CN205003236U CN201520781869.4U CN201520781869U CN205003236U CN 205003236 U CN205003236 U CN 205003236U CN 201520781869 U CN201520781869 U CN 201520781869U CN 205003236 U CN205003236 U CN 205003236U
Authority
CN
China
Prior art keywords
electric energy
energy meter
voltage
current
transformer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520781869.4U
Other languages
Chinese (zh)
Inventor
庄强
孙东
王�锋
金琳
李思同
匡荣
赵静
王晓梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Rizhao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Rizhao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Rizhao Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520781869.4U priority Critical patent/CN205003236U/en
Application granted granted Critical
Publication of CN205003236U publication Critical patent/CN205003236U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measurement Of Current Or Voltage (AREA)

Abstract

The utility model discloses an inspect device of high -pressure energy metering equipment wiring, it relates to high -tension electricity ability technical field, the ua of electric energy meter, ub, the punishment of uc terminal do not insert three -phase sinusoidal ac and press, and are connected with voltage transformer, and voltage transformer passes through load side's earth connection ground connection and form the current loop on high -pressure generating line, installs current transformer on the high -pressure generating line, and current transformer is connected with ua, the uc terminal of electric energy meter respectively, the utility model discloses a whether apply lower sinusoidal ac pressure at the electric energy meter end, read the secondary current who flows in the electric energy meter, draw the voltage and the electric current phasor diagram of electric energy meter end, it can work a telephone switchboard correctly by metering device to determine the high -tension electricity.

Description

A kind of device checking the wiring of high-voltage electric energy measurement equipment
Technical field
The utility model relates to a kind of device checking the wiring of high-voltage electric energy measurement equipment, belongs to high voltage electric energy technical field.
Background technology
For the device of high-voltage electric energy measurement mainly a kind of high-voltage electric energy meter in prior art, it is a kind of by being connected across two alternate single-phase high voltage electric power meters of A-B and C-B, its all electron device is all operated in high-pressure side, high to reliability requirement, must have a power failure after fault and could rush to repair, and large on high-tension side power taking difficulty, reliability is difficult to ensure.
Utility model content
For the problems referred to above, the technical problems to be solved in the utility model is to provide a kind of device checking the wiring of high-voltage electric energy measurement equipment.
A kind of device checking the wiring of high-voltage electric energy measurement equipment of the present utility model, it comprises electric energy meter, voltage transformer (VT), current transformer; Ua, Ub, Uc terminal place of electric energy meter accesses three phase sine alternating voltage respectively, and be connected with voltage transformer (VT), voltage transformer (VT) is by the ground connection of load side and form current return on high voltage bus, high voltage bus is provided with current transformer, and current transformer is connected with Ua, Uc terminal of electric energy meter respectively.
The beneficial effects of the utility model are:
1, structure is simple, and cost is low, effective, and reliability is high, easy to utilize;
2, wiring is simple, solves the wiring of conventional high-tension electric power meter complicated, secondary connect wire or cable longer, the problem that wiring not easily checks in high-tension switch cabinet installed by mutual inductor;
3, by applying lower sinusoidal voltage at electric power meter end, reading the secondary current flowing into electric energy meter, drawing the voltage and current phasor graph of electric power meter end, judging that whether high-voltage electric-energy meter wiring is correct.
Accompanying drawing explanation
For ease of illustrating, the utility model is described in detail by following concrete enforcement and accompanying drawing.
Fig. 1 is structural representation of the present utility model.
Embodiment
For making the purpose of this utility model, technical scheme and advantage clearly understand, below by the specific embodiment shown in accompanying drawing, the utility model is described.But should be appreciated that, these describe just exemplary, and do not really want to limit scope of the present utility model.In addition, in the following description, the description to known features and technology is eliminated, to avoid unnecessarily obscuring concept of the present utility model.
As shown in Figure 1, this embodiment by the following technical solutions: it comprises electric energy meter, voltage transformer pt, Current Transmit; Ua, Ub, Uc terminal place of electric energy meter accesses three phase sine alternating voltage respectively, and be connected with voltage transformer pt, voltage transformer pt is by the ground connection of load side and form current return on high voltage bus, current return generation current one I1, high voltage bus is provided with Current Transmit, current transformer is connected with Ua, Uc terminal of electric energy meter respectively, and electric current one I1 is through Current Transmit generation current two I2.
The principle of work of this embodiment is: use highly sensitive milliampere level clamp on amperemeter to obtain electric current two I2 at electric power meter end, draw out the phasor graph of three phase sine alternating voltage and electric current two I2, can judge that whether the overall wiring of electric power meter is correct by the phasor graph of three phase sine alternating voltage and electric current two I2; The no-load voltage ratio of current transformer can also be drawn by the ratio of calculating current one I1 and electric current two I2.
More than show and describe ultimate principle of the present utility model and principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and instructions just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (1)

