CN104505766B - The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings - Google Patents

The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings Download PDF

Info

Publication number
CN104505766B
CN104505766B CN201410722424.9A CN201410722424A CN104505766B CN 104505766 B CN104505766 B CN 104505766B CN 201410722424 A CN201410722424 A CN 201410722424A CN 104505766 B CN104505766 B CN 104505766B
Authority
CN
China
Prior art keywords
insulator
replaced
clamping tool
link plate
single head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410722424.9A
Other languages
Chinese (zh)
Other versions
CN104505766A (en
Inventor
邓科
万文杰
魏秋累
张秋实
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN KEDIAO ELECTRIC POWER TECHNOLOGY Co Ltd
Maintenance Branch of State Grid Hubei Electric Power Co Ltd
State Grid Corp of China
Original Assignee
WUHAN KEDIAO ELECTRIC POWER TECHNOLOGY Co Ltd
Maintenance Branch of State Grid Hubei Electric Power Co Ltd
State Grid Corp of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN KEDIAO ELECTRIC POWER TECHNOLOGY Co Ltd, Maintenance Branch of State Grid Hubei Electric Power Co Ltd, State Grid Corp of China filed Critical WUHAN KEDIAO ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN201410722424.9A priority Critical patent/CN104505766B/en
Publication of CN104505766A publication Critical patent/CN104505766A/en
Application granted granted Critical
Publication of CN104505766B publication Critical patent/CN104505766B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Insulators (AREA)

Abstract

本发明涉及一种带电更换变电站500kV耐张绝缘子串的工具及方法,该工具包括联板卡具、绝缘子上卡、单头丝杆、绝缘滑车、绝缘拉杆;所述联板卡具固定于绝缘子串导线侧联板,所述绝缘子上卡固定于待更换绝缘子串第二片绝缘子上,所述单头丝杆连接联板卡具和绝缘子上卡两侧,所述绝缘滑车位于联板卡具上,所述绝缘拉杆连接联板卡具与架构,所述绝缘拉杆通过抱箍固定于架构。本发明提供的一种带电更换变电站500kV耐张绝缘子串的工具及方法,在带电更换绝缘子作业时不使用托瓶架,通过微过牵引法更换绝缘子串,使得作业过牵引长度由原来的150‑200mm减少到15mm左右,大大减少了收紧线操作的过牵引量,因而大大降低了收紧线时导线施工应力,提高了作业的安全程度。

The present invention relates to a tool and method for live replacement of 500kV strain insulator strings in a substation. The tool includes a connecting plate clamp, an insulator upper clamp, a single-headed screw rod, an insulating pulley, and an insulating pull rod; the connecting plate clamp is fixed on the insulator The side connecting plate of the string wire, the upper clamp of the insulator is fixed on the second insulator of the insulator string to be replaced, the single-headed screw rod connects the connecting clamp and the two sides of the upper clamp of the insulator, and the insulating pulley is located on the connecting clamp Above, the insulating pull rod is connected to the connecting plate fixture and the structure, and the insulating pull rod is fixed to the structure through a hoop. The present invention provides a tool and method for replacing 500kV strain insulator strings in substations with live electricity. When replacing insulators with live electricity, the bottle holder is not used, and the insulator strings are replaced by the micro-overdrawing method, so that the working overdrawn length is changed from the original 150- 200mm is reduced to about 15mm, which greatly reduces the over-drawing of the tightening operation, thus greatly reducing the stress of the conductor construction during tightening, and improving the safety of the operation.

Description

一种带电更换变电站500kV耐张绝缘子串的工具及方法A tool and method for live replacement of 500kV tension insulator strings in substations

技术领域technical field

本发明涉及更换绝缘子串的工具及方法,具体地指一种带电更换变电站500kV耐张绝缘子串的工具及方法。The invention relates to a tool and a method for replacing an insulator string, in particular to a tool and a method for replacing a 500kV tension insulator string in a substation with electricity.

