CN204754219U - Hole centre form specialty fixing tool in hole - Google Patents

Hole centre form specialty fixing tool in hole Download PDF

Info

Publication number
CN204754219U
CN204754219U CN201520443712.0U CN201520443712U CN204754219U CN 204754219 U CN204754219 U CN 204754219U CN 201520443712 U CN201520443712 U CN 201520443712U CN 204754219 U CN204754219 U CN 204754219U
Authority
CN
China
Prior art keywords
hole
square steel
internal mold
round
round steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520443712.0U
Other languages
Chinese (zh)
Inventor
张海堂
李盛
靳亚北
代先明
马浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Shanghai Baoye Group Nanjing Construction Co Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Shanghai Baoye Group Nanjing Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd, Shanghai Baoye Group Nanjing Construction Co Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201520443712.0U priority Critical patent/CN204754219U/en
Application granted granted Critical
Publication of CN204754219U publication Critical patent/CN204754219U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The utility model discloses a fixed specialized tool of hole centre form in the hole, including square steel, round steel dead lever, fastening nut and bolt, every end of square steel is equipped with two at least round holes, and the top of hole centre form sets up at least by four in the hole the closed frame that the square steel encloses, adjacent two insert through the bolt square steel junction the round hole is connected fixedly, the one end of round steel dead lever is equipped with the screw thread, and the other end is equipped with 180 crotches, the crotch end of round steel dead lever is arranged in hole bottom in the hole to live the bottom reinforcing bar with the crotch end hook, the screw thread end of round steel dead lever passes the round hole of square steel tip to with the fixed locking of fastening nut. The utility model discloses an instrument simple manufacture, it is easy and simple to handle, the site operation of being convenient for, it is efficient, effectual, and can have enough to meet the need the use many times, use new instrument, when guaranteeing centre form construction one shot forming, guaranteed safety, and effectively practiced thrift the cost, and fixing tool can use resources are saved, green repeatedly.

