CN204758644U - Experimental quick termination of zero magnetic flow current transformer - Google Patents
Experimental quick termination of zero magnetic flow current transformer Download PDFInfo
- Publication number
- CN204758644U CN204758644U CN201520434695.4U CN201520434695U CN204758644U CN 204758644 U CN204758644 U CN 204758644U CN 201520434695 U CN201520434695 U CN 201520434695U CN 204758644 U CN204758644 U CN 204758644U
- Authority
- CN
- China
- Prior art keywords
- plug
- wiring
- conversion module
- module
- test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rectifiers (AREA)
Abstract
本实用新型涉及一种零磁通电流互感器试验快速接线装置,包括电源转换模块、直流电流发生模块、接线方式转换模块、试验线,电源转换模块与直流电流发生模块相连接,电源转换模块上连接有直流电源输出插头、交流电源插头,直流电流发生模块连接有直流电流引线;试验线一端设有一次设备端插头,另一端设有二次电子模块端插头;接线方式转换模块上设有转换开关,接线方式转换模块输入端连接有测量仪器接线插头,输出端连接有零磁通CT二次电子模块接线插头。优点是:结构简单,操作方便,使零磁通CT试验不受地点限制,试验接线方便,不易损坏被试验设备,克服了以往零磁通CT试验接线复杂、耗时长、受试验地点限制的缺点。
The utility model relates to a quick wiring device for zero-flux current transformer test, which comprises a power conversion module, a DC current generation module, a wiring mode conversion module, and a test line. The power conversion module is connected with the DC current generation module, and the power conversion module is It is connected with a DC power output plug and an AC power plug, and the DC current generation module is connected with a DC current lead wire; one end of the test line is provided with a primary equipment end plug, and the other end is provided with a secondary electronic module end plug; the wiring mode conversion module is equipped with a conversion The input end of the switch and the wiring mode conversion module is connected with a measuring instrument wiring plug, and the output end is connected with a zero magnetic flux CT secondary electronic module wiring plug. The advantages are: simple structure, convenient operation, so that the zero-flux CT test is not limited by the location, the test wiring is convenient, and it is not easy to damage the tested equipment, which overcomes the shortcomings of the previous zero-flux CT test, such as complicated wiring, long time-consuming, and limited by the test location .
Description
技术领域technical field
本实用新型属于电力设备试验领域,尤其涉及一种零磁通电流互感器试验快速接线装置。The utility model belongs to the field of electric equipment test, in particular to a quick connection device for zero magnetic flux current transformer test.
背景技术Background technique
目前,在直流换流站中零磁通电流互感器CT得到广泛应用,如CT的一次设备需要接通3000A直流电,而CT的二次电子模块需要110V直流工作电源,因此对此类CT的一次设备和二次电子模块试验时,需要将沉重的被试验设备搬运到直流屏室,从直流屏上取直流电源,同时又要从交流插座上取交流电源,试验接线复杂,现场混乱,更改接线方式耗费时间,容易接错线或造成人员触电,更严重的是此类CT设备价格昂贵,对被试验设备的接线端子反复拆接线容易造成设备损坏,因此需要一种不受地点限制、接线方便的零磁通CT试验装置。At present, the zero-flux current transformer CT is widely used in DC converter stations. For example, the primary equipment of CT needs to be connected to 3000A DC, and the secondary electronic module of CT needs 110V DC power supply. When testing equipment and secondary electronic modules, it is necessary to move the heavy equipment to be tested to the DC panel room, take the DC power from the DC panel, and at the same time take the AC power from the AC socket. The test wiring is complicated and the site is chaotic. Change the wiring The method is time-consuming, and it is easy to connect wrong wires or cause electric shocks. What is more serious is that this type of CT equipment is expensive, and repeated disconnection of the terminals of the tested equipment is likely to cause equipment damage. The zero-flux CT test device.