背景技术Background technique

随着500kV超高压输变电系统的建设和发展,500kV电网已经成为全国联网的纽带和动脉,也是区域电网主要骨架,对整个电网的安全稳定运行起着举足轻重的作用。500kV变电站又是500kV系统的连接支配点,从电网安全运行要求以及电网的结构形式多方面来看,变电站带电作业是必须的也是频繁的,其中更换耐张绝缘子串又是经常性的工作。根据现在变电站带电作业情况来看,500kV耐张绝缘子由于其自身较重,其每串重量为300kg,长度为5m左右,导线的收紧张力约为3-5t,因此在变电站带电更换500kV耐张绝缘子串难度非常大。传统方法是使用托瓶架,采用过牵引法牵引长度为150-200mm,在收紧线时施工应力很大,对于水平力和垂直力合为一体的托瓶架结构危险性大,且整套工具较为笨重安装不便。With the construction and development of the 500kV ultra-high voltage power transmission and transformation system, the 500kV power grid has become the link and artery of the national networking, and it is also the main skeleton of the regional power grid, which plays a pivotal role in the safe and stable operation of the entire power grid. The 500kV substation is also the connection dominance point of the 500kV system. From the perspective of the safe operation requirements of the power grid and the structural form of the power grid, live work in the substation is necessary and frequent, and the replacement of the strain insulator string is a regular work. According to the current situation of live work in substations, 500kV tension insulators are heavy, each string weighs 300kg, the length is about 5m, and the tension of the wires is about 3-5t. Insulator strings are very difficult. The traditional method is to use the bottle holder, the traction length is 150-200mm by the over-traction method, the construction stress is very large when the line is tightened, the structure of the bottle holder with the horizontal force and the vertical force is very dangerous, and the whole set of tools More bulky and inconvenient to install.

发明内容Contents of the invention

本发明目的在于克服上述现有技术而提供一种带电更换变电站500kV耐张绝缘子串的工具及方法,以解决更换变电站500kV耐张绝缘子串带电作业困难的难题。The purpose of the present invention is to overcome the above-mentioned prior art and provide a tool and method for live replacement of 500kV tension insulator strings in substations, so as to solve the difficult problem of live operation for replacing 500kV tension insulator strings in substations.

实现本发明目的采用的技术方案是一种带电更换变电站500kV耐张绝缘子串的工具,该工具包括联板卡具、绝缘子上卡、单头丝杆、绝缘滑车、绝缘拉杆,所述联板卡具固定于绝缘子串导线侧联板,绝缘子上卡固定于待更换绝缘子串的第二片绝缘子上,单头丝杆设置在联板卡具和绝缘子上卡的两侧,绝缘滑车设于联板卡具上;绝缘拉杆的一端通过抱箍固定于架构上,另一端与联板卡具连接。The technical solution adopted to realize the purpose of the present invention is a tool for replacing 500kV strain insulator strings in substations with electricity. The tool is fixed on the side connecting plate of the insulator string wire, the upper clamp of the insulator is fixed on the second insulator of the insulator string to be replaced, the single-headed screw rod is set on both sides of the clamping fixture and the upper clamp of the insulator, and the insulating pulley is set on the connecting plate On the clamp; one end of the insulating tie rod is fixed on the structure through a hoop, and the other end is connected to the connecting plate clamp.

此外,本发明还提供一种使用所述工具进行绝缘子串更换方法,该方法包括以下步骤:In addition, the present invention also provides a method for replacing an insulator string using the tool, the method includes the following steps:

S100、安装卡具:等电位电工吊上联板卡具、绝缘拉杆、单头丝杆、绝缘子上卡、绝缘滑车工具,在待更换绝缘子串两端安装好;S100. Installation clamps: the equipotential electrician hangs up the connecting plate clamps, insulating pull rods, single-headed screw rods, insulator clamps, and insulating pulley tools, and installs them at both ends of the insulator string to be replaced;

S200、安装绝缘滑车,将绝缘吊绳穿过联板卡具上的绝缘滑车系在更换绝缘子串的第三片绝缘子上;S200. Install the insulating block, and tie the insulating sling through the insulating block on the connecting plate clamp to the third insulator of the replacement insulator string;

