CN204808407U - Gas storage storehouse surface equipment's risk assessment system - Google Patents

Gas storage storehouse surface equipment's risk assessment system Download PDF

Info

Publication number
CN204808407U
CN204808407U CN201520278648.5U CN201520278648U CN204808407U CN 204808407 U CN204808407 U CN 204808407U CN 201520278648 U CN201520278648 U CN 201520278648U CN 204808407 U CN204808407 U CN 204808407U
Authority
CN
China
Prior art keywords
equipment
assessed
risk
processor
failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520278648.5U
Other languages
Chinese (zh)
Inventor
张余
韩忠晨
董绍华
费凡
吴志平
周永涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Pipe Network Group Beijing Pipeline Co ltd
Petrochina Co Ltd
China Oil and Gas Pipeline Network Corp
Original Assignee
China Petroleum and Natural Gas Co Ltd
Petro China Beijing Natural Gas Pipeline Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd, Petro China Beijing Natural Gas Pipeline Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201520278648.5U priority Critical patent/CN204808407U/en
Application granted granted Critical
Publication of CN204808407U publication Critical patent/CN204808407U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a gas storage storehouse surface equipment's risk assessment system. Wherein, this system includes: a plurality of surface equipment that treat the aassessment, communication is establish with every surface equipment who treats the aassessment respectively to aassessment equipment, and aassessment equipment includes: recognition device and treater, wherein, recognition device for discern the risk factor that a plurality of surface equipment that treat the aassessment correspond, the treater is connected with recognition device for the surface equipment's of aassessment inefficacy assessment result is treated in at least one inefficacy consequence factor calculation according to risk factor confirms, and is treated the surface equipment's of aassessment probability of failure according to at least one probability of failure factor calculation that risk factor confirms. Through the embodiment of the utility model provides a, solved among the prior art safety of gas storage storehouse ground technology facility and examined the higher technical problem of cost, realized showing the effect that reduces the inspection cost on the basis of guaranteeing gas storage storehouse surface equipment safe operation.

