CN204738737U - Insulating step of ladder - Google Patents

Insulating step of ladder Download PDF

Info

Publication number
CN204738737U
CN204738737U CN201520503511.5U CN201520503511U CN204738737U CN 204738737 U CN204738737 U CN 204738737U CN 201520503511 U CN201520503511 U CN 201520503511U CN 204738737 U CN204738737 U CN 204738737U
Authority
CN
China
Prior art keywords
arc hoop
hoop plate
pedestal
arc
cross bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520503511.5U
Other languages
Chinese (zh)
Inventor
郑宏伟
缪寿成
方玉群
孔晓峰
梁加凯
俞晓辉
潜力群
王斌
蒋其武
蒋卫东
李炯
柳浩�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520503511.5U priority Critical patent/CN204738737U/en
Application granted granted Critical
Publication of CN204738737U publication Critical patent/CN204738737U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides an insulating step of ladder aims at solving when two strings of insulator intervals exceed 60cm among the prior art, and the staff passes in and out the problem of equipotential difficulty, including two wire jumpers with set up the insulating horizontal pole between two wire jumpers, every eradication has all linked firmly the mount pad in both ends on along the horizontal pole, all including fixing the pedestal on insulating horizontal pole, first arc hoop board, second arc hoop board and removable fastener, the setting of first arc hoop board is on the pedestal for every mount pad, second arc hoop board is transferred on the pedestal, first arc binds round board and second arc and binds round the board and hold tightly on the wire jumper through removable fastener. Adopt the utility model discloses the climbing is convenient, has reduced staff's risk and intensity of labour, the staff need not be along two strings of insulators, according to " striding two short three " technical requirement's " the synchronous lateral shifting of trick ", have solved when two strings of insulator intervals exceed 60cm among the prior art, and the staff passes in and out the problem of equipotential difficulty.