S300、收紧单头丝杆以转移待更换绝缘子串第一片绝缘子的载荷至单头丝杆;S300. Tighten the single-ended screw to transfer the load of the first insulator of the insulator string to be replaced to the single-ended screw;

S400、取下待更换绝缘子串第一片绝缘子碗头挂板与联板的连接螺栓;S400. Remove the connecting bolts connecting the first insulator bowl head hanging plate and the connecting plate of the insulator string to be replaced;

S500、松弛单头丝杆以转移待更换绝缘子串的载荷至绝缘拉杆;S500. Loosen the single-head screw to transfer the load of the insulator string to be replaced to the insulating pull rod;

S600、更换绝缘子串;S600, replace the insulator string;

S700、松弛单头丝杠并拆除更换工具。S700. Loosen the single-head screw and remove the replacement tool.

使用本发明在带电更换绝缘子作业时不使用托瓶架,通过微过牵引法更换绝缘子串,使得作业过牵引长度由原来的150-200mm减少到15mm左右,大大减少了收紧线操作的过牵引量,因而大大降低了收紧线时导线施工应力,提高了作业的安全程度。Using the present invention does not use the bottle holder when replacing the insulator with electricity, and replaces the insulator string through the micro-over-drawing method, so that the over-drawing length of the operation is reduced from the original 150-200mm to about 15mm, and the over-drawing operation of tightening the line is greatly reduced. The amount, thus greatly reducing the conductor construction stress when tightening the line, improves the safety of the operation.

附图说明Description of drawings

图1为本发明带电更换变电站500kV耐张绝缘子串的工具的结构示意图。Fig. 1 is a structural schematic diagram of a tool for live replacement of a 500kV tension insulator string in a substation according to the present invention.

图2为绝缘拉杆与架构连接端的放大示意图。Fig. 2 is an enlarged schematic diagram of the connecting end of the insulating tie rod and the structure.

图3为绝缘拉杆与联板卡具连接端的放大示意图。Fig. 3 is an enlarged schematic diagram of the connecting end of the insulating pull rod and the connecting plate fixture.

具体实施方式detailed description

下面结合附图和具体实施例对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

如图1所示,本发明带电更换变电站500kV耐张绝缘子串的工具包括联板卡具1、绝缘子上卡3、单头丝杆4(41、42)、绝缘滑车11、绝缘拉杆2(21、22)。联板卡具1固定于绝缘子串导线侧联板,绝缘子上卡3固定于待更换绝缘子串5的第二片绝缘子上,单头丝杆4(41、42)设置在联板卡具1和绝缘子上卡3的两侧,绝缘滑车11设于联板卡具1上,绝缘拉杆2(21、22)的两端分别连接联板卡具1与架构塔6,其中绝缘拉杆2(21、22)的一端通过抱箍(211、221)固定于架构塔6上。As shown in Fig. 1, the tool of the present invention for live replacement of a 500kV strain insulator string in a substation includes a connecting plate clamp 1, an insulator upper clamp 3, a single-ended screw rod 4 (41, 42), an insulating pulley 11, and an insulating pull rod 2 (21 ,twenty two). The connecting plate fixture 1 is fixed on the side connecting plate of the insulator string conductor, the insulator upper clamp 3 is fixed on the second insulator of the insulator string 5 to be replaced, and the single-ended screw rod 4 (41, 42) is arranged on the connecting plate fixture 1 and On both sides of the clamp 3 on the insulator, the insulating pulley 11 is arranged on the connecting plate fixture 1, and the two ends of the insulating pull rod 2 (21, 22) are respectively connected to the connecting plate clamp 1 and the structure tower 6, wherein the insulating pull rod 2 (21, 22) One end of 22) is fixed on the construction tower 6 by hoops (211, 221).