Description

The risk evaluating system of gas storage uphole equipment
Technical field
The utility model relates to equipment Inspection field, in particular to a kind of risk evaluating system of gas storage uphole equipment.
Background technology
At the beginning of the eighties in last century, safety system engineering starts to import into domestic, is subject to the great attention of administrative authority of many big-and-middle-sized petroleum chemical enterprises.Some large petrochemical plants absorb external method and software carries out risk assessment to the equipment of oneself, compare fire, the explosion index evaluation method of typical method as The Dow Chemical Co. (US) 2030 Dow Center, Abbott Road, Midland, Michigan 48640.This evaluation method, by material flammability rating with based on based on the material coefficient of material stability, adds dangerous additional coefficient that is general and special process, the fire explosion index of calculation element.Although use for reference the method come at home digestibility and utilization to a certain extent, external risk assessment technology, based on the flourishing industrial level of the country one belongs to and equipment Management Level, can not adapt to domestic petrochemical system completely.The risk evaluating system of current most domestic petrochemical equipment is based on safety checklist, Dow Chemical index method and Meng De index method etc., although the relative safety of equipment can be evaluated to a certain extent, less consideration safety management level and local device damage are on the impact of general safety, and the analysis about safety management time most is all descriptive, cogency is not strong.
In gas storage actual motion, in order to ensure the safe operation of equipment, need to carry out safety detection to the ground main technique facility of gas storage.In order to form complete effective gas storage ground main technique facility detection method, first must carry out risk assessment to gas storage ground main technique facility, detecting according to the arrangement of risk assessment conclusion.But because the risk assessment conclusion accuracy of existing methods of risk assessment is lower, based on this inaccurate risk evaluation result, safety verification is carried out to gas storage ground main technique facility, cause inspection cost higher.
For the problem that the safety verification cost of gas storage surface technology facility in prior art is higher, at present effective solution is not yet proposed.
Utility model content
The utility model embodiment provides a kind of risk evaluating system of gas storage uphole equipment, with the technical matters that the safety verification cost at least solving gas storage surface technology facility in prior art is higher.
According to an aspect of the utility model embodiment, provide a kind of risk evaluating system of gas storage uphole equipment, comprising: multiple uphole equipment to be assessed; Assessment apparatus, set up with each uphole equipment to be assessed respectively and communicate, assessment apparatus comprises: recognition device and processor, and wherein, recognition device, for identifying the risk factors that multiple uphole equipment to be assessed is corresponding; Processor, be connected with recognition device, at least one failure consequence factor for determining according to risk factors calculates the Failure Assessment result of uphole equipment to be assessed, and calculates the failure probability of uphole equipment to be assessed according at least one failure probability factor that risk factors are determined.
Further, uphole equipment to be assessed is following any one or plurality of devices: metering separator, gas injection pipeline, air compressor, production separator, fuel gas surge tank, closed drain tank, instrument wind storage tank, the air cooler that enters the station, plate type finned heat exchanger, the separation vessel that enters the station, low-temperature separator, ethylene glycol regenerating device, vibrating spectral analysis, the filtrator that enters the station, reciprocating compressor, condensation heater, shell-and-tube heat exchanger and vibrating spectral analysis outlet oil strainer.
Further, risk evaluating system also comprises: the first memory device, is connected with processor, for storing at least one failure probability factor of at least one failure consequence Summing Factor.
Further, processor comprises: the first sub-processor, is connected with the first memory device, for calculating the Failure Assessment result of uphole equipment to be assessed according at least one failure consequence factor; Second sub-processor, is connected with the first memory device, for calculating the failure probability of uphole equipment to be assessed according at least one failure probability factor; 3rd sub-processor, is connected with the first sub-processor and the second sub-processor respectively, for determining the risk class of uphole equipment to be assessed based on failure consequence assessment result, failure probability and the risk Metrics that obtains in advance.
Further, processor also comprises: collecting device, is connected with uphole equipment to be assessed, for gathering the device parameter of uphole equipment to be assessed; Fetch equipment, is connected with uphole equipment to be assessed, for reading the Default Value parameter of uphole equipment to be assessed; Comparer, is connected with collecting device and fetch equipment respectively, for compare facilities parameter and Default Value parameter, obtains comparative result; 4th sub-processor, for determining the risk factors of uphole equipment to be assessed according to comparative result.
Further, risk evaluating system also comprises: display, is connected respectively with processor and recognition device, for showing risk factors corresponding to multiple uphole equipment to be assessed, failure consequence assessment result and failure probability.
Further, risk evaluating system also comprises: starter gear, is connected with processor, for the work of start treatment device.
Further, risk evaluating system also comprises: signal generates equipment, is connected with processor, during for exceeding predetermined level value at risk class, generates alerting signal.