Description

A kind of insulation step ladder
Technical field
The utility model relates to a kind of field of climbing shaft tower, particularly relates to a kind of insulation step ladder.
Background technology
In recent years, China's extra high voltage line is developed rapidly, electrical network scale expanding day.Because transmission capacity is huge, its operational reliability requires high, and having a power failure, it is very difficult to safeguard, often needs equipotential live line work carry out defect elimination or install online watch-dog.Due to the particularity of extra high voltage line shaft tower and each part design, equipotential live line work is made to face many technical barriers.
Usually, livewire work is correlated with code, directive/guide regulation: power line tension shaft tower turnover equipotential mode is " short by three across two " method (for take insulative air gap as small as possible, hand and pin stride across two panels insulator, short circuit three insulators).Practical experience shows, when when between two insulator strings, horizontal range is more than 60cm, the spacing of operating personnel's hand, pin is excessive, cannot according to " trick synchronous horizontal moves " of " short by three across two " technical requirements, operating risk and labour intensity very big.Data show, extra high voltage line strain insulator two insulator string horizontal range is all greater than 60cm, and be positioned at heavy icing area overhead line structures, this distance reaches 100cm especially, and " short by three across two " method cannot be adopted to pass in and out equipotential.
Utility model content
The utility model provides a kind of insulation step ladder, and be intended to solve when in prior art, two insulator string spacing are more than 60cm, staff passes in and out the problem of equipotential difficulty.
In order to solve above technical problem, the utility model is achieved through the following technical solutions: a kind of insulation step ladder, the insulation cross bar comprising two wire jumpers and be arranged between two wire jumpers, often thoroughly do away with two ends on edge cross bar and be all fixed with mount pad, each mount pad includes the pedestal, the first arc hoop plate, the second arc hoop plate and the detachable fastener that are fixed on insulation cross bar, first arc hoop plate is arranged on pedestal, second arc hoop plate switching is on pedestal, and the first arc hoop plate and the second arc hoop plate are held tightly on wire jumper by detachable fastener.
Further, described first arc hoop plate is provided with the first mounting ear, and the first mounting ear is provided with half slot, and the second arc hoop plate is provided with the second mounting ear; Detachable fastener is made up of secondary stepped stem and handle, and secondary stepped stem is made up of minor diameter part and large-diameter portion, and minor diameter part diameter is identical with half slot width size, and minor diameter part is by screw thread switching on the second mounting ear, and handle is fixed on large-diameter portion.Be convenient to the installation and removal of detachable fastener.
Further, described first arc hoop plate is fixed on pedestal, or the first arc hoop plate and pedestal are wholely set, or the switching of the first arc hoop plate is on pedestal.
Further, described insulation cross bar is hollow section.Alleviate the weight of insulation cross bar, decrease labour intensity.
Further, described insulation cross bar is expansion link.Be convenient to the length of the spacing adjustment insulation cross bar according to two wire jumpers.
Further, rubber pad is equipped with on each first arc hoop plate inside wall He on each second arc hoop plate inside wall.Be conducive to reducing the wearing and tearing to wire jumper.
Compared with prior art the utility model has the advantages that: in the utility model, some eradication edge cross bars are arranged on two bar lines by detachable fastener and form step ladder, be arranged on wire jumper by a section for insulation cross bar in the process of swashing towards equipotential, when getting off, a section cross bar to be disassembled; Climbing is convenient, reduces risk and the labour intensity of staff; Staff does not need along two insulator strings, and according to " trick synchronous horizontal moves " of " short by three across two " technical requirements, when solving that in prior art, two insulator string spacing are more than 60cm, staff passes in and out the problem of equipotential difficulty.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail:
Fig. 1 is the structural representation of cross bar and mount pad in the utility model;
Fig. 2 is structural representation of the present utility model;
Fig. 3 is the location diagram of the utility model and shaft tower.
Detailed description of the invention
Consult Fig. 1 and Fig. 2, a kind of insulation step ladder, the insulation cross bar 2 comprising two wire jumpers 1 and be arranged between two wire jumpers 1, often thoroughly do away with two ends on edge cross bar 2 and be all fixed with mount pad 3, each mount pad 3 include be fixed on insulation cross bar 2 on pedestal 4, first arc hoop plate 5, second arc hoop plate 6 and detachable fastener 7, first arc hoop plate 5 is arranged on pedestal 4, second arc hoop plate 6 is transferred on pedestal 4, and the first arc hoop plate 5 and the second arc hoop plate 6 are held tightly on wire jumper 1 by detachable fastener 7.Described first arc hoop plate 5 is provided with the first mounting ear 8, first mounting ear 8 and is provided with half slot 81, and the second arc hoop plate 6 is provided with the second mounting ear 9; Detachable fastener 7 is made up of secondary stepped stem 10 and handle 11, secondary stepped stem 10 is made up of minor diameter part and large-diameter portion, minor diameter part diameter is identical with half slot 81 width size, and minor diameter part is by screw thread switching on the second mounting ear 9, and handle 11 is fixed on large-diameter portion.Described first arc hoop plate 5 is fixed on pedestal 4, or the first arc hoop plate 5 is wholely set with pedestal 4, or the first arc hoop plate 5 is transferred on pedestal 4.Described insulation cross bar 2 is hollow section.Described insulation cross bar 2 is expansion link.Rubber pad 12 is equipped with on each first arc hoop plate 5 inside wall He on each second arc hoop plate 6 inside wall.
During work, when mount pad 3 is arranged on wire jumper 1, first by the first arc hoop plate 5 and the second arc hoop plate 6 armfuls on wire jumper 1, the minor diameter part of secondary stepped stem 10 is connected in half slot 81 simultaneously, by rotary handle 11, first mounting ear 8 and the second mounting ear 9 are drawn close gradually, the large-diameter portion of secondary stepped stem 10 is limited on the first mounting ear 8, thus mount pad 3 is arranged on wire jumper 1.
Consult Fig. 2 and Fig. 3, when swashing, staff 01 carries insulation cross bar 2, often to climb a height along wire jumper 1, thoroughly doing away with edge cross bar 2 by one is fixed between two wire jumpers 1 by mount pad 3, then step on mounted insulation cross bar 2 above, next insulation cross bar 2 is installed, knows and climb to equipotential.
When staff 01 returns, staff often declines a height, pulls down an eradication edge cross bar, until drop to hard wire jumper 03.
Consult Fig. 3, hard wire jumper 03 is suspended on shaft tower 04 by jumper suspension insulator string 02, strain insulator string 05 is suspended on wire 06 (generally by 6 to 8, in order to map conveniently, only depict 2) and shaft tower 04 between, wire jumper 1 (refers to flexible jumper, general by 6 to 8, the utility model for convenience of explanation, only depicts carrying insulation 2 of cross bar 2) be arranged between hard wire jumper 03 and wire 06, staff 01 to crawl toward wire jumper 1 from hard wire jumper 03.
In the utility model, some eradication edge cross bars are arranged on two bar lines by detachable fastener and form step ladder, being arranged on wire jumper, when getting off, a sectionly being disassembled by cross bar in the process of swashing towards equipotential by a section for insulation cross bar; Climbing is convenient, reduces risk and the labour intensity of staff; Staff does not need along two insulator strings, and according to " trick synchronous horizontal moves " of " short by three across two " technical requirements, when solving that in prior art, two insulator string spacing are more than 60cm, staff passes in and out the problem of equipotential difficulty.
The foregoing is only specific embodiment of the utility model, but technical characteristic of the present utility model is not limited thereto, any those skilled in the art is in field of the present utility model, and the change done or modification are all encompassed among the scope of the claims of the present utility model.