1. check a device for high-voltage electric energy measurement equipment wiring, it is characterized in that: it comprises electric energy meter, voltage transformer (VT), current transformer; Ua, Ub, Uc terminal place of electric energy meter accesses three phase sine alternating voltage respectively, and be connected with voltage transformer (VT), voltage transformer (VT) is by the ground connection of load side and form current return on high voltage bus, high voltage bus is provided with current transformer, and current transformer is connected with Ua, Uc terminal of electric energy meter respectively.
CN201520781869.4U 2015-10-10 2015-10-10 Inspect device of high -pressure energy metering equipment wiring Expired - Fee Related CN205003236U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520781869.4U CN205003236U (en) 2015-10-10 2015-10-10 Inspect device of high -pressure energy metering equipment wiring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520781869.4U CN205003236U (en) 2015-10-10 2015-10-10 Inspect device of high -pressure energy metering equipment wiring

Publications (1)

Publication Number Publication Date
CN205003236U true CN205003236U (en) 2016-01-27

Family

ID=55160119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520781869.4U Expired - Fee Related CN205003236U (en) 2015-10-10 2015-10-10 Inspect device of high -pressure energy metering equipment wiring

Country Status (1)

Country Link
CN (1) CN205003236U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107179465A (en) * 2017-07-26 2017-09-19 国家电网公司 Extra-high voltage direct-current phase selecting switching-on apparatus performance and secondary circuit site test method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107179465A (en) * 2017-07-26 2017-09-19 国家电网公司 Extra-high voltage direct-current phase selecting switching-on apparatus performance and secondary circuit site test method

Similar Documents

Publication Publication Date Title
CN103926469B (en) A kind of method of testing of isolated neutral system capacitance current
CN205103361U (en) High voltage electric energy metering device detector of working a telephone switchboard
CN202548258U (en) Device for checking alternating current/voltage loop
CN103777077A (en) Wireless pincerlike phase detection device
CN105277838A (en) Device for checking high-voltage electric energy metering device wiring
CN205003236U (en) Inspect device of high -pressure energy metering equipment wiring
CN204177954U (en) A kind of 35kV global error of high voltage energy metering installation verification system
CN209432939U (en) A kind of high-power transformer second protection polarity test device
CN104698335A (en) Method for debugging high-voltage transformer substation in systematization mode by using low tension electricity
CN206387863U (en) A kind of intelligent electric energy meter transformer detection means
CN205450243U (en) Fault indicator coil tester
CN104183379A (en) Connecting device for maintenance of secondary side of electric power current transformer
CN204228876U (en) Ground detection device
CN203800813U (en) Portable multifunctional test power source device
CN204758644U (en) Experimental quick termination of zero magnetic flow current transformer
CN207882332U (en) system for detecting transformer iron core grounding current
CN203057004U (en) Power supply converter capable of raising electric product power factor
CN201673778U (en) Multifunctional testing transformer
CN205404678U (en) Anti -electricity -theft device of high voltage electricity line
CN105225816A (en) A kind of current transformer with high voltage standard capacitor function
CN104360216A (en) Grounding detecting device and method
CN204595045U (en) A kind of high voltage customer high and low pressure metering system simultaneously
CN103466394B (en) A kind of megger reel
CN204166037U (en) High-voltage meter
CN216718515U (en) Special transformer for oil well with high-voltage metering function

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127