CN204748468U - Appurtenance is changed to old acting as go -between - Google Patents

Appurtenance is changed to old acting as go -between Download PDF

Info

Publication number
CN204748468U
CN204748468U CN201520143137.2U CN201520143137U CN204748468U CN 204748468 U CN204748468 U CN 204748468U CN 201520143137 U CN201520143137 U CN 201520143137U CN 204748468 U CN204748468 U CN 204748468U
Authority
CN
China
Prior art keywords
rod
pull
old
bracing wire
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520143137.2U
Other languages
Chinese (zh)
Inventor
李辉
邹燕辉
廖云峰
饶志勇
蒋根珠
周成华
王利强
蒋少青
何武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Jiangxi Xin'gan Power Supply Co Ltd
State Grid Corp of China SGCC
State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Jiangxi Xin'gan Power Supply Co Ltd
State Grid Corp of China SGCC
State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Jiangxi Xin'gan Power Supply Co Ltd, State Grid Corp of China SGCC, State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Jiangxi Xin'gan Power Supply Co Ltd
Priority to CN201520143137.2U priority Critical patent/CN204748468U/en
Application granted granted Critical
Publication of CN204748468U publication Critical patent/CN204748468U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model belongs to electric power engineering construction multiplexer utensil field, the utility model relates to an appurtenance is changed to old acting as go -between, including pull -rod and 2 steel checkpost connecting pieces, the pull -rod with 2 steel checkpost connecting piece links together through the welded mode, and welding position does steel checkpost connecting piece of lower part 20 - 30cm of every welding of pull -rod. Pull -rod, steel checkpost connecting piece are made by metal material zinc -plating. The utility model has the characteristics of change short, efficient, easy operation of the old time of acting as go -between, and portable etc.

Description

Aid is changed in a kind of old bracing wire
Technical field
The utility model belongs to Phase of Electric Power Projects Work tool field.
Background technology
Often old bracing wire will be changed in engineering overhaul technological transformation and emergency first-aid repair process, Xingan County ABUNDANT NATUREAL RESOURSES, have the laudatory title of " silo, tangerine township, vast stretch of wooded country, salt pan, medicine city, bronze kingdom ", salt ore reserves 2,300,000,000 tons, easily corrode in salinization enterprise and the bracing wire of chemical industry soup factory area, in order to ensure to change this operation of old bracing wire safely and fast, we make the instrument that a kind of old bracing wire is changed, and are mainly used in the old bracing wire of power engineering construction and change.
The instrument that existing old bracing wire is changed adopts angle bar stake usually, and it is made up of angle bar stake and steel strand wires, and the mode usually having done lasso trick with steel strand wires is connected with angle bar stake to be applied.In the old bracing wire process of replacing, need the angle bar stake of 1.7 meters to lay nearly 1 meter of oblique degree of depth, and change the old bracing wire time long, there is security risk and efficiency is low, along with more and more higher to electrical power demand, traditional interim angle bar stake can not meet the requirement of operation.
Therefore, be badly in need of that a kind of safety coefficient is high and replacing construction is short and aid is changed in the old bracing wire changing old bracing wire efficiency high.
Utility model content
(1) technical problem that will solve
The purpose of this utility model is to provide a kind of old bracing wire and changes aid, and to overcome existing interim angle bar stake, to change the bracing wire time long, and efficiency is low and there is the problem of the complicated operations such as potential safety hazard.
(2) technical scheme
In order to solve the problems of the technologies described above, the utility model provides a kind of old bracing wire and changes aid, comprise pull-rod and 2 steel clamp connectors, described pull-rod is linked together by the mode of welding with described 2 steel clamp connectors, and welding position is that a steel clamp connector is welded every 20-30cm in the bottom of described pull-rod.Described pull-rod, steel clamp connector are made by metal material is zinc-plated.
Operation process is: link together by using steel strand wires, a Lever Blocks turnbuckle and bracing wire aid, steel strand wires one end is fixed on electric pole, the other end is connected with bracing wire aid by Lever Blocks turnbuckle, Lever Blocks turnbuckle is provided with self-locking mechanism, the bracing wire aid other end is fixed on former pull-rod, by regulating Lever Blocks turnbuckle to control temporary guy elasticity, changing new bracing wire after pulling down old bracing wire, then temporary guy being removed.
(3) beneficial effect
Aid is changed in the old bracing wire that technique scheme provides, and by adopting the rotary buckle in the middle of old pull-rod and steel clamp, such that the time of building is short, to build efficiency high, simple to operate, and is convenient to transport and carries.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present utility model;
Fig. 2 is the utility model schematic diagram in the mounted state;
Fig. 3 is the schematic diagram of the utility model under utilization state.
Wherein, 1-pull-rod; 2-steel clamp connector; 3-Lever Blocks turnbuckle connector; The bracing wire of 4-temporary steel strand; The former distaff of 5-.
Detailed description of the invention
Below in conjunction with drawings and Examples, detailed description of the invention of the present utility model is described in further detail.Following examples for illustration of the utility model, but are not used for limiting scope of the present utility model.
As shown in Fig. 1 ~ Fig. 3, according to this embodiment, this old bracing wire is changed aid and is comprised pull-rod and 2 steel clamp connectors, described pull-rod is linked together by the mode of welding with described 2 steel clamp connectors, and welding position is that a steel clamp connector is welded every 20-30cm in the bottom of described pull-rod.Pull-rod and steel clamp connector are welded on non-tail end, form an aid supported.One end is fixed by 2 steel clamps and former pull-rod specifically, and one end is connected with turnbuckle in addition, and turnbuckle is connected with temporary guy again, and temporary guy is connected with concrete electric pole.Make temporary guy elasticity same with former bracing wire by adjustment turnbuckle, afterwards old bracing wire is removed, the bracing wire more renewed.
In addition, due to make this aid be adopt metal material make, in order to make old bracing wire change the feature that aid not easily gets rusty, intensity is high, and to pull-rod and steel clamp time-based maintenance brushing galvanizing paint.
The above is only a kind of preferred embodiment of the present utility model; it should be pointed out that for the art, under the prerequisite not departing from the utility model know-why; can also make some improvement and modification, these improve and modification also should be considered as protection domain of the present utility model.