Further, risk evaluating system also comprises: panalarm, generates equipment connection with signal, for reporting to the police according to alerting signal.
Further, panalarm comprises: pilot lamp, generates equipment connection with signal, for lighting when receiving alerting signal; Loudspeaker, generates equipment connection with signal, for playing alerting signal.
Adopt the utility model embodiment, after recognition device identifies risk factors corresponding to multiple uphole equipment to be assessed, processor determines at least one failure consequence silver and at least one failure probability factor of uphole equipment to be assessed according to the risk factors identified; The failure consequence assessment result of this uphole equipment to be assessed is generated according at least one failure consequence factor, and the failure probability of this uphole equipment to be assessed is generated according at least one failure probability factor, to instruct based on the failure consequence assessment result generated and failure probability, safety verification is carried out to this uphole equipment to be assessed.By the utility model embodiment, instruct according to the failure consequence assessment result generated and failure probability and safety verification is carried out to uphole equipment (as gas storage uphole equipment) to be assessed, reasonable distribution can be carried out to checkout resource under the limited condition of checkout resource, thus most of resource is invested the comparatively serious and equipment that failure probability is larger of failure consequence, less resource is invested the comparatively light and equipment that failure probability is less of failure consequence, overall risk is made to control in tolerance interval, reach the effect significantly reducing inspection cost on the basis ensureing the safe operation of gas storage uphole equipment.By the utility model embodiment, solve the technical matters that the safety verification cost of gas storage surface technology facility in prior art is higher, achieve the effect significantly reducing inspection cost on the basis ensureing the safe operation of gas storage uphole equipment.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide further understanding of the present utility model, and form a application's part, schematic description and description of the present utility model, for explaining the utility model, is not formed improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the schematic diagram of the risk evaluating system of gas storage uphole equipment according to the utility model embodiment;
Fig. 2 is the schematic diagram of a kind of optional gas storage uphole equipment according to the utility model embodiment; And
Fig. 3 is the schematic diagram of a kind of optional risk Metrics according to the utility model embodiment.
Embodiment
The utility model scheme is understood better in order to make those skilled in the art person, below in conjunction with the accompanying drawing in the utility model embodiment, technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the embodiment of the utility model part, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all should belong to the scope of the utility model protection.
It should be noted that, term " first ", " second " etc. in instructions of the present utility model and claims and above-mentioned accompanying drawing are for distinguishing similar object, and need not be used for describing specific order or precedence.Should be appreciated that the data used like this can be exchanged in the appropriate case, so as embodiment of the present utility model described herein can with except here diagram or describe those except order implement.In addition, term " comprises " and " having " and their any distortion, and intention is to cover not exclusive comprising.
Fig. 1 is the schematic diagram of the risk evaluating system of gas storage uphole equipment according to the utility model embodiment, and as shown in Figure 1, this system can comprise: multiple uphole equipment 10 (only illustrating in Fig. 1) to be assessed; Assessment apparatus 30, set up with each uphole equipment to be assessed respectively and communicate, assessment apparatus comprises: recognition device 31 and processor 33, and wherein, recognition device, for identifying the risk factors that multiple uphole equipment to be assessed is corresponding; Processor, be connected with recognition device, at least one failure consequence factor for determining according to risk factors calculates the Failure Assessment result of uphole equipment to be assessed, and calculates the failure probability of uphole equipment to be assessed according at least one failure probability factor that risk factors are determined.
Adopt the utility model embodiment, after recognition device identifies risk factors corresponding to multiple uphole equipment to be assessed, processor determines at least one failure consequence silver and at least one failure probability factor of uphole equipment to be assessed according to the risk factors identified; The failure consequence assessment result of this uphole equipment to be assessed is generated according at least one failure consequence factor, and the failure probability of this uphole equipment to be assessed is generated according at least one failure probability factor, to instruct based on the failure consequence assessment result generated and failure probability, safety verification is carried out to this uphole equipment to be assessed.By the utility model embodiment, instruct according to the failure consequence assessment result generated and failure probability and safety verification is carried out to uphole equipment (as gas storage uphole equipment) to be assessed, reasonable distribution can be carried out to checkout resource under the limited condition of checkout resource, thus most of resource is invested the comparatively serious and equipment that failure probability is larger of failure consequence, less resource is invested the comparatively light and equipment that failure probability is less of failure consequence, overall risk is made to control in tolerance interval, reach the effect significantly reducing inspection cost on the basis ensureing the safe operation of gas storage uphole equipment.By the utility model embodiment, solve the technical matters that the safety verification cost of gas storage surface technology facility in prior art is higher, achieve the effect significantly reducing inspection cost on the basis ensureing the safe operation of gas storage uphole equipment.
