉式预应力管桩基坑支护结构的安装方法:支护管桩及桩顶冠梁施工完毕,桩顶埋设预埋钢管和桩顶冠梁混凝土达到设计强度的75%以后,通过开挖成槽或机械钻孔安装支护管桩桩顶对拉锚索并进行预紧张拉锁定;随后,基坑土方开挖至支护管桩桩间锚索设置部位安装或浇筑腰梁,机械成孔后穿置锚索,在锚索两侧锚头部位进行对拉,施加预紧应力并锁定,从而构成锚索两端对拉平衡受理的管桩支护结构。
本发明的有益效果:
1)充分利用和发挥预应力管桩的成桩速度和挤密加固基坑侧壁土体;
2)锚索与腰梁构成的对拉结构利用对拉两侧壁土体压力实现自平衡;
3)对拉结构减少管桩支点间间距和弥补预应力管桩抗弯剪性能有限的不足;
4)扩大预应力管桩适用性和使用范围;
5)缩短同类基坑的施工工期,工艺简单;
6)适应不同土层,减低基坑支护结构造价。
附图说明
图1是本发明实施例的平面结构示意图;
图2是本发明实施例的剖面结构示意图;
其中(1)支护管桩、(2)桩顶冠梁、(3)对拉锚索、(4)锚头、(5)预埋钢管、(6)截水沟、(7)地下室外墙线边线。
具体实施方式
下列非限制性实施例用于说明本发明。
参考图1、2所示,一种对拉式预应力管桩基坑支护结构,在基坑支护结构凸形部位侧桩顶设置若干对拉锚索3,包括在凸形部位两侧的支护管桩1间设有预埋钢管5,桩顶冠梁2设有锚头4,对拉锚索3穿过预埋钢管5连接凸形部位两侧的对应锚头4,各对拉锚索3间平行设置。锚索与冠梁构成的对拉结构利用对拉两侧壁土体压力实现自身的平衡,同时对拉结构也减少管桩支点间间距且弥补了预应力管桩抗弯剪性能有限的不足,从而调整支护结构的受力及减少变形。
另外,还可以单独或进一步在基坑支护结构凸形转角两侧部位支护管桩桩身设置若干对拉锚索,包括在管桩桩身中部设置腰梁及锚头,所述对拉锚索穿过所述腰梁连接阳角两侧的对应锚头。
对拉式预应力管桩基坑支护结构的安装方法:支护管桩1及桩顶冠梁2施工完毕,桩顶埋设预埋钢管5冠梁2混凝土达到设计强度的75%以后,通过开挖成槽或机械钻孔安装顶层对拉锚索并进行预紧张拉锁定;随后,基坑土方开挖至桩桩间锚索3设置部位安装或浇筑腰梁,机械成孔后穿置锚索3,在锚索3两侧锚头4部位进行对拉,施加预紧应力并锁定,从而构成锚索两端对拉平衡受理的管桩支护结构。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (3)
1.一种对拉式预应力管桩基坑支护结构,其特征在于:在基坑支护结构凸形转角两侧部位支护管桩桩顶和/或桩身设置若干对拉锚索,包括在凸形基坑侧壁布设的支护管桩桩顶冠梁上设置预埋钢管和锚头以及管桩桩身中部设置腰梁及锚头,所述对拉锚索穿过所述预埋钢管或腰梁连接凸形转角两侧的对应锚头。
2.如权利要求1所述的对拉式预应力管桩基坑支护结构,其特征在于:所述对拉锚索间平行设置。
3.权利要求1或2所述的对拉式预应力管桩基坑支护结构的安装方法,其特征在于:支护管桩及桩顶冠梁施工完毕,桩顶埋设预埋钢管和桩顶冠梁混凝土达到设计强度的75%以后,通过开挖成槽或机械钻孔安装支护管桩桩顶对拉锚索并进行预紧张拉锁定;随后,基坑土方开挖至支护管桩桩间锚索设置部位安装或浇筑腰梁,机械成孔后穿置锚索,在锚索两侧锚头部位进行对拉,施加预紧应力并锁定,从而构成锚索两端对拉平衡受理的管桩支护结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410809091.3A CN104532852A (zh) | 2014-12-23 | 2014-12-23 | 对拉式预应力管桩基坑支护结构及其安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410809091.3A CN104532852A (zh) | 2014-12-23 | 2014-12-23 | 对拉式预应力管桩基坑支护结构及其安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104532852A true CN104532852A (zh) | 2015-04-22 |
Family
ID=52848460
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410809091.3A Pending CN104532852A (zh) | 2014-12-23 | 2014-12-23 | 对拉式预应力管桩基坑支护结构及其安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104532852A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130610A (zh) * | 2017-05-24 | 2017-09-05 | 广州市第建筑工程有限公司 | 一种深基坑支护的施工方法 |
CN108360534A (zh) * | 2018-05-04 | 2018-08-03 | 广西建工集团基础建设有限公司 | 一种抗变形的基坑支护结构及其施工方法 |
CN108951618A (zh) * | 2018-07-09 | 2018-12-07 | 广东工业大学 | 一种桩锚支护装置及其施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201722704U (zh) * | 2010-03-30 | 2011-01-26 | 山东大学 | 一种预应力悬臂对拉式置筋挡墙 |
CN102493462A (zh) * | 2011-12-09 | 2012-06-13 | 中国建筑西南勘察设计研究院有限公司 | 对拉式灌注桩基坑支护结构 |
CN102535478A (zh) * | 2011-12-30 | 2012-07-04 | 北京工业大学 | 一种基坑支护用的方钢管轻质混凝土围檩 |
CN203222802U (zh) * | 2013-03-29 | 2013-10-02 | 辽宁工程技术大学 | 一种台阶型基坑边坡支护结构 |
CN103806452A (zh) * | 2012-11-15 | 2014-05-21 | 深圳市工勘岩土工程有限公司 | 紧贴地下结构外墙的高边坡支护结构 |
