CN204780967U - Be applied to high board position raft board basis of transformer substation's complex building - Google Patents

Be applied to high board position raft board basis of transformer substation's complex building Download PDF

Info

Publication number
CN204780967U
CN204780967U CN201520384017.1U CN201520384017U CN204780967U CN 204780967 U CN204780967 U CN 204780967U CN 201520384017 U CN201520384017 U CN 201520384017U CN 204780967 U CN204780967 U CN 204780967U
Authority
CN
China
Prior art keywords
board
plate
complex building
building
foundation beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520384017.1U
Other languages
Chinese (zh)
Inventor
叶芳问
曾奇
徐冬华
何玉辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Sinogy Electric Engineering Co Ltd
Original Assignee
China Sinogy Electric Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Sinogy Electric Engineering Co Ltd filed Critical China Sinogy Electric Engineering Co Ltd
Priority to CN201520384017.1U priority Critical patent/CN204780967U/en
Application granted granted Critical
Publication of CN204780967U publication Critical patent/CN204780967U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a be applied to high board position raft board basis of transformer substation's complex building, including foundation beam and high -order board, the top surface of foundation beam and high -order board is on same plane, the flange of high -order board adopts the crisscross banding mode of muscle crotch of indulging along the side banding, the foundation beam adopts brick, soil or concrete fetal membrane to pour, is equipped with the pea gravel concreten that 40mm is thick and looks for domatic layer, two -way arrangement of reinforcement on the top surface of foundation beam and high -order board to stay branch storehouse seam, as the floor of cable intermediate layer, reduced the work of building the alley wall by laying bricks or stones, spreading the prefabricated plate, further reduced material and budget, the reduction of erection time. The utility model discloses effective problem of building the alley wall by laying bricks or stones and dividing the prefabricated plate of solving under equal cable clamp floor face requires, reduces the material, reduces the budget, and the construction is simple, the reduction of erection time.

Description

A kind of high plate position raft foundation being applied to transformer station's complex building
Technical field
The utility model relates to a kind of raft foundation, specifically a kind of high plate position raft foundation being applied to transformer station's complex building.
Background technology
At present, the raft plated construction of low position is all used on the basis of common transformer station complex building, its cable floor ground has been come mainly through making precast plate, precast plate is held on building block sleeper wall and grade beam, precast plate shelving length is not less than 100mm, as shown in Figure 1-2, first the position of sleeper wall is determined, divide the size of precast plate again, choose corresponding model, in concrete implementation process, sleeper wall builds the corresponding height of cable interlayer flooring by laying bricks or stones, and the place contacted with precast plate arranges 240 high beams together, levelling with 20 thick seat slurries again, it lays precast plate.Precast plate supporting can add sleeper wall time inadequate, and sleeper wall all establishes spilled water hole.When precast plate is shelved and touched pillar, plate is cut out and is gone to post limit, and pillar limit is built 120 thick sleeper walls by laying bricks or stones and shelved plate, and sleeper wall is grown up in 3m, increases reinforced concrete structural column, and should establish every 500-600mm along grade beam or constructional column overall height in middle appropriate location lacing wire, lacing wire is through along wall total length.The thick pea gravel concreten surface layer of 40mm is done on ground, two way system and stay parting seam.When adopting low plate position to arrange at the bottom of beam with one flat at the bottom of plate, sleeper wall and precast plate construction complicated, materials demand is large, increases the budget of whole engineering.
Utility model content
The purpose of this utility model is to provide the high plate position raft foundation being applied to transformer station's complex building that a kind of material is economized, expense is few, to solve the problem proposed in above-mentioned background technology.
For achieving the above object, the utility model provides following technical scheme:
Be applied to a high plate position raft foundation for transformer station's complex building, comprise grade beam and high-order plate, the end face of described grade beam and high-order plate is in same plane.
As further program of the utility model: the end face of described grade beam and high-order plate is provided with the thick pea gravel concreten of 40mm and looks for domatic layer.
As further program of the utility model: the panel edges side edge sealing of described high-order plate adopts vertical muscle crotch to interlock edge sealing mode.
As the utility model further scheme: described grade beam employing brick, soil or concrete fetal membrane are built.
Compared with prior art, the beneficial effects of the utility model are:
The utility model effectively solves the problem of building sleeper wall by laying bricks or stones and dividing precast plate, and under comparable cable mezzanine floor requires, reduce material, prune a budget, construction is simple, the reduction of erection time.
Accompanying drawing explanation
Fig. 1 is the sleeper wall of raft foundation and the arrangement form of precast plate in prior art.
Fig. 2 is the connection detail of sleeper wall and precast plate in prior art.
Fig. 3 is the arrangement form that in the utility model, raft foundation and original base contrast.
Detailed description of the invention
Be described in more detail below in conjunction with the technical scheme of detailed description of the invention to this patent.
Refer to Fig. 3, a kind of high plate position raft foundation being applied to transformer station's complex building, comprise grade beam 1 and high-order plate 2, the end face of described grade beam 1 and high-order plate 2 is in same plane, and the high plate position that described grade beam 1 and high-order plate 2 adopt end face to flush is arranged, eliminates the work of construction sleeper wall and precast plate, prune a budget, reduction of erection time, the panel edges side edge sealing of described high-order plate 2 adopts vertical muscle crotch to interlock edge sealing mode, and described grade beam employing brick, soil or concrete fetal membrane are built.
The utility model utilizes high plate position to arrange to replace low plate position to arrange, makes grade beam 1 and the end face of high-order plate 2 form a complete plane, grade beam 1 with the end face of high-order plate 2 is provided with the thick pea gravel concreten of 40mm and looks for domatic layer, two way system and stay parting seam, as the flooring of cable interlayer, decrease the work of building sleeper wall, paving precast plate by laying bricks or stones, further reduce material and budget, the reduction of erection time.
The utility model effectively solves the problem of building sleeper wall by laying bricks or stones and dividing precast plate, and under comparable cable mezzanine floor requires, reduce material, prune a budget, construction is simple, the reduction of erection time.
Above the better embodiment of this patent is explained in detail, but this patent is not limited to above-mentioned embodiment, in the ken that one skilled in the relevant art possesses, various change can also be made under the prerequisite not departing from this patent aim.

Claims (4)

1. be applied to a high plate position raft foundation for transformer station's complex building, it is characterized in that, comprise grade beam (1) and high-order plate (2), the end face of described grade beam (1) and high-order plate (2) is in same plane.
2. the high plate position raft foundation being applied to transformer station's complex building according to claim 1, is characterized in that, described grade beam (1) is provided with the thick pea gravel concreten of 40mm with the end face of high-order plate (2) and looks for domatic layer.
3. the high plate position raft foundation being applied to transformer station's complex building according to claim 1, is characterized in that, the panel edges side edge sealing of described high-order plate (2) adopts vertical muscle crotch to interlock edge sealing mode.
4. the high plate position raft foundation being applied to transformer station's complex building according to claim 1, it is characterized in that, described grade beam (1) employing brick, soil or concrete fetal membrane are built.
CN201520384017.1U 2015-06-06 2015-06-06 Be applied to high board position raft board basis of transformer substation's complex building Expired - Fee Related CN204780967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520384017.1U CN204780967U (en) 2015-06-06 2015-06-06 Be applied to high board position raft board basis of transformer substation's complex building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520384017.1U CN204780967U (en) 2015-06-06 2015-06-06 Be applied to high board position raft board basis of transformer substation's complex building

Publications (1)

Publication Number Publication Date
CN204780967U true CN204780967U (en) 2015-11-18

Family

ID=54521050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520384017.1U Expired - Fee Related CN204780967U (en) 2015-06-06 2015-06-06 Be applied to high board position raft board basis of transformer substation's complex building

Country Status (1)

Country Link
CN (1) CN204780967U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939612A (en) * 2017-03-28 2017-07-11 山东天齐置业集团股份有限公司 A kind of large-scale Raft construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939612A (en) * 2017-03-28 2017-07-11 山东天齐置业集团股份有限公司 A kind of large-scale Raft construction
CN106939612B (en) * 2017-03-28 2019-04-26 山东天齐置业集团股份有限公司 A kind of large size Raft construction

Similar Documents

Publication Publication Date Title
CN205224363U (en) Connection structure of floor and girder steel
CN204343339U (en) A kind of temporary support columns waterproof base plate
CN202466620U (en) Reinforced concrete buttress retaining wall
CN103205976A (en) Multistage frame beam slope protection structure with self-adjustable slope body pressure
CN203066104U (en) H-shaped plain concrete brick and small ecological soil-blocking wall bricked by same
CN203320535U (en) Rock slope green protection structure
CN204780967U (en) Be applied to high board position raft board basis of transformer substation's complex building
CN102888855B (en) Combined balance weight retaining wall
CN202767102U (en) Combined type balance weight retaining wall
CN205134664U (en) A upper and lower double -deck concrete slab structure for girder steel
CN105756377B (en) A kind of swimming pool and its construction method
CN205100527U (en) A cantilever construction platform for surmounting retaining wall
CN204754202U (en) Rectangle template with adjustable
CN207775947U (en) A kind of isolated footing structure equipped with splash guard
CN102926403B (en) Roof construction method by cover-excavation method
CN103938597B (en) The eco-drainage ditch of the building block of modular eco-drainage ditch and formation
CN207392264U (en) A kind of lightweight steel construction assembles the aproll system of decoration integrated building
CN207512521U (en) A kind of box road structure of railway engineering thin-walled
CN203188222U (en) Slope pressure self-adjusting type multistage frame beam slope protecting structure
CN207686119U (en) Prefabricated panel
CN205046577U (en) Simple and easy retaining wall
CN207160268U (en) A kind of bending resistance shape attachment structure being used in assembling type steel structure
CN205444563U (en) Can prevent frame construction infilled wall of crackle
CN205100227U (en) Steep side slope geomembrane anchor structure of rock matter
CN205134339U (en) Tailing storehouse rock matter side slope top geomembrane anchor structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118

Termination date: 20200606

CF01 Termination of patent right due to non-payment of annual fee