Description

Internal mold specialty setting tool is cheated in a kind of hole
Technical field
The utility model relates to a kind of formwork aid, cheats internal mold specialty setting tool specifically, belong to building operations equipment technology field in a kind of hole.
Background technology
In building operations, in several monomer B1 base plates, be provided with collecting well and elevator shaft etc., namely produce the working procedure such as reinforcing bar binding, formwork erection in hole in hole.Because hole is (as elevator shaft in general hole, collecting well) size all larger, darker, cheat after internal mold installs in so large hole, in concreting process, the buoyancy produced is quite large, long × wide × high with 2000 × 2000 × 2000() collecting well checking computations, buoyancy can reach 80KN, and the reinforcing bar binding in hole is not difficult point in hole, difficult point is the fixing of the internal mold in hole in hole, cheat in hole in the construction of internal mold concrete placings and easily occur " covering mould ", not only quality problems are produced after internal mold topples, difficulty of construction of doing over again again is also larger, General Requirements is stopped internal mold and to be toppled the generation of event.
At present, cheat in the engineering of construction in this type of hole, the way that each building site routine adopts has: 1, on internal mold, pile pressuring template or steel plate, the method is very unreliable, and due to internal mold buoyancy large, at internal mold top die plate, template piling height is higher, in casting process, buoyancy adds that concreting process is vibrated, and the template very easily producing accumulation is toppled together along with internal mold, easily security incident and quality accident occurs; Adopt steel plate to push down internal mold, steel plate area is large, and weight is large, topples also can produce security incident and quality accident with internal mold.2, pass internal mold upper surface with reinforcing bar, just connect with surface layer and welded, pushed down internal mold; The method construct, surfacing steel bar can along with toppling of internal mold on pull out, produce float distortion, and in the method actual mechanical process, the vertical direction of internal mold regulates cannot be implemented, and difficulty of construction is large, size Control difficulty is large, and needs reinforcement welding, cutting, wasting manpower and material resources.
Utility model content
Technical problem to be solved in the utility model is, for the shortcoming of above prior art, propose to cheat internal mold specialty setting tool in a kind of hole, making to cheat in hole concreting can one-shot forming, and repeatedly can have enough to meet the need use, ensure that in hole that cheat construction quality ensure that safety simultaneously.
In order to solve the problems of the technologies described above, the technical solution of the utility model is achieved in the following ways: provide in a kind of hole and cheat internal mold specialty setting tool, comprise square steel, round steel fixed bar, clamp nut and latch, the often end of described square steel is provided with at least two circular holes, the top of cheating internal mold in hole arranges the closure frame at least surrounded by four described square steel, and adjacent two described square steel junctions are inserted described circular hole by latch and are connected and fixed; One end of described round steel fixed bar is provided with screw thread, the other end is provided with 180 ° of crotches, and the crotch end of described round steel fixed bar is placed in bottom, hole, described hole, and crotch end hook is lived bottom reinforcement bars, the screw thread end of described round steel fixed bar passes the circular hole of square steel end, and uses clamp nut fixing and locking.
Further restriction technical scheme of the present utility model, cheats internal mold in aforesaid hole and fixes special tool, and the often end of described square steel is provided with the circular hole of four Φ 20mm, and distance 160-170mm place, square steel top is arranged, and pitch of holes is 180-200mm.
Cheat internal mold in aforesaid hole and fix special tool, described clamp nut is double nut structure.
Further, cheat internal mold and fix special tool in aforesaid hole, described round steel fixed bar is provided with eight altogether, is respectively provided with a round steel fixed bar at each square steel two ends.
The beneficial effects of the utility model are: tool making of the present utility model is simple, and easy and simple to handle, be convenient to site operation, efficiency is high, effective, and repeatedly can have enough to meet the need use; Abandon traditional laminating by template or the way of reinforcement welding compacting, traditional method is lack of standardization, and quality not easily ensures, easily security incident occurs; Use new tool, guaranteeing that internal mold construction is one-time formed while, ensure that safety, and effectively cost-saving, and setting tool can Reusability, economizes on resources, environmental protection; This tool belt bolt drag hook; together with bottom is hooked in bottom layer of the reinforcing steel; top is fastened by bolts, can the vertical direction size of vertical adjustment internal mold, guarantees that square steel compresses internal mold; internal mold fixation is reliable; when building, buoyancy is also unlikely to topple internal mold, and this instrument improves efficiency of construction greatly; and ensure that internal mold concreting one-shot forming, avoid doing over again.
Accompanying drawing explanation
Fig. 1 is plane structure schematic diagram of the present utility model.
Fig. 2 is facade structures schematic diagram of the present utility model.
Detailed description of the invention
Below the utility model is described in further detail:
embodiment 1
Cheat internal mold in the one hole that the present embodiment provides and fix special tool, structure as depicted in figs. 1 and 2, comprise square steel 1, round steel fixed bar 2, clamp nut 3 and latch 4, the often end of square steel is provided with the circular hole of four Φ 20mm, distance 165mm place, square steel top is arranged, pitch of holes is 200mm, and the top of cheating internal mold in hole arranges the closure frame surrounded by four square steel, and adjacent two square steel junctions are inserted circular hole by latch and are connected and fixed; One end of round steel fixed bar is provided with screw thread, the other end is provided with 180 ° of crotches, the crotch end of round steel fixed bar is placed in bottom, hole, hole, and crotch end hook is lived bottom reinforcement bars 5, the screw thread end of round steel fixed bar passes the circular hole of square steel end, round steel fixed bar is provided with eight altogether, is respectively provided with a round steel fixed bar at each square steel two ends, and with clamp nut 3 fixing and locking of double nut structure.
The present embodiment in use, after putting into internal mold in hole in hole, the first step, first gets 50 × 50 square steel two, laterally push down internal mold 7 top, other two 50 × 50 square steel, are longitudinally pressed on horizontal square steel, in length and breadth to square steel junction, for the circular hole of Φ 20mm, penetrate the long 100mm latch of Φ 20 and fix square steel position, four square steel are connected into closure frame, prevents square steel from indulging transverse shifting.Second step, pierce into Φ 20 round steel fixed bar at every root square steel apart from the Φ 20mm circular hole at 165mm place, end, 180 °, fixed bar bottom crotch hooks bottom reinforcement bars, and round steel fixed bar top is stubborn M20 double nut just.3rd step, internal mold adjustment, leveling, after adjustment, start symmetrical fastening M20 nut, until the requirement of internal mold size conforms formwork.
Above embodiment is only and technological thought of the present utility model is described; protection domain of the present utility model can not be limited with this; every technological thought according to the utility model proposes, any change that technical scheme basis is done, all falls within the utility model protection domain.