通过上述带电更换变电站500kV耐张绝缘子串的工具进行绝缘子串更换包括以下步骤:The replacement of insulator strings by using the above-mentioned tools for live replacement of 500kV tension insulator strings in substations includes the following steps:

S100、安装卡具:等电位电工吊上联板卡具1、绝缘拉杆2(21、22)、单头丝杆4(41、42)、绝缘子上卡3、绝缘滑车11等工具,在待更换绝缘子串两端安装好。S100. Fixtures for installation: tools such as fixture 1 for the equipotential electrician to hang the connecting plate, insulating pull rod 2 (21, 22), single-head screw rod 4 (41, 42), insulator upper clamp 3, insulating pulley 11 and other tools. Replace the insulators at both ends of the string and install them.

S200、安装绝缘滑车11,将绝缘吊绳穿过联板卡具1上的绝缘滑车11系在更换绝缘子串5的第三片绝缘子上。S200 , install the insulating tackle 11 , and tie the insulating sling through the insulating tackle 11 on the connecting plate jig 1 to the third insulator of the replacement insulator string 5 .

S300、收紧单头丝杆4(41、42)以转移待更换绝缘子串第一片绝缘子的载荷至单头丝杆4(41、42)。S300. Tighten the single-ended screw mandrel 4 (41, 42) to transfer the load of the first insulator of the insulator string to be replaced to the single-ended screw mandrel 4 (41, 42).

S400、取下待更换绝缘子串第一片绝缘子碗头挂板与联板的连接螺栓。S400. Remove the bolts connecting the first insulator bowl head hanging plate and the connecting plate of the insulator string to be replaced.

S500、松弛单头丝杆4(41、42)以转移待更换绝缘子串的载荷至绝缘拉杆(21、22)。S500. Loosen the single-ended screw mandrel 4 (41, 42) to transfer the load of the insulator string to be replaced to the insulating pull rod (21, 22).

S600、更换绝缘子串5。S600. Replace the insulator string 5.

S700、松弛单头丝杠4(41、42)并拆除更换工具。S700. Loosen the single-head screw 4 (41, 42) and remove the replacement tool.

Claims (1)

1. a kind of instrument of use charged for replacement transformer station 500kV strain insulator strings carries out replacing insulator string method, described Instrument includes card, single head screw mandrel, insulation coaster, insulated tension pole on link plate clamping tool, insulator, and the link plate clamping tool is fixed on insulation Fixed on substring side of wire yoke plate, insulator due on second insulator of insulator chain to be replaced, single head screw mandrel is arranged on The both sides blocked on link plate clamping tool and insulator, insulation coaster is on link plate clamping tool;One end of insulated tension pole is fixed by anchor ear In on framework tower, the other end is connected with link plate clamping tool;
Comprise the following steps characterized in that, carrying out replacing insulator string method:
S100, installation fixture:Equipotential electrician hang on link plate clamping tool, insulated tension pole, single head screw mandrel, on insulator card, insulation slide Turner has, and is installed at insulator chain two ends to be replaced;
S200, insulation coaster is installed, insulated sling is tied up to the of replacing insulator chain through the insulation coaster on link plate clamping tool On three insulators;
S300, tighten up single head screw mandrel to shift the load of insulator chain first insulator to be replaced to single head screw mandrel;
S400, the connecting bolt for removing insulator chain first insulator socket-clevis eye to be replaced and yoke plate;
S500, relaxation single head screw mandrel are to shift the load of insulator chain to be replaced to insulated tension pole;
S600, replacing insulator chain;
S700, relaxation single head leading screw simultaneously remove replacing instrument.
CN201410722424.9A 2014-12-02 2014-12-02 The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings Active CN104505766B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410722424.9A CN104505766B (en) 2014-12-02 2014-12-02 The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410722424.9A CN104505766B (en) 2014-12-02 2014-12-02 The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings

Publications (2)

Publication Number Publication Date
CN104505766A CN104505766A (en) 2015-04-08
CN104505766B true CN104505766B (en) 2017-07-21

Family

ID=52947496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410722424.9A Active CN104505766B (en) 2014-12-02 2014-12-02 The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings

Country Status (1)