In the utility model above-described embodiment, uphole equipment to be assessed can be following any one or plurality of devices: metering separator, gas injection pipeline, air compressor, production separator, fuel gas surge tank, closed drain tank, instrument wind storage tank, the air cooler that enters the station, plate type finned heat exchanger, the separation vessel that enters the station, low-temperature separator, ethylene glycol regenerating device, vibrating spectral analysis, the filtrator that enters the station, reciprocating compressor, condensation heater, shell-and-tube heat exchanger and vibrating spectral analysis outlet oil strainer.
Particularly, uphole equipment to be assessed can be gas storage uphole equipment, and as shown in Figure 2, gas storage uphole equipment mainly comprises gathering system 21, metering outfit 22, compressor 23, dehydration desulfurizer 24 and external transport pipeline 25 etc.Gathering system is the intermediate link connecting injection-production well 26 and central station (not shown in Fig. 2), and this gathering system is identical with the gathering system in general gas field, and just gas-gathering line is thicker, and volume is larger, and the large well of ability and gas storage matches like this.Compressor is located at from the central station close to well usually, for gas injection or gas production.Compressor is generally used for gas injection, because the pressure of the pressure ratio pipe network system of underground natural gas storage is high.Dew point control device (as dehydration desulfurizer) mainly dewaters to gas well extraction gas, de-hydrocarbon process, prevents rock gas from long-distance transport pipes, forming hyrate or produces natural air lift lime set frozen block pipeline, slowing down the corrosion to long-distance transport pipes.External transport pipeline couples together gas storage central station and gas transmission line.The length of external transport pipeline depends on distance between the two, and it is in fact the same with other transfer lines in gas storage system, and design is also identical.
Alternatively, in order to assess one by one uphole equipment (as gas storage uphole equipment) to be assessed, can according to equipment function separately by its division unit, gas storage uphole equipment can comprise several unit divided by function as follows:
(1) injection-production well mouth device and note adopt pipeline: injection-production well is the passage of gas storage under rock gas turnover, the main above-ground line of its well head set-up, valve group, metering separator, well head heating restriction device, service cylinder, ball collecting chamber, instrument cubicle.
(2) gas gathering station: the function of gas gathering station, after the well stream of gas production in the future thing carries out two-phase laminated flow two-phase flow measurement, enters production separator, divide and give vent to anger into dew point control device, transport to multi-purpose station after point fluid throttling pressure regulation.Its device mainly contains air compressor, lime set service cylinder, ball collecting chamber, fuel gas surge tank, closed drain tank, production separator, instrument wind storage tank.
(3) dew point control device: dew point control device major equipment is for the air cooler that enters the station is (because dew point device operates in the winter time, environment temperature is lower, and dry air cooled heat exchanger can meet heat transfer requirements), plate type finned heat exchanger, the separation vessel that enters the station, low-temperature separator, rich ethylene glycol separation vessel and ethylene glycol regenerating device.
(4) gas injection plant: the major equipment of gas injection plant has vibrating spectral analysis, enter the station filtrator and compressor outlet oil strainer.Wherein, vibrating spectral analysis is the nucleus equipment of gas injection plant, only has the safe and reliable operation of vibrating spectral analysis, the normal operation of the whole gas storage of guarantee.The filtrator that enters the station removes the dust granules that in the gas that enters the station, diameter is greater than 5 μm.The compressor lubricant oil carried in dry gas after compressor outlet oil strainer removing compressor, ensures that gas storage is not contaminated.
By the utility model above-described embodiment, when carrying out risk assessment to the uphole equipment of gas storage, consider the parameter of distinct device in gas storage actual motion, the situation that operating mode differs, different failure consequence evaluation results and failure probability is drawn based on distinct device, what difference can be had to stress to distinct device carries out safety verification, thus when checkout resource is limited, most of resource is invested the equipment of risk comparatively large (as comparatively serious in failure consequence and failure probability is handed over greatly), and minor resource is invested the equipment of risk less (as comparatively light in failure consequence and failure probability is handed over little), overall risk is controlled within the acceptable range, reach ensure equipment safety operation basis on significantly reduce the effect of inspection cost.
According to the utility model above-described embodiment, risk evaluating system can also comprise: the first memory device, is connected with processor, for storing at least one failure probability factor of at least one failure consequence Summing Factor.
Particularly, first memory device can at least one failure probability factor of at least one failure consequence Summing Factor of determining of storage of processor, so that this at least one failure probability factor of at least one failure consequence Summing Factor of follow-up use calculates Failure Assessment result and the failure probability of uphole equipment to be assessed.