Claims (6)

1. an insulation step ladder, it is characterized in that: the insulation cross bar (2) comprising two wire jumpers (1) and be arranged between two wire jumpers, often thoroughly do away with two ends on edge cross bar and be all fixed with mount pad (3), each mount pad includes the pedestal (4), the first arc hoop plate (5), the second arc hoop plate (6) and the detachable fastener (7) that are fixed on insulation cross bar, first arc hoop plate is arranged on pedestal, second arc hoop plate switching is on pedestal, and the first arc hoop plate and the second arc hoop plate are held tightly on wire jumper by detachable fastener.
2. one insulation step ladder according to claim 1, it is characterized in that: described first arc hoop plate is provided with the first mounting ear (8), first mounting ear is provided with half slot (81), and the second arc hoop plate is provided with the second mounting ear (9); Detachable fastener is made up of secondary stepped stem (10) and handle (11), secondary stepped stem is made up of minor diameter part and large-diameter portion, minor diameter part diameter is identical with half slot width size, minor diameter part is by screw thread switching on the second mounting ear, and handle is fixed on large-diameter portion.
3. one insulation step ladder according to claim 1, it is characterized in that: described first arc hoop plate is fixed on pedestal, or the first arc hoop plate and pedestal are wholely set, or the first arc hoop plate is transferred on pedestal.
4. one insulation step ladder according to claim 1, is characterized in that: described insulation cross bar is hollow section.
5. one insulation step ladder according to claim 1, is characterized in that: described insulation cross bar is expansion link.
6. one insulation step ladder according to claim 1, is characterized in that: be equipped with rubber pad (12) on each first arc hoop plate inside wall He on each second arc hoop plate inside wall.
CN201520503511.5U 2015-07-10 2015-07-10 Insulating step of ladder Expired - Fee Related CN204738737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520503511.5U CN204738737U (en) 2015-07-10 2015-07-10 Insulating step of ladder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520503511.5U CN204738737U (en) 2015-07-10 2015-07-10 Insulating step of ladder

Publications (1)

Publication Number Publication Date
CN204738737U true CN204738737U (en) 2015-11-04

Family

ID=54420478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520503511.5U Expired - Fee Related CN204738737U (en) 2015-07-10 2015-07-10 Insulating step of ladder

Country Status (1)

Country Link
CN (1) CN204738737U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019820A (en) * 2015-07-10 2015-11-04 国网浙江省电力公司金华供电公司 Insulation step ladder
CN107681538A (en) * 2017-09-12 2018-02-09 金华送变电工程有限公司 Anti- operating personnel turns over the aid fallen on a kind of transmission of electricity strain rod tower insulator chain
KR101851581B1 (en) * 2015-12-10 2018-04-24 주식회사 이엠텍 Apparatus for fixing foot plate of rope ladder

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019820A (en) * 2015-07-10 2015-11-04 国网浙江省电力公司金华供电公司 Insulation step ladder
CN105019820B (en) * 2015-07-10 2016-10-05 国网浙江省电力公司金华供电公司 A kind of insulation step ladder
KR101851581B1 (en) * 2015-12-10 2018-04-24 주식회사 이엠텍 Apparatus for fixing foot plate of rope ladder
CN107681538A (en) * 2017-09-12 2018-02-09 金华送变电工程有限公司 Anti- operating personnel turns over the aid fallen on a kind of transmission of electricity strain rod tower insulator chain

Similar Documents

Publication Publication Date Title
CN204738737U (en) Insulating step of ladder
CN104505766B (en) The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings
CN107994527A (en) A kind of high tension electric tower wire insulation buffer unit
CN105375391B (en) Automatic-lifting type insulation temporary cross arm
CN208078525U (en) Three-phase conducting wire for distribution network live line work upright bar struts insulating frame
CN105914655A (en) Auxiliary tool and method for replacing rod insulator in electrified manner
CN207988628U (en) A kind of Great span landform is convenient for the 10kV broad-base tower equipment of cable or more tower
CN208337014U (en) A kind of charged for replacement Voltage for Insulators on HV Lines lifting block hanging point heightening device
CN201904593U (en) Pre-stranded two-bundle spacer
CN105019820A (en) Insulation step ladder
CN102931612A (en) Conducting wire fixer for 10kV live working
CN208015333U (en) A kind of 35kV double cables single pole rod rising device
CN105098694A (en) Overhead lightning line erection method based on typical design of power distribution network
CN204258228U (en) For the fixing gold utensil of line terminal and lead-in wire
CN205212395U (en) Lightning protection protector is synthesized in drainage of strain insulator pole
CN204126354U (en) A kind of high voltage power transmission tower
CN204441800U (en) A kind of 500kV compact line V-type replacing insulator string jig
CN205212327U (en) 110kV -220kV insulator is parallel operation more
CN203883424U (en) Vibration damper of power transmission line
CN204947467U (en) Vertical two elevator
CN104453334A (en) Three-loop iron tower of power transmission line
CN202017374U (en) Expansion-resistant cap for wire pole
CN206135298U (en) Insulator chain anticreep frame
CN205335800U (en) Wire insulated supporting plate device
CN103441443B (en) Device is recovered in aerial earth wire damper positioning

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151104

Termination date: 20200710