Claims (4)

1. cheat internal mold specialty setting tool in a hole, comprise square steel, round steel fixed bar, clamp nut and latch, it is characterized in that: the often end of described square steel is provided with at least two circular holes, the top of cheating internal mold in hole arranges the closure frame at least surrounded by four described square steel, and adjacent two described square steel junctions are inserted described circular hole by latch and are connected and fixed; One end of described round steel fixed bar is provided with screw thread, the other end is provided with 180 ° of crotches, and the crotch end of described round steel fixed bar is placed in bottom, hole, described hole, and crotch end hook is lived bottom reinforcement bars, the screw thread end of described round steel fixed bar passes the circular hole of square steel end, and uses clamp nut fixing and locking.
2. cheat internal mold specialty setting tool in hole according to claim 1, it is characterized in that: the often end of described square steel is provided with the circular hole of four Φ 20mm, and distance 160-170mm place, square steel top is arranged, and pitch of holes is 180-200mm.
3. cheat internal mold specialty setting tool in hole according to claim 1, it is characterized in that: described clamp nut is double nut structure.
4. cheat internal mold specialty setting tool in hole according to claim 1, it is characterized in that: described round steel fixed bar is provided with eight altogether, be respectively provided with a round steel fixed bar at each square steel two ends.
CN201520443712.0U 2015-06-25 2015-06-25 Hole centre form specialty fixing tool in hole Expired - Fee Related CN204754219U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520443712.0U CN204754219U (en) 2015-06-25 2015-06-25 Hole centre form specialty fixing tool in hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520443712.0U CN204754219U (en) 2015-06-25 2015-06-25 Hole centre form specialty fixing tool in hole

Publications (1)

Publication Number Publication Date
CN204754219U true CN204754219U (en) 2015-11-11

Family

ID=54468942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520443712.0U Expired - Fee Related CN204754219U (en) 2015-06-25 2015-06-25 Hole centre form specialty fixing tool in hole

Country Status (1)

Country Link
CN (1) CN204754219U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759415A (en) * 2017-03-14 2017-05-31 中国十七冶集团有限公司 A kind of concrete structure catch pit template anti-floating control technology
CN107313588A (en) * 2017-08-30 2017-11-03 云南工程建设总承包公司 Catch pit bottom plate tool-typed formwork and its construction usage method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759415A (en) * 2017-03-14 2017-05-31 中国十七冶集团有限公司 A kind of concrete structure catch pit template anti-floating control technology
CN107313588A (en) * 2017-08-30 2017-11-03 云南工程建设总承包公司 Catch pit bottom plate tool-typed formwork and its construction usage method

Similar Documents

Publication Publication Date Title
CN106400799B (en) A kind of cast-in-place dado structure and construction method for artificial digging pile
CN108457421B (en) Manufacturing die and manufacturing method of assembled reinforced concrete U-shaped frame beam
CN109267584A (en) Assembly concrete prismoid shaped basis and column steel connection structure and assembly method
CN204754219U (en) Hole centre form specialty fixing tool in hole
CN105672690B (en) Load bearing wall reinforcing method
CN104972550B (en) The polygonal mould and preparation method of a kind of in-situ precast concrete-pile
CN106930436B (en) Reinforced concrete shear wall with built-in prestressed steel diagonal bracing
CN208473072U (en) A kind of damping assembly concrete building cover structure
CN205954675U (en) Prefabricated pipeline concrete buttress
CN209227581U (en) Assembly concrete prismoid shaped basis and column steel connection structure
CN215241609U (en) Height-adjustable combined template for manufacturing precast beam laying gap
CN206319319U (en) Steel pipe Larsen steel plate combination fender post constructing structure
CN209227579U (en) Assembled prismoid shaped basis and rod structure
CN106426542B (en) The U-shaped beam of rail traffic large-tonnage pretensioning prestressed concrete and its stretching bed seat
CN205712715U (en) A kind of low-rise building lattice heat insulation prefabricated board member
CN213234008U (en) Improved rib frame stud stirrup structure
CN211143496U (en) Column PC component
CN209397926U (en) A kind of elevator fence operation platform structure
CN209760505U (en) Tenon welding combined horizontal connection shear wall structure
CN206707004U (en) Assembled architecture dry type bean column node
CN110965769A (en) Building floor bathroom falls board construction template device in building
CN104859365A (en) Manufacturing method for cylindrical hillstone landscape
CN216810000U (en) Auxiliary rebar tying device for vertical steel bars of inspection well
CN109441115A (en) A kind of elevator fence operation platform structure and construction method
CN205576905U (en) Prestressing force mixes earth tubular pile end plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151111