In the utility model above-described embodiment, processor can comprise: the first sub-processor, is connected with the first memory device, for calculating the Failure Assessment result of uphole equipment to be assessed according at least one failure consequence factor; Second sub-processor, is connected with the first memory device, for calculating the failure probability of uphole equipment to be assessed according at least one failure probability factor; 3rd sub-processor, is connected with the first sub-processor and the second sub-processor respectively, for determining the risk class of uphole equipment to be assessed based on failure consequence assessment result, failure probability and the risk Metrics that obtains in advance.
Particularly, after at least one the failure consequence factor determining uphole equipment to be assessed, first sub-processor reads type and the weighted value of each failure consequence factor, inquire about the first inefficacy score value corresponding with the type of each failure consequence factor, using the product of the weighted value of each failure consequence factor and the first corresponding inefficacy score value as the appraisal result CF of each failure consequence factor, each appraisal result is then used to calculate the failure consequence assessment result COF of this uphole equipment to be assessed.
Further, after at least one the failure probability factor determining uphole equipment to be assessed, second sub-processor reads type and the weighted value of each failure probability factor, inquire about the second inefficacy score value corresponding with the type of each failure probability factor, using the product of the weighted value of each failure probability factor and the second corresponding inefficacy score value as the factor score LF of each failure probability factor, each factor score LF is then used to calculate the failure probability LOF of this uphole equipment to be assessed.
In this embodiment, after the failure consequence assessment result calculating uphole equipment to be assessed and failure probability, the 3rd sub-processor can also calculate the risk class of uphole equipment to be assessed according to this failure consequence assessment result, this failure probability and the risk Metrics obtained in advance.Particularly, the 3rd sub-processor inquires about failure consequence grade corresponding to this failure consequence assessment result, and inquires about failure probability grade corresponding to this failure probability; Based on the risk Metrics obtained in advance, determine failure consequence grade and failure probability grade are to should which region of risk Metrics, and using the risk class of the value-at-risk in this region as this uphole equipment to be assessed.
Further, 3rd word processor using the value of failure consequence grade as abscissa value, and using the value of failure probability grade as ordinate value, risk Metrics locates a position, and using this position as the region in above-described embodiment, using read this region value-at-risk and by the risk class of this value-at-risk as this uphole equipment to be assessed.
In an optional embodiment, the failure consequence grade of above-mentioned uphole equipment can be divided into A ~ E five grades successively according to equipment failure consequence assessment result COF, wherein, the A level failure consequence that evaluation score is minimum is the lightest, otherwise, the E level failure consequence that evaluation score is the highest is the most serious, specifically sees the table 1 of failure consequence grade classification.
Table 1
Failure consequence classification Score value
A <28
B 28~35
C 35~41
D 41~49
E 49~95
In this embodiment, similar with failure consequence, failure probability can be divided into 1 ~ 5 five grade, wherein, 1 grade of failure probability of marking minimum is minimum, otherwise 5 grades of failure probabilities that evaluation score is the highest are the highest, specifically see the table 2 of failure probability grade classification.
Table 2
Failure probability classification Score value
1 <88
2 88~130
3 130~214
4 214~806
5 >806
Further, using failure consequence grade as horizontal ordinate, and with failure probability grade for ordinate, failure probability and failure consequence can be divided into different brackets by the order of severity, form a risk Metrics, as shown in Figure 3.In figure 3, failure probability grade 1 to 5 grades represents that probable value increases successively, failure consequence grade A to E represents that consequence is more and more serious, value-at-risk is also divided into five risk class according to Fig. 3, correspond to low-risk district respectively and (comprise the A1 region in Fig. 3, B1 region and A2 region), medium to low-risk district (comprises the A3 region in Fig. 3, B2 region and B3 region), apoplexy danger zone (comprises the A4 region in Fig. 3, B4 region, C1 region, C2 region, C3 region, D1 region and D2 region), medium or high risk district (comprises the A5 region in Fig. 3, B5 region, C4 region, C5 region, D3 region, D4 region, E1 region and E2 region) and high risk area (comprise the D5 region in Fig. 3, E3 region, E4 region and E5 region).When the failure consequence assessment result of a certain uphole equipment to be assessed and failure probability fall into certain position of matrix, the risk class using the value-at-risk of this position as this uphole equipment to be assessed.
If according to risk class arrangement inspection or the maintenance of uphole equipment to be assessed, then in Fig. 3 lower left corner low-risk region due to occur failure probability low, failure consequence is not serious, failure risk is also low, when a certain uphole equipment to be assessed falls into this region, does not generally need to take measures; If fall into medium or high risk or high risk zone, then this uphole equipment to be assessed should as maintenance or the key object checked.To the process of risk, can implement by the measure be shown in Table 3.
Table 3
Grade Risk area The countermeasure taked
Low-risk district Risk within the acceptable range, does not need to take measures
Medium to low-risk district Take the circumstances into consideration to carry out checking and making a random inspection
Apoplexy danger zone Should regularly completely examine
Medium or high risk district Carry out on-line monitoring and Non-Destructive Testing
High risk area Take immediate steps, strengthen management and rectify and improve, eliminate accident potential