Country Link
CN (1) CN104505766B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105429054A (en) * 2015-12-29 2016-03-23 广西电网有限责任公司玉林供电局 Universal fixture for lively replacing entire glass insulator string on strain pole
CN107732784A (en) * 2017-11-28 2018-02-23 云南电网有限责任公司昆明供电局 Live replacement of 220 kV tension-resistant double insulator string LF yoke plate special mould clamps
CN110364960B (en) * 2019-07-16 2024-06-25 云南电网有限责任公司曲靖供电局 Strain insulator single-string insulator overhauls platform
CN110854736B (en) * 2019-11-22 2021-04-16 云南电网有限责任公司红河供电局 Method for assisting electric field feeding by adopting insulating bottle supporting frame
CN112993858A (en) * 2021-03-26 2021-06-18 国家电网有限公司 Tool for replacing insulator string of ultra-high voltage transmission line in electrified manner
CN114221255A (en) * 2021-11-26 2022-03-22 国家电网有限公司 +/-800 kV extra-high voltage direct current line live working squirrel-cage type tubular bus-bar wire-lifting clamp
CN114362080A (en) * 2021-12-15 2022-04-15 贵州电网有限责任公司 Novel 10kV line fixing wire device
CN114362049A (en) * 2022-01-19 2022-04-15 云南电网有限责任公司曲靖供电局 A complete set of tools for live replacement of 10kV line tension insulators by indirect method and their use methods

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2552142Y (en) * 2002-04-22 2003-05-21 杨福民 Tension-proof horizontal isolator hot-line replacing device
JP2014183688A (en) * 2013-03-21 2014-09-29 Chugoku Electric Power Co Inc:The Load cancellation device for insulator
CN103944107A (en) * 2014-05-12 2014-07-23 国家电网公司 Tool for electrified replacement of 500kV strain insulator string

Also Published As

Publication number Publication date
CN104505766A (en) 2015-04-08

Similar Documents

Publication Publication Date Title
CN104505766A (en) Tool and method for live replacement of 500kV strain insulator strings in substations
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN103606854A (en) Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode
CN203456796U (en) Broadsword fixture for replacing single insulator of duplex insulator string during power failure
CN101546894B (en) Method for replacing 220KV steel pipe tower composite insulator electrifiedly
CN102185267B (en) 66KV ground potential hot-line make-and-break bypassing method
CN105162028A (en) Method for replacing linear insulator of 220kV steel pipe tower in live working state
CN105811313A (en) Linear insulator replacement tool and application method thereof
CN103887735A (en) Linear charged wire lifting device of electric transmission line
CN102623927B (en) Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method
CN203787855U (en) Power transmission line linear charged wire lifting device
CN204927971U (en) A embrace pole for electrified insulator chain that changes of transmission line
CN103779809B (en) The two oidiospore wire pitch operational method of charged adjustment
CN203352104U (en) Multifunctional insulating cross arm
CN205159908U (en) Backup protection fixing -line device
CN209562011U (en) It is arranged vertically 10kV overhead transmission line on-load and replaces on-pole switch device
CN201853968U (en) Single-hook insulating yoke plate
CN204131004U (en) Four loop straight line steel tube tower circle cross-arm jigs
CN204741222U (en) Portable multi -functional transmission line interruption maintenance appurtenance
CN211701243U (en) A jumper spacer bar electrified defect elimination device
CN201312079Y (en) Clamping apparatus for live line replacement of suspended insulator in middle of 500KV untypical tangent tower via splicing method
CN204441800U (en) A kind of 500kV compact line V-type replacing insulator string jig
CN102420402A (en) New Technology of Live Fastening Drainage Wire Clamp
CN205609778U (en) Two division C molded lines clamping connection ground wires in big line footpath are hung and are established device
CN205141333U (en) Earth connection hangs specialized tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Deng Ke

Inventor after: Wan Wenjie

Inventor after: Wei Qiulei

Inventor after: Zhang Qiushi

Inventor after: Wang Qin

Inventor after: Li Ting

Inventor after: Wei Lifang

Inventor before: Deng Ke

Inventor before: Wan Wenjie

Inventor before: Wei Qiulei

Inventor before: Zhang Qiushi

CB03 Change of inventor or designer information