CN204401627U (zh) * | 2014-12-23 | 2015-06-17 | 中国建筑西南勘察设计研究院有限公司 | 对拉式预应力管桩基坑支护结构 |
-
2014
- 2014-12-23 CN CN201410809091.3A patent/CN104532852A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201722704U (zh) * | 2010-03-30 | 2011-01-26 | 山东大学 | 一种预应力悬臂对拉式置筋挡墙 |
CN102493462A (zh) * | 2011-12-09 | 2012-06-13 | 中国建筑西南勘察设计研究院有限公司 | 对拉式灌注桩基坑支护结构 |
CN102535478A (zh) * | 2011-12-30 | 2012-07-04 | 北京工业大学 | 一种基坑支护用的方钢管轻质混凝土围檩 |
CN103806452A (zh) * | 2012-11-15 | 2014-05-21 | 深圳市工勘岩土工程有限公司 | 紧贴地下结构外墙的高边坡支护结构 |
CN203222802U (zh) * | 2013-03-29 | 2013-10-02 | 辽宁工程技术大学 | 一种台阶型基坑边坡支护结构 |
CN204401627U (zh) * | 2014-12-23 | 2015-06-17 | 中国建筑西南勘察设计研究院有限公司 | 对拉式预应力管桩基坑支护结构 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130610A (zh) * | 2017-05-24 | 2017-09-05 | 广州市第建筑工程有限公司 | 一种深基坑支护的施工方法 |
CN108360534A (zh) * | 2018-05-04 | 2018-08-03 | 广西建工集团基础建设有限公司 | 一种抗变形的基坑支护结构及其施工方法 |
CN108951618A (zh) * | 2018-07-09 | 2018-12-07 | 广东工业大学 | 一种桩锚支护装置及其施工方法 |
CN108951618B (zh) * | 2018-07-09 | 2020-12-08 | 广东工业大学 | 一种桩锚支护装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105840207B (zh) | 一种穿越浅埋偏压松散堆积体大跨度隧道综合进洞结构施工方法 | |
US10358920B2 (en) | Tunnel construction method using pre-support and post-support and apparatus suitable for same | |
CN105735325B (zh) | 一种集约化的永久支护装配式地下室结构体系及施工方法 | |
US10851512B2 (en) | Foundation pile, a grouting method for the said pile and a manufacturing method therefor | |
CN108951611B (zh) | 渠式切割装配式地下连续墙及施工方法 | |
CN104878835A (zh) | 条形基础房屋后增地下室结构 | |
KR20090037419A (ko) | 다단계 긴장을 적용한 프리캐스트 코핑부의 시공 방법 | |
CN104563147B (zh) | 适用于岩溶区的组合结构桩基础及其施工方法 | |
CN103758362A (zh) | 既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法 | |
CN104532852A (zh) | 对拉式预应力管桩基坑支护结构及其安装方法 | |
CN204401627U (zh) | 对拉式预应力管桩基坑支护结构 | |
KR101290140B1 (ko) | 강관말뚝과 중공 콘크리트 말뚝의 합성에 의한 심부구속구조를 가지는 합성말뚝 및 그 시공방법 | |
US9238921B2 (en) | Method and arrangements relating to foundation for antenna mast of wireless communication system | |
CN101793027A (zh) | 一种桩心注浆静压锚杆桩 | |
KR102254227B1 (ko) | Pc 말뚝캡이 구비된 고강도 콘크리트 말뚝 구조체 및 이의 시공 방법 | |
US9523194B2 (en) | Reinforced blockwork construction method | |
CN113417300A (zh) | 边坡支护系统及其施工方法 | |
EP2495394A1 (en) | Tunnel with exterior tube and reinforced interior tube | |
JP2013224529A (ja) | 杭基礎の補強構造および補強方法 | |
CN108265823A (zh) | 装配式钢管混凝土柱-独立基础-混凝土圈梁l形连接节点 | |
KR20140110491A (ko) | 안장형 띠철근과 이중 대근을 이용한 hpc기둥의 제작방법 및 이를 이용한 시공방법 | |
KR20120122024A (ko) | 커플러와 볼트를 활용하여 가설 흙막이벽과 지하실 외벽을 일체화하는 공법 | |
KR101733928B1 (ko) | 연속보 구조를 구비한 패널식 옹벽 | |
JP6461690B2 (ja) | 基礎構造及び基礎施工方法 | |
KR101696282B1 (ko) | 흙막이용 강관을 이용한 pc 벽체, 그 pc 벽체가 적용된 모듈식 지하구조물 및 그 pc 벽체의 연결방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150422 |