发明内容Contents of the invention
为克服现有技术的不足,本实用新型的目的是提供一种零磁通电流互感器试验快速接线装置,结构简单,操作方便,使零磁通CT试验不受地点限制,试验接线方便,不易损坏被试验设备。In order to overcome the deficiencies of the prior art, the purpose of this utility model is to provide a quick wiring device for zero-flux current transformer test, which is simple in structure and easy to operate, so that the zero-flux CT test is not limited by the location, the test wiring is convenient, and it is not easy to connect. damage to the equipment under test.
为实现上述目的,本实用新型通过以下技术方案实现:In order to achieve the above object, the utility model is realized through the following technical solutions:
一种零磁通电流互感器试验快速接线装置,包括电源转换模块、直流电流发生模块、接线方式转换模块、直流电源输出插头、直流电流引线、试验线,电源转换模块与直流电流发生模块相连接,电源转换模块上连接有直流电源输出插头、交流电源插头,直流电流发生模块连接有直流电流引线;试验线一端设有一次设备端插头,另一端设有二次电子模块端插头;接线方式转换模块上设有转换开关,接线方式转换模块输入端连接有测量仪器接线插头,输出端连接有零磁通CT二次电子模块接线插头。A zero-flux current transformer test quick wiring device, including a power conversion module, a DC current generation module, a wiring mode conversion module, a DC power output plug, a DC current lead wire, and a test line, and the power conversion module is connected to the DC current generation module , the power conversion module is connected with a DC power output plug and an AC power plug, and the DC current generation module is connected with a DC current lead; one end of the test line is provided with a primary equipment end plug, and the other end is provided with a secondary electronic module end plug; the wiring mode is converted The module is provided with a changeover switch, the input end of the wiring mode conversion module is connected with a measuring instrument wiring plug, and the output end is connected with a zero magnetic flux CT secondary electronic module wiring plug.
所述的电源转换模块为WYK系列直流稳压稳流电源。The power conversion module is a WYK series DC stabilized voltage and stabilized current power supply.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
结构简单,操作方便,使零磁通CT试验不受地点限制,试验接线方便,不易损坏被试验设备,克服了以往零磁通CT试验接线复杂、耗时长、受试验地点限制的缺点。The structure is simple and the operation is convenient, so that the zero-flux CT test is not limited by the location, the test wiring is convenient, and the tested equipment is not easy to damage, which overcomes the shortcomings of the previous zero-flux CT test, such as complicated wiring, time-consuming, and limited by the test location.
实现了在同一地点完成零磁通CT的一次设备和二次电子模块的试验工作,不用再寻找有直流电源的地点,只取一路交流电源既可满足试验需求;试验插头可以实现与被试验设备接线端对接,避免反复拆接线对设备造成损坏;接线方式转换模块可以实现与被试验设备及试验仪器间插头连接,在测量不同参数时不必断电、更改接线,只需扳动模块上的转换开关即可测到所需参数。克服了以往零磁通CT试验接线复杂、耗时长、受试验地点限制的缺点。The test of the primary equipment and the secondary electronic module of the zero-flux CT can be completed at the same place, no need to look for a place with a DC power supply, and only one AC power supply can meet the test requirements; the test plug can be realized with the tested equipment The terminals are docked to avoid damage to the equipment caused by repeated disconnection of the wiring; the wiring mode conversion module can realize the plug connection between the tested equipment and the test instrument, and there is no need to cut off the power or change the wiring when measuring different parameters, just flip the switch on the module Switch to measure the required parameters. It overcomes the shortcomings of the previous zero-flux CT test, such as complicated wiring, long time-consuming, and limited by the test site.
附图说明Description of drawings
图1是电源转换模块接线示意图。Figure 1 is a schematic diagram of the wiring of the power conversion module.
图2是接线方式转换模块结构示意图。Figure 2 is a schematic diagram of the structure of the wiring mode conversion module.
图3是试验线结构示意图。Figure 3 is a schematic diagram of the test line structure.