In the utility model above-described embodiment, first uphole equipment to be assessed is determined, then for this equipment, carry out data acquisition and integration, carry out risk factors collection afterwards, identify different failure mechanisms and possible failure mode, carry out failure probability and failure consequence calculating respectively according to often kind of failure mode, calculate the value-at-risk of often kind of failure mode respectively, finally carry out overall risk calculating and sequence.The highest failure mode of risk can be obtained from overall risk calculated value.If carry out risk assessment to multiple object, also the highest evaluation object of risk can be obtained.If needed, can according to Risk Calculation value implement general plan control measure, as carried out detection service arrangement according to risk ranking (comprise the risk ranking according to equipment/device, also comprise the risk ranking according to failure mode), different measure is taked to reduce risk.
By the utility model above-described embodiment, risk assessment can be carried out to gas storage uphole equipment, analyze risk factors and the risk class of gas storage ground major equipment, and determine to detect emphasis and detection order according to risk assessment conclusion, arrange to detect plan and Measures, emphasis inspection is carried out to excessive risk equipment, the object significantly reducing inspection cost on the basis ensureing equipment safety operation can be reached.
According to the utility model above-described embodiment, processor can also comprise: collecting device, is connected with uphole equipment to be assessed, for gathering the device parameter of uphole equipment to be assessed; Fetch equipment, is connected with uphole equipment to be assessed, for reading the Default Value parameter of uphole equipment to be assessed; Comparer, is connected with collecting device and fetch equipment respectively, for compare facilities parameter and Default Value parameter, obtains comparative result; 4th sub-processor, for determining the risk factors of uphole equipment to be assessed according to comparative result.
Particularly, after determining uphole equipment to be assessed, fetch equipment obtains the Default Value parameter (as design pressure when dispatching from the factory, thickness of pipe etc. when dispatching from the factory) of this uphole equipment to be assessed, collecting device gathers current device parameter (the i.e. parameter current of equipment after work after a while of this uphole equipment to be assessed, as operating pressure, thickness of pipe etc.), comparer is by comparing device parameter and its Default Value parameter of this uphole equipment to be assessed, and the 4th sub-processor determines the concrete risk factors of this uphole equipment to be assessed.
In an optional embodiment, major risk factors as shown in table 4 can be comprised to the risk factors of gas storage uphole equipment.
Table 4
According to the utility model above-described embodiment, risk evaluating system can also comprise: display, is connected respectively with processor and recognition device, for showing risk factors corresponding to multiple uphole equipment to be assessed, failure consequence assessment result and failure probability.
Particularly, display can the risk factors of the uphole equipment to be assessed that calculates of video-stream processor, failure consequence assessment result and failure probability, so that staff can understand the risk assessment parameter of uphole equipment to be assessed easily.
In the utility model above-described embodiment, risk evaluating system can also comprise: starter gear, is connected with processor, for the work of start treatment device.
Particularly, when needing to carry out risk assessment to the uphole equipment of gas storage, can be started working, to obtain the risk assessment parameter of uphole equipment to be assessed, as risk factors, failure consequence assessment result and failure probability etc. by control processor by starter gear.
According to the utility model above-described embodiment, risk evaluating system can also comprise: signal generates equipment, is connected with processor, during for exceeding predetermined level value at risk class, generates alerting signal.
Particularly, when the risk class that processor obtains exceedes predetermined level value (as III level), signal generating apparatus generates alerting signal, so that staff takes measures to reduce risk in time.
Further, risk evaluating system can also comprise: panalarm, generates equipment connection with signal, for reporting to the police according to alerting signal.
Particularly, panalarm, after the alerting signal receiving the generation of signal generation unit, will be reported to the police according to this alerting signal.
Further, panalarm can comprise: pilot lamp, generates equipment connection with signal, for lighting when receiving alerting signal; Loudspeaker, generates equipment connection with signal, for playing alerting signal.
Particularly, panalarm can be reported to the police by pilot lamp and loudspeaker, and after receiving alerting signal, pilot lamp lights, and alerting signal play by loudspeaker, to remind staff in time.
By the utility model above-described embodiment, risk assessment can be carried out to gas storage uphole equipment, analyze risk factors and the risk class of gas storage ground major equipment, and determine to detect emphasis and detection order according to risk assessment conclusion, arrange to detect plan and Measures, emphasis inspection is carried out to excessive risk equipment, the object significantly reducing inspection cost on the basis ensureing equipment safety operation can be reached.
Above-mentioned the utility model embodiment sequence number, just to describing, does not represent the quality of embodiment.
In above-described embodiment of the present utility model, the description of each embodiment is all emphasized particularly on different fields, in certain embodiment, there is no the part described in detail, can see the associated description of other embodiments.
The claimed risk evaluating system of the utility model and each assembly forming this risk evaluating system be all a kind of have determine shape, structure and occupy the entity products of certain space.Such as, recognition device and processor etc. are all can independent operating, the computer equipment terminal with particular hardware structure or server.
The above is only preferred implementation of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (10)