Claims (2)

1. aid is changed in an old bracing wire, it is characterized in that, comprise pull-rod and 2 steel clamp connectors, described pull-rod is linked together by the mode of welding with described 2 steel clamp connectors, and welding position is that a steel clamp connector is welded every 20-30cm in the bottom of described pull-rod.
2. aid is changed in old bracing wire as claimed in claim 1, and it is characterized in that, described pull-rod, steel clamp connector are made by metal material is zinc-plated.
CN201520143137.2U 2015-03-13 2015-03-13 Appurtenance is changed to old acting as go -between Expired - Fee Related CN204748468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520143137.2U CN204748468U (en) 2015-03-13 2015-03-13 Appurtenance is changed to old acting as go -between

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520143137.2U CN204748468U (en) 2015-03-13 2015-03-13 Appurtenance is changed to old acting as go -between

Publications (1)

Publication Number Publication Date
CN204748468U true CN204748468U (en) 2015-11-11

Family

ID=54463221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520143137.2U Expired - Fee Related CN204748468U (en) 2015-03-13 2015-03-13 Appurtenance is changed to old acting as go -between

Country Status (1)

Country Link
CN (1) CN204748468U (en)

Similar Documents

Publication Publication Date Title
CN202474702U (en) Platform mounting support for live operation of power distribution line
CN208939464U (en) A kind of distribution network live line work electrification assembly and disassembly parallel groove clamp specific purpose tool
CN203367865U (en) Auxiliary bracket for maintaining power transmission line
CN204343460U (en) Buried flood control baffle plate
CN202730656U (en) Double-beam-clamp triangular bracket for construction of highway bridge single-column pier bent cap
CN204748468U (en) Appurtenance is changed to old acting as go -between
CN209488052U (en) An a kind of transmission line of electricity leap point block device
CN103822026A (en) Mine self-rooting cable hook device
CN105305106A (en) Anti-theft grounding electrode for ground wire, and telegraph pole
CN204200239U (en) A kind of equipment of slagging tap for small section tunnel
CN204068036U (en) A kind of novel 220kV live line working pin removal
CN204385786U (en) Multi-functional prestressed concrete pipe pile antibending shear resistance system
CN201507142U (en) Stabilizing device of high-voltage telegraph pole
CN206559017U (en) A kind of lighting proof strip
CN206800975U (en) A kind of foot guard plate of scaffold sets up system
CN205992710U (en) A kind of cable arrange-line pay off rack
CN204552172U (en) Assembly type is encorbelmented interim processing plant
CN204267876U (en) Distribution wire enters ground cable steel tube shroud ring structure
CN202970096U (en) Transmission line iron tower
CN204614975U (en) A kind of lightning protection downlead
CN204590421U (en) A kind of construction work rebar fixing device
CN204491400U (en) A kind of mountain type beam lightning protection structure continuously
CN208832044U (en) A kind of construction site Portable support
CN203430051U (en) Automatic concrete pouring device used for building construction
CN204185155U (en) A kind of masts type hanging apparatus lifting kiln heat recovery boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151111

Termination date: 20170313

CF01 Termination of patent right due to non-payment of annual fee