图中:1-电源转换模块2-直流电流发生模块3-接线方式转换模块4-交流电源插头5-直流电源输出插头6-零磁通CT二次电子模块接线插头7-测量仪器接线插头8-二次电子模块端插头9-一次设备端插头10-直流电流引线。In the figure: 1-Power conversion module 2-DC current generation module 3-Wiring mode conversion module 4-AC power plug 5-DC power output plug 6-Zero flux CT secondary electronic module wiring plug 7-Measuring instrument wiring plug 8 -Secondary electronics module side plug 9-Primary equipment side plug 10-DC current leads.
具体实施方式Detailed ways
下面结合说明书附图对本实用新型进行详细地描述,但是应该指出本实用新型的实施不限于以下的实施方式。The utility model is described in detail below in conjunction with the accompanying drawings, but it should be pointed out that the implementation of the utility model is not limited to the following embodiments.
见图1-图3,一种零磁通电流互感器试验快速接线装置,电源转换模块1、直流电流发生模块2、接线方式转换模块3、直流电源输出插头5、直流电流引线10、试验线,电源转换模块1与直流电流发生模块2相连接,电源转换模块1上连接有直流电源输出插头5、交流电源插头4,直流电流发生模块2连接有直流电流引线10;试验线一端设有一次设备端插头9,另一端设有二次电子模块端插头8;接线方式转换模块3上设有转换开关,接线方式转换模块3输入端连接有测量仪器接线插头7,输出端连接有零磁通CT二次电子模块接线插头6。See Fig. 1-Fig. 3, a zero-flux current transformer test quick wiring device, power conversion module 1, DC current generation module 2, wiring mode conversion module 3, DC power output plug 5, DC current lead 10, test line , the power conversion module 1 is connected with the DC current generation module 2, the power conversion module 1 is connected with a DC power output plug 5 and the AC power plug 4, and the DC current generation module 2 is connected with a DC current lead 10; one end of the test line is provided with a primary The equipment end plug 9 is provided with a secondary electronic module end plug 8 at the other end; a changeover switch is provided on the wiring mode conversion module 3, and the input terminal of the wiring mode conversion module 3 is connected with a measuring instrument wiring plug 7, and the output terminal is connected with a zero magnetic flux CT secondary electronic module wiring plug 6.
其中,电源转换模块1为WYK系列直流稳压稳流电源,此处采用WYK100V100A直流稳压稳流电源。直流电流发生模块2采用DH1716A-13稳压稳流电源。Among them, the power conversion module 1 is a WYK series DC stabilized voltage and stabilized current power supply, and a WYK100V100A DC stabilized voltage and stabilized current power supply is used here. DC current generating module 2 adopts DH1716A-13 constant voltage and constant current power supply.
一种零磁通电流互感器试验快速接线装置的使用方法,交流电源插头4为电源转换模块1和直流电流发生模块2提供交流电源,电源转换模块1将交流电转换成直流电,通过直流电源输出插头5为零磁通CT二次电子模块提供110V直流电,直流电流发生模块2通过直流电流引线10为零磁通CT的一次设备提供模拟电流,即直流电流引线1010缠绕在零磁通电流互感器一次设备上模拟3000A直流电流,一次设备端插头9、二次电子模块端插头8分别连接零磁通CT的一次设备和二次电子模块,零磁通CT二次电子模块接线插头6将接线方式转换模块3与零磁通CT二次电子模块连接,测量仪器接线插头7与测量测量仪器对接;接线完毕后,交流电源插头4插到交流电源上通电开始试验,试验过程中操作接线方式转换模块3上的转换开关以改变接线方式,测量所需数据。A method for using a fast wiring device for a zero-flux current transformer test. The AC power plug 4 provides AC power for the power conversion module 1 and the DC current generation module 2. The power conversion module 1 converts the AC power into a DC power, and outputs the plug through the DC power supply. 5 provides 110V DC for the secondary electronic module of zero-flux CT, and the DC current generating module 2 provides analog current for the primary equipment of zero-flux CT through the DC current lead 10, that is, the DC current lead 1010 is wound around the primary zero-flux current transformer Simulate 3000A DC current on the device, plug 9 at the primary device end and plug 8 at the secondary electronic module end are respectively connected to the primary device and secondary electronic module of zero magnetic flux CT, and the wiring plug 6 of the secondary electronic module of zero magnetic flux CT converts the wiring mode Module 3 is connected to the zero-flux CT secondary electronic module, and the measuring instrument wiring plug 7 is connected to the measuring instrument; after the wiring is completed, the AC power plug 4 is inserted into the AC power supply to start the test, and the wiring mode conversion module 3 is operated during the test The changeover switch on the instrument can change the wiring mode and measure the required data.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520434695.4U CN204758644U (en) | 2015-06-23 | 2015-06-23 | Experimental quick termination of zero magnetic flow current transformer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520434695.4U CN204758644U (en) | 2015-06-23 | 2015-06-23 | Experimental quick termination of zero magnetic flow current transformer |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204758644U true CN204758644U (en) | 2015-11-11 |