1. a risk evaluating system for gas storage uphole equipment, is characterized in that, comprising:
Multiple uphole equipment to be assessed;
Assessment apparatus, sets up with each described uphole equipment to be assessed respectively and communicates,
Described assessment apparatus comprises: recognition device and processor, wherein,
Described recognition device, for identifying the risk factors that described multiple uphole equipment to be assessed is corresponding;
Described processor, be connected with described recognition device, at least one failure consequence factor for determining according to described risk factors calculates the Failure Assessment result of described uphole equipment to be assessed, and calculates the failure probability of described uphole equipment to be assessed according at least one failure probability factor that described risk factors are determined.
2. system according to claim 1, it is characterized in that, described uphole equipment to be assessed is following any one or plurality of devices: metering separator, gas injection pipeline, air compressor, production separator, fuel gas surge tank, closed drain tank, instrument wind storage tank, the air cooler that enters the station, plate type finned heat exchanger, the separation vessel that enters the station, low-temperature separator, ethylene glycol regenerating device, vibrating spectral analysis, the filtrator that enters the station, reciprocating compressor, condensation heater, shell-and-tube heat exchanger and vibrating spectral analysis outlet oil strainer.
3. system according to claim 1, is characterized in that, described risk evaluating system also comprises:
First memory device, is connected with described processor, for storing at least one failure probability factor described at least one failure consequence Summing Factor described.
4. system according to claim 3, is characterized in that, described processor comprises:
First sub-processor, is connected with described first memory device, for calculating the Failure Assessment result of described uphole equipment to be assessed according at least one failure consequence factor described;
Second sub-processor, is connected with described first memory device, for calculating the failure probability of described uphole equipment to be assessed according at least one failure probability factor described;
3rd sub-processor, is connected with described first sub-processor and described second sub-processor respectively, for determining the risk class of described uphole equipment to be assessed based on described failure consequence assessment result, described failure probability and the risk Metrics that obtains in advance.
5. system as claimed in any of claims 1 to 4, is characterized in that, described processor also comprises:
Collecting device, is connected with described uphole equipment to be assessed, for gathering the device parameter of described uphole equipment to be assessed;
Fetch equipment, is connected with described uphole equipment to be assessed, for reading the Default Value parameter of described uphole equipment to be assessed;
Comparer, is connected with described collecting device and described fetch equipment respectively, for more described device parameter and described Default Value parameter, obtains comparative result;
4th sub-processor, for determining the risk factors of described uphole equipment to be assessed according to described comparative result.
6. system as claimed in any of claims 1 to 4, is characterized in that, described risk evaluating system also comprises:
Display, is connected with described processor and described recognition device respectively, for showing risk factors corresponding to described multiple uphole equipment to be assessed, described failure consequence assessment result and described failure probability.
7. system as claimed in any of claims 1 to 4, is characterized in that, described risk evaluating system also comprises:
Starter gear, is connected with described processor, for starting the work of described processor.
8. system as claimed in any of claims 1 to 4, is characterized in that, described risk evaluating system also comprises:
Signal generates equipment, is connected with described processor, for when described risk class exceedes predetermined level value, generates alerting signal.
9. system according to claim 8, is characterized in that, described risk evaluating system also comprises:
Panalarm, generates equipment connection with described signal, for reporting to the police according to described alerting signal.
10. system according to claim 9, is characterized in that, described panalarm comprises:
Pilot lamp, generates equipment connection with described signal, for lighting when receiving described alerting signal;
Loudspeaker, generates equipment connection with described signal, for playing described alerting signal.
CN201520278648.5U 2015-04-30 2015-04-30 Gas storage storehouse surface equipment's risk assessment system Active CN204808407U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520278648.5U CN204808407U (en) 2015-04-30 2015-04-30 Gas storage storehouse surface equipment's risk assessment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520278648.5U CN204808407U (en) 2015-04-30 2015-04-30 Gas storage storehouse surface equipment's risk assessment system

Publications (1)

Publication Number Publication Date
CN204808407U true CN204808407U (en) 2015-11-25

Family

ID=54593192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520278648.5U Active CN204808407U (en) 2015-04-30 2015-04-30 Gas storage storehouse surface equipment's risk assessment system

Country Status (1)

Country Link
CN (1) CN204808407U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108287543A (en) * 2017-01-10 2018-07-17 德国福维克控股公司 Method for running ground processing equipment
CN108416492A (en) * 2018-01-26 2018-08-17 合肥通用机械研究院有限公司 Failure consequence computational methods in a kind of checkout procedure of the atmospheric storage tank based on risk
CN113128807A (en) * 2019-12-31 2021-07-16 中国石油天然气股份有限公司 Circumferential weld risk evaluation method and device and storage medium

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108287543A (en) * 2017-01-10 2018-07-17 德国福维克控股公司 Method for running ground processing equipment
CN108287543B (en) * 2017-01-10 2022-08-02 德国福维克控股公司 Method for operating a ground treatment installation
CN108416492A (en) * 2018-01-26 2018-08-17 合肥通用机械研究院有限公司 Failure consequence computational methods in a kind of checkout procedure of the atmospheric storage tank based on risk
CN113128807A (en) * 2019-12-31 2021-07-16 中国石油天然气股份有限公司 Circumferential weld risk evaluation method and device and storage medium
CN113128807B (en) * 2019-12-31 2024-05-03 中国石油天然气股份有限公司 Circumferential weld risk evaluation method, circumferential weld risk evaluation device and storage medium

Similar Documents

Publication Publication Date Title
CN106204319A (en) The methods of risk assessment of gas storage ground installation and device
CN105891629B (en) A kind of discrimination method of transformer equipment failure
CN102621421B (en) Transformer state evaluation method based on correlation analysis and variable weight coefficients
CN102981108B (en) Transformer internal insulation aging diagnosis method based on multi-feature information fusion technology
CN103576050B (en) A kind of running status appraisal procedure of capacitance type potential transformer
CN105893700A (en) Chemical production on-line fault detection and diagnosis technique based on physical-large data hybrid model
CN110675038B (en) Urban underground comprehensive pipe gallery risk assessment method based on control force
CN204808407U (en) Gas storage storehouse surface equipment's risk assessment system
CN104091008B (en) Based on the user power utilization equipment safety appraisal procedure improving interval based AHP
CN109409729B (en) Method for evaluating vulnerability of city around oil and gas pipeline
CN106447205A (en) Method for evaluating state of distribution automation terminal based on analytic hierarchy process
CN103631681A (en) Method for online restoring abnormal data of wind power plant
CN103488907B (en) The computational methods of natural gas line damage from third-party failure probability
CN103324992A (en) Transformer risk prediction method based on markov and entropy weight fuzzy comprehensive evaluation
CN109144028A (en) A kind of rectifying column efficiency deterioration detecting
CN108305014A (en) A kind of failure model and effect analysis method based on reliability room and Rough Ideals point method
CN110298540A (en) A kind of oil gas field surface duct internal corrosion risk evaluating method
CN104123468A (en) Distribution transformer state assessment method based on kernel state quantity set
CN115949890A (en) Urban gas pipe network leakage monitoring grading alarm and disposal method
CN112465412A (en) Power plant production information graphical method based on IMS system
CN108052540A (en) A kind of pipeline fault anticipation and preprocess method based on GIS pipe network systems
CN106649906A (en) Energy consumption analyzing method and system used for oil field gathering and transportation system
CN106651206A (en) Method for evaluating testability evaluation index system of relay protection
CN104346627A (en) Big data analysis-based SF6 (sulfur hexafluoride) gas leakage online early warning platform
CN107292759A (en) Distribution network planning based on power supply reliability calculates analysis system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100007 Oil Mansion, 9 North Avenue, Dongcheng District, Beijing, Dongzhimen

Patentee after: PETROCHINA Co.,Ltd.

Patentee after: National Pipe Network Group Beijing Pipeline Co.,Ltd.

Address before: 100007 Oil Mansion, 9 North Avenue, Dongcheng District, Beijing, Dongzhimen

Patentee before: PETROCHINA Co.,Ltd.

Patentee before: PETROCHINA BEIJING GAS PIPELINE CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211229

Address after: Room 08-10, 6 / F, block a, No. 5, Dongtucheng Road, Chaoyang District, Beijing 100013

Patentee after: National Petroleum and natural gas pipeline network Group Co.,Ltd.

Patentee after: National Pipe Network Group Beijing Pipeline Co.,Ltd.

Address before: 100007 Oil Mansion, 9 North Avenue, Dongcheng District, Beijing, Dongzhimen

Patentee before: PETROCHINA Co.,Ltd.

Patentee before: National Pipe Network Group Beijing Pipeline Co.,Ltd.