Family
ID=54473339
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520434695.4U Expired - Fee Related CN204758644U (en) | 2015-06-23 | 2015-06-23 | Experimental quick termination of zero magnetic flow current transformer |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204758644U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105022016A (en) * | 2015-06-23 | 2015-11-04 | 国网辽宁省电力有限公司检修分公司 | Quick zero-flux current transformer test wiring device and use method |
| CN106970337A (en) * | 2017-05-31 | 2017-07-21 | 国家电网公司 | Control power source performance testing terminal and test method |
-
2015
- 2015-06-23 CN CN201520434695.4U patent/CN204758644U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105022016A (en) * | 2015-06-23 | 2015-11-04 | 国网辽宁省电力有限公司检修分公司 | Quick zero-flux current transformer test wiring device and use method |
| CN106970337A (en) * | 2017-05-31 | 2017-07-21 | 国家电网公司 | Control power source performance testing terminal and test method |
| CN106970337B (en) * | 2017-05-31 | 2023-05-26 | 国家电网公司 | Control power supply performance test terminals and test methods |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107462412B (en) | Mechanical property instrument for handcart switch integrated test | |
| CN106066435A (en) | Photovoltaic DC-to-AC converter aging testing system | |
| CN203133226U (en) | Polarity testing instrument for current transformer | |
| CN204758644U (en) | Experimental quick termination of zero magnetic flow current transformer | |
| CN104849611A (en) | Polarity test system of current transformer | |
| CN202421409U (en) | Portable polarity tester for mutual inductors | |
| CN105022016B (en) | A kind of zero-flux current transformer experiment rapid wiring device and application method | |
| CN207396708U (en) | 110kV polarity testing device of current transformer | |
| CN202870285U (en) | A portable simulation detection device of high-voltage live display apparatuses | |
| CN204142887U (en) | Wireless remote control type instrument for testing polarity of current transformer | |
| CN205862264U (en) | Portable multifunctional voltage x current source | |
| CN204903694U (en) | Current transformer polarity test system | |
| CN204228805U (en) | 10kV closes the portable live testing device of high-voltage board | |
| CN104931740B (en) | Quick switching device for Zero flux CT secondary electron module test wiring | |
| CN203720214U (en) | Quick connection testing wire with high universality | |
| CN204925288U (en) | Electrolytic capacitor fills discharge characteristics testing arrangement | |
| CN203422468U (en) | Electric energy meter maintenance tool | |
| CN203275632U (en) | Voltage transformer detection concentrator | |
| CN205941734U (en) | A device for handing over DC cable adds thermal ageing test | |
| CN203690595U (en) | Electrical appliance connecting wire and circuit board testing system | |
| CN206208928U (en) | Intelligent substation phase tests Special test line | |
| CN204330848U (en) | A kind of walkie high-current converter | |
| CN107589331B (en) | Relay protection testing device | |
| CN204462203U (en) | A kind of termination for transformer synthesis test | |
| CN203631926U (en) | Conversion device used in aviation plug wire connection